HomeMy WebLinkAbout10063_General Permit_19920618O
CAMA AND DREDGE AND FILL _.
GENERAL t
PERMIT s;,,r�` -` 10063 .
as authorized by the State of North Carolina
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC 7H ,150(,
Applicant Name Cot.inty of Dare Phone Number 919-473-1101
Address dP. O. Rox 1000
City
"Ian State `�?C Zip 27954
Project Location (County, State Road, Water Body, etc.) Walter Sloucfh, between markers 012" and "13
Oregon Inlet, Dare county
Type of Project Activity Channel laintenanee Excavation to -A' BZW
1000 cubic yards maximum to be removed
PROJECT DESCRIPTION I SKETCH
(SCALE:
Pier (dock) length
Groin length
number Condi tions : -
Bulkhead length
i. Excavation shall not exceed —8' ivakJ and shall not
max. distance offshore exteddbeyond the channel as defined by the existing
USCG markers nt.-rbered "2" throcth "13".
Basin, channel dimensions. 2. All spoil material shall be deposited in the
an spoil disposal site east of the Herbert
Bonner Bridge of in the approved ocean disposal site.,
cubic yards No more than 1000 cubic yards of spoil material may
pY_::, re -roved under this pernit.
Boat ramp dimensions
Other
This permit is subject to compliance with this application, site
drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine,
imprisonment or civil action; and may cause the permit to be-
come null and void.
This permit must be on the project site and accessible to the
permit officer when the project is inspected for compliance.
The applicant certifies by signing this permit that 1) this pro-
ject is consistent with the local land use plan and all local
ordinances, and 2) a written statement has been obtained from
adjacent riparian landowners certifying that they have no
objections to the proposed work.
applicant's signature
� a
permit officer's signature
June 18, 1` A2
issuing date
attachments 7H. 1500
July 18, 19;'2
expiration date
In issuing this permit the State of North Carolina certifies that
this project is consistent with the North Carolina Coastal application fee $50 to he ,)aid ASAP
Management Program.