Loading...
HomeMy WebLinkAbout10063_General Permit_19920618O CAMA AND DREDGE AND FILL _. GENERAL t PERMIT s;,,r�` -` 10063 . as authorized by the State of North Carolina Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC 7H ,150(, Applicant Name Cot.inty of Dare Phone Number 919-473-1101 Address dP. O. Rox 1000 City "Ian State `�?C Zip 27954 Project Location (County, State Road, Water Body, etc.) Walter Sloucfh, between markers 012" and "13 Oregon Inlet, Dare county Type of Project Activity Channel laintenanee Excavation to -A' BZW 1000 cubic yards maximum to be removed PROJECT DESCRIPTION I SKETCH (SCALE: Pier (dock) length Groin length number Condi tions : - Bulkhead length i. Excavation shall not exceed —8' ivakJ and shall not max. distance offshore exteddbeyond the channel as defined by the existing USCG markers nt.-rbered "2" throcth "13". Basin, channel dimensions. 2. All spoil material shall be deposited in the an spoil disposal site east of the Herbert Bonner Bridge of in the approved ocean disposal site., cubic yards No more than 1000 cubic yards of spoil material may pY_::, re -roved under this pernit. Boat ramp dimensions Other This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to be- come null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. applicant's signature � a permit officer's signature June 18, 1` A2 issuing date attachments 7H. 1500 July 18, 19;'2 expiration date In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal application fee $50 to he ,)aid ASAP Management Program.