Loading...
HomeMy WebLinkAboutGeneral Permits (5205)'-- CERTIFICATION OF ^�� ��������k^�� �������U ��~���J��� ����»� ���- EXEMPTION ��~���� . FROM REQUIRING A CANYA PERMIT aaauthorized bythaStatoofNorthOoro|ina, Department cfEnvironment, Health, and Nouund Resources and the Coastal Resources Commission ( - inonarea cdenvironmental concern pursuant to15NCACSubchapter 7K.02o3. Project Location (Co nt State Road, Water Body, 9tc.) L-a,:7 Type and Dimensions of Project The proposed project oobelocated and constructed andescribed above ishereby certified as exempt from the CAMApermit re- quirement pumuunt10 15 NCAC7K.O203. This exemption to CAW\A permit requirements does not alleviate the neoanody of your obtaining any other State, Federal, orLocal authorization. State zip Z � m This certification ofexemption from requiring oCAK8Apermit is valid for gOdays from the date ofissuance. Following expiration, are-examination ofthe project and project site may benecessary vucontinue this certification. SKETCH (SCALE: � �� / --r--�-----�--� ^ ~ --r�---- ' Any pe ` n who proceeds with a development without the con- sent ofoCAMAcffkcialundarthemistakenmeumptionthat the development isexempted, will bo\nviolation ofthe CAMAif there ioasubsequent determination that opermit was required for the development. The applicant certifies bysigning this exemption that (1) the ap- plicant has mad and will abide bythe conditions of this exemp- tion, and (2) a written statement has been obtained f rom adjacent landowners certifying that they have no objections to the proposed work. osiomatum x // ,- CAMAOMicia[onignakune Issuing date -�� 3� Expiration date Attachment: 15North Carolina Administrative Code 7K.0203