HomeMy WebLinkAbout43678_TEMPLE, EARL_20051230 (2)�AP,/ A / 0 DREDGE & FILL
1r . 43678
pENERAL PERMIT
Previous permit# ( —�
�- New ❑Modification ❑Complete Reissue
❑Partial Reissue Date previous permit issued H --5 J15
As authorized by the State of North Carolina, Department of Environment and Natural Resources r� �J O C>
and the Coastal Resources Commission in an area of environmental
concern pursuant to I SA NCAC (/
r
Applicant Named ���
� ^A ❑ Ru s attached.
Project Location: County `���
Address (I (Doc L&e,
_'_-
Street Address/ State Road/ Lot #(s)
City k4W Be; N3 State ZI PJRp Pat 0 �-
Phone # (�� 3�i -�cs �j Fax # O
Subdivisio
Authorized Agent
City! Kam- ZIP 28
Affected ❑ CW S1 TA ❑ ES ❑ PTS
Phone # ( ) _ River Basin
❑ OEA ❑ HHF ElIH ElUBA El N/A
AEC(s):
M i �� C- _ L
Adj. Wtr. Body ' `� �^ nat /man unkn
❑ PWS: ❑ FC:
ORW: yes / no� PNA ('y-e's*%J no Crit. Hab.
yes / no Closest Maj. Wtr. Body �V
Type of Project/ Activity �f' Gt� 1'e��"� �°�J { a� •t'�il�cc'r �� H^
,i
Pier (dock) length X
14(Scale: 0311'L' )
Sandbags: not sureyes L
Moratorium: n/a es o ` _ _-
T
Photos: yes --
Waiver Attached: yes
A building permit may be required by: E-- ee note on back
regarding River Basin rules.
Notes/ Special Conditions 0, r� "T� /1 J
y
Agent or Applicant Printed N me
ex -
Signature * Please read compliance sfatementon backof permit"
fft4-
A..nlirotinn
Permit OffigOrs Signature
��- -0
Issuing Date
Expiration Date
Local Planning lurisdiction
Rover File Name
I
A'11'ila
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., Secretary
December 30, 2005
Earl Temple
111 Doe Lane
New Bern, NC 28562
Dear Mr. Temple:
Attached is General Permit #43678C- to replace existing docks in exact same footprint as existed
prior to hurricane Ophelia, at 2022 Temple Point Rd, Havelock, NC
In order to validate this permit, please sign the permit as indicated. Retain the white copy for
your files and return the signed yellow and pink copies to us in the enclosed, self-addressed
envelope. If the signed permit copies are not returned to this office before the initiation of
development, you will be working without authorization and will be subject to a Notice of
Violation and subsequent civil penalties.
We appreciate your early attention to this matter.
Sin erely,
Steph 'n Lane
Coastal Management Representative
lsb
Enclosures
400 Commerce Avenue, Morehead City, North Carolina 28557
Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastalmanagement.net
An Equal Opportunity 1 Affirmative Action Employer— 50% Recycled 110% Post Consumer Paper
c�
�`y,r'Cyr<��..,.�..r��>::�-�-q::Ox'��O>+lxC3-x'`�S�'\✓�'��ar'�.�r�'�O�•-�'ti�Vn`+rCYrO�-+��.:5.>1.+:.:,...,:y�.�rp,rp
' Perr,: it i lumber
1-NTINDED STATE OF NORTH CAROLINA. 139-98
_ Department of Environment and Natural Resources
and
0�slol Resources Corninission
` -5b N O V 12
for
X Major Development in an Area of Environmental Concern' --
pursuant to NCGS 113A-118
Excavation and/or filling pursuant to NCGS 113-229
Issued to Earl Temple, 242-65 Tem
authorizing development in
le Point Road, F-favelock.., TIC 28532
Craven
County at Mitchell Creek, off of SR1711, Temple Point
Road , as requested in the permittee's application dated 1/15/98 including attached work
plan drawings, 1, for added boat slips, dated 4/98.
T1us permit, issued on \ \ -- 'Z� S lS , is subject to compliance with the application (where consistent
Nvith the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void.
Total Platform Coverage
1) Under the Rules of the Coastal Resources Commission the permittee's total platform coverage can
only be authorized for 656 feet, i.e., 4 x property width of 164'. Existing and proposed coverage of
pier T-head and finger piers is 780'. Therefore, the coverage proposed must be reduced by 124 sq.
ft. This could be accomplished by reducing length and/or width of finger piers, e.g.
Boat Launching Ramp Deleted
2) The proposed boat ramp and associated service pier is not authorized and is hereby deleted from the
project plans due to the presence of coastal marsh and submerged aquatic vegetation. This deletion
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the
issuing date. An appeal requires resolution prior to work
initiation or continuance, as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not
covered hereunder requires further Departmental approval.
All work must cease when the permit expires on
December 31, 2001
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina
Coastal Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
Donna D. ffitt,Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
PIER DETAIL
Four Proposed Slips
S�.
20'
-2"
Ramp and Walkway
see Detail Sheet
Earl Temple Project
Mitchell Creek -Craven County,NC
Pier Expansion-4 additional slips and boat ramp
April 1998 1 "=20'
6' q 18'
u
u
j