HomeMy WebLinkAbout7251_SWANNER JR, JAMES_19901206CAMA AND DREDGE AND FILL
GENERAL
PERMIT
as authorized by the State of North Carolina,
Department of Natural Resources and Community Development and the Coastal Resources Commission
in an area of environmental concern pursuant to 1.) NCAC 'l4l . I-1
Applicant Name , �Q�-k SWG,1N,(\ r r Phone Number rAIq -1R'�� a(oa, i- N
Address \\ QSO�-
City NA1MC3 State N C zip
Project Location (County, State Road, Water Body, etc.) 4?(4C�r � CO
D E C 1990
147251 g
Type of Project Activity
PROJECT DESCRIPTION SKETCHHN,
V
Pier (dock) length
Groin length-
N oc ��_ C-11-k
�-O,\cm --'�
number
r (fir ? 1 Q O
d length
vBasimax. distance offshore f-,At,
n, channel dimensions`'V
cubic yards /
Boat ramp dimensions 1�
Other
This permit is subject to compliance with this application;-?te
4 t n",N I ax
t
(SCALE: NCiN(�
Nv
R Qv G � 1ct
drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine,
imprisonment or civil action; and may cause the permit to be applicant's signature
come null and void. r_\11 • n I 1 M
This permit must be on the project site and accessible to the
permit officer when the project is inspected for compliance.
The applicant certifies by signing this permit that 1) this pro-
ject is consistent with the local land use plan and all local
ordinances, and 2) a written statement has been obtained from
adjacent riparian landowners certifying that they have no
objections to the proposed work.
permit officer's signature
ly ti Z `Cac) Co mwC\� 1,1 `'`
issuing date expiration date
attachments
In issuing this permit the State of North Carolina certifies that
this project is consistent with the North Carolina Coastal application fee_�j Can%
Management Program.
DEC 1 0 19s0
1
State of North Carolina -----------------------
Department of Environment, Health, and Natural Resources
Division of Coastal Management
225 North McDowell Street • Raleigh, North Carolina 27602
James G. Martin, Governor Roger N. Schecter
William W Cobey, Jr., Secretary Director
oa STA7F a
b
5 December 1990
Mr. James Swanner Jr.
Route 1, Box 679
Plymouth, North Carolina 27962
Dear Mr. Swanner:
This letter is in reference to our telephone conversation on 4 December 1990 and
my subsequent site visits to your property on North Creek on 5 and 6 December
1990. The purpose of the telephone conversation was to discuss changes on
General Permit #6624-B. General Permit #6624-B was issued to you on 16 October
1990 for the construction of a bulkhead on your property off SR 1731 on North
Creek in Beaufort County.
North Carolina Administrative Code (herein abbreviated N.C.A.C.)
T15A:07H.1105(a) states: "This general permit is applicable only along
shorelines void of wetland vegetation including marsh grass and wooded swamp, or
where all construction is to be accomplished landward of such vegetation." As
we discussed, my original bulkhead alignment was waterward of coastal wetlands.
These wetlands contain both marsh grass species under the jurisdiction of the
Division of Coastal Management and other wetland species under the jurisdiction
of the U.S. Army Corps of Engineers. Because the original alignment violated
N.C.A.C. T15A:07H.1105(a), the alignment must be moved landward and out of
coastal wetlands.
Raleigh Bland (Field Representative for the Division of Coastal Management in
the Washington Regional Office) and I were onsite the aforementioned property on
5 December 1990 to change the alignment of the bulkhead. This alignment
delineates the change from upland grass species to wetland species and has been
verified by Terry Moore (District Manager for the Division of Coastal Management
in the Washington Regional Office). David Lekson (U.S. Army Corps of Engineers,
COE District Manager), Raleigh Bland and I were onsite the aforementioned
property on 6 December 1990. The purpose of Mr. Lekson's visit was to delineate
COE jurisdictional wetlands as per your request. Mr. Lekson delineated a line
consistent with current federal regulations. If you have any questions
concerning COE criteria for wetlands you can contact Mr. David Lekson at
919-975-3123 in the Washington Office. The line delineated by Mr. Lekson is
landward of the line delineated by the Division of Coastal Management and will
be the alignment for the proposed bulkhead. The new alignment conforms to
P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293
An Equal Opportunity Affirmative Action Employer
Mr. James Swanner Jr.
Page Two
N.C.A.C. T15A:07H.1105(a) and to COE regulations. I have enclosed a copy of
GP #6624-B that has been modified to show the change in the alignment. As we
discussed, rock riprap can be used in place of a wooden bulkhead as long as the
toe of the riprap is landward of the new staked alignment.
I apologize for any inconvenience this change may cause you and thank you for
your cooperation in clearing this matter up. If I can be of further assistance
to you please let me know.
Sincerely,
David W. Moye
Field Representative
DWM/aht
cc: Terry Moore - District Manager, Washington Office, DCM
,P`r`eston Pate - Assistant Director. DCM
Raleigh Bland - Field Representative, DCM
Wayne Wright - U.S. Army Corps of Engineers
David Lekson - U.S. Army Corps of Engineers