Loading...
HomeMy WebLinkAbout17050_MERCER, GARY AND TAYLORS CK HOA_19970403CAMA AND DREDGE AND FILL GENERAL PERMIT Applicant Name Address City Project Locati n (Cou,„n r t'A 1 ( F as authorized by the State of North Carolina Department of Environment, Health, and Natural Resources and toe C as&J Resources Commission in an area of environmental concern pursuant to 15A NCAC t' hone Numb s 1 2 � rD if �3 tO ,State Road Waterg3ody PROJECT DESCRIPTION I SKETCH Pier (dock) length Groin length- number - Bulkhead length max. distance offshore Basin, chhaa nel dim n i ubic yards Boat ramp lim densi — Other This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to be- come null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal Management Program. State _ t,.j C 0 90 Zip (SCALE: a applicant's signature permit otticer's signature f� issuing date } C, / expiration date `'t attachments 1 r C �� � • f.—/ ro J application fee GARY A. MERCER NC 1776645 JUDY S. MERCER NC 3185458 2503 FRONT ST PH 919-728-4648 BEAUFORT, NC 28516 1811 66-152/531 co % DOLLARS 0 i�civa:n rmmr.. tachovla Bank of Nort Jackssoonville, NC 2, i9U a ollna, Nnq, FOR (Y -/ / D SD �c �S3101529�: 4189 105314u� .% < t' J < tl1 - IA r- 2Sy3 F vz o ry T S-77 QE Wu. 2�w LENIVOXILL R jW -- t ,1 I i E 7 L ,;,N 0.) 7-1 L nn c� i h D�L� (�iP6 �, ry ti ti1 tz� ULt1rt� ��(��c�tS �J �Y.i�11Vb Y TA rvrL C' U tt' o S .4-- �X1TItj1.4f'vk0 ReExiwwt T yPf«+�- Ciicr Se--Z- ioAJ C-rZAr CCNCCEr Gv1.At5 jU n'r- -M 5 c,^LC- t/CtSING ckv .;(.. Form DCM-MP-1 APPLICATION (To be completed by all applicants) I. APPLICANT a. Landowner: Name Gary A. Mercer Address 1301 Lennoxville Road City Beaufort State N. C. Zip 28516 Day Phone (919) 728-6636 Fax (919) 728-1490 b. Authorized Agent: Name Gary A. Mercer Address 1301 Lennoxville Road City Beaufort State N. C . Zip 28516 Day Phone (919) 728-6636 Fax (919) 728-1490 c. Project name (if any) Taylor's Creek Homeowners Association NOTE: Permit will be issued in name of landowner(s), and/or project name. 2. LOCATION OF PROPOSED PROJECT a. County Carteret b. City, town, community or landmark Beaufort c. Street address or secondary road number d. Is proposed work within city limits or planning jurisdiction? x Yes No e. Name of body of water nearest project (e.g. river, creek, sound, bay) Cowpen Creek, Taylors Creek 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Dredging up to 1000 cy from Cowpen Creek. Restabilize existing pier supports. b. Is the proposed activity maintenance of an existing project, new work, or both? Maintenance c. Will the project be for public, private or commercial use? Private. d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. Dredging of Cowpen Creek to average depth of 6.0 feet to facilitate boat access. Existing pier supports will be replaced with deeper ones to maintain stability resulting from dredging activity. Revised 03/95 t Form DCM-MP-1 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract 7.53 ac b. Size of individual lot(s) 10,000 sf c. Approximate elevation of tract above MHW or NWL 4.5'-5.0' d. Soil type(s) and texture(s) of tract sand e. Vegetation on tract marsh grass f. Man-made features now on tract 15 lot subdivision- half developed. g. What is the CAMA Land Use Plan land classification of the site? (Consull the local land use plan.) Conservation _ x Developed Rural Transitional Community Other h. How is the tract zoned by local government? R-10 i. Is the proposed project consistent with the applicable zoning? X Yes No (Attach Zoning compliance certificate, if applicable) j. Has a professional archaeological assessment been done for the tract? Yes X No If yes, by whom? k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes X No 1. Are there wetlands on the site? X Yes No Coastal (marsh) X Other If yes, has a delineation been conducted? yes (Attach documentation, if available) m. Describe existing wastewater treatment facilities. on -site recirculating sand filter with disposal fields. n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges.) surface runoff and detention pond. o. Describe existing drinking water supply source. private well. 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: • A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. • An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale in black ink on an 8 1/2" by II" white paper. (Refer to Coastal Resources Commission Rule 73.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue -line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the Revised 03/95 Form DCM-MP-1 site. Include highway or secondary road (SR) numbers, landmarks, and the like. • A Stormwater Certification, if one is necessary. • A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name Address Phone Name Address Phone Name Address Phone See Attached Letters • A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. • A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. • A signed AEC hazard notice for projects in oceanfront and inlet areas. • A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the 28th day of February , 19_7 Print Name Signature Landowner or horized Agent Please indicate attachments pertaining to your proposed project. X DCM MP-2 Excavation and Fill Information DCM MP-3 Upland Development X DCM MP-4 Structures Information DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development NOTE. Please sign and date each attachment in the space provided at the bottom of each form. Revised 03M Fortis DCM-MP-2 EXCAVATION AND FILL (Except bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Describe below the purpose of proposed excavation or fill activities. All values to be given in feet. Average Final Existing Project Length Width Depth Depth Access channel (MLW) or (NWL) Canal Boat basin Boat ramp Rock groin Rock breakwater Other (Excluding shoreline stabilization) 1. EXCAVATION a. Amount of material to be excavated from below MHW or NWL in cubic yards 985 cy b. Type of material to be excavated sand/silt c. Does the area to be excavated include coastal wetlands (marsh), submerged aquatic vegetation (SAVs) or other wetlands? Yes X No d. Highground excavation in cubic yards o.0 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area Beaufort Fisheries b. Dimensions of disposal area 150x150x4.0 c. Do you claim title to disposal area? Yes X No If no, attach a letter granting permission from the owner. d. Will a disposal area be available for future maintenance? X Yes No If yes, where? Same location. Revised 03/95 Form DCM-MP-2 e. Does the disposal area include any coastal wetlands (marsh), SAVs or other wetlands? Yes x No f. Does the disposal include any area in the water? Yes x No 3. SHORELINE STABILIZATION a. Type of shoreline stabilization Bulkhead Riprap b. Length c. Average distance waterward of MHW or NWL d. Maximum distance waterward of MHW or NWL e. Shoreline erosion during preceding 12 months (Source of information) f. Type of bulkhead or riprap material g. Amount of fill in cubic yards to be placed below water level (1) Riprap (2) Bulkhead backfill h. Type of fill material i. Source of fill material 4. OTHER FILL ACTIVITIES (Excluding Shoreline Stabilization) a. Will fill material be brought to site? Yes No If yes, (1) Amount of material to be placed in the water (2) Dimensions of fill area (3) Purpose of fill b. Will fill material be placed in coastal wetlands (marsh), SAVs or other wetlands? Yes No If yes, (1) Dimensions of fill area (2) Purpose of fill 5. GENERAL. a. How will excavated or fill material be kept on site and erosion controlled? Existing berm at disposal site surrounds area where material will be stored. b. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? Hydraulic Dredge. c. Will wetlands be cr3ssed in transporting equipment to project site? Yes x No If yes, explain steps that will be taken to lessen environmental impacts. Applican r Project Name Signature 0 —z —i 2 Date Revised 03195 Form DCM-MP4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application which relate to this proposed project. a. Dock(s) and/or Pier(s) (1) _ Commercial _Community _ Private (2) Number (3) Length (4) Width (5) Finger Piers Yes No (i) Number (ii) Length (iii) Width (6) Platform(s) Yes No (i) Number (ii) Length (iii) Width (7) Number of slips proposed (8) Proximity of structure to adjacent riparian property lines (9) Width of water body (10) Water depth at waterward end of pier at MLW or NWL b. Boathouse (including covered lifts) (1) Commercial Private (2) Length (3) Width c. Groin (e.g. wood, sheetpile, etc.) (1) Number (2) Length(s) d. Breakwater (e.g. wood, sheetpile, etc.) (1) Length (2) Average distance from MHW, NWL or wetlands (3) Maximum distance beyond MHW, NWL or wetlands e. Mooring buoys (1) _ Commercial _Community _ Private (2) Number (3) Description of buoy (Color, inscription, size, anchor, etc.) (4) (5) Width of water body _ Distance buoy(s) to shoreline be placed beyond f. Mooring structure (boatlift, mooring pilings, etc.) (1) _ Commercial _Community _ Private (2) Number (3) Length (4) Width g. Other (Give complete description) Removal of existing waterward riles and replacing with deeper piles due to loss of supporting canal material from dredging process. Applicant Project Name Signature Date Revised 03/95 WHEATLY, WHEATLY, NOBLES & WEEKS, P.A. ATTORNEYS AT LAW 410 Front Street P. O. Box 360 Beaufort, N. C. 28516-0360 CLAUD R WHEATLY, JR (919) 728-3158 CLAUD R WHEATLY, III Fax (919) 728-5282 JOHN E NOBLES, JR STEVENSON L. WEEKS J. CHRISTY MAROULES STEPHEN M. VALENTINE February 19, 1997 Mr. Charles Jones CAMA Office llr Marine Fisheries Buil¢�ing Morehead City, NC 28;57 RE: Application for Dredge Permit and Dock Maintenance by Gary Mercer on behalf of Taylor's Creek Subdivision Dear Charles: As adjoining property owners to Cowpen Creek, please be advised that we have no objection to the issuance of a dredge maintenance permit to Gary Mercer acting for himself and for Taylor's Creek Subdivision with regards to maintenance dredging of Cowpen. Creek and Taylor's Creek. Please also be advised that we have no objection to Taylor's Creek Subdivision performing repairs and maintenance to their existing dock. Should you have any questions, please advise. With kind regards, I am Very t u yours, tev n n eeks L�d- s4k Stephen M. Valentine SLW:te TAYLOR'S CREEK OWNERS' ASSOCIATION, INC P. O. BOX 435 BEAUFORT, NORTH CAROLINA 28516 February 21, 1997 Mr. Charles Jones CAMA Office Marine Fisheries Building Morehead City, NC 28557 Re: Application for Dredge Permit and Dock Maintenance by Gary Mercer on Behalf of Taylor's Creek Subdivision Dear Charles: f Taylor's Creek Owners; Association, Inc. has no objection to the issuance of a dredge maintenance permit to Gary Mercer with regard to maintenance dredging of Cowpen Creek and Taylor's Creek. We hereby consent to both the issuance of a maintenance dredging permit and repairs to the existing homeowners' association dock and pilings as a -result thereof. TAYLOR'S CREEK OWNERS' ASSOCIATION, INC. BY (SEAL) Pr nt