HomeMy WebLinkAboutGeneral Permits (4782)CERTIFICATION OF EXEMPTI
_Y Are 2 1991
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina, i.1 (v LJ
Department of Environment, Health, and Natural Resources and the Coastal Rrupi ;;i---------
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203.
Applicant Name L v!n _ ' r Phone Number Z r> ! 1-2 66
Address ! V^ok 3 Lz",
City State NJ c- Zip 7- n
Project Location (County, State Road, Water Body, etc.) r' e-v, a a,— M 10 �- ► l AVl �? 11 t
M (an, _ V\.^ CA ("(I , r� E!"1g A t I A,, v\/ t
Type and Dimensions of Project c Y I �� t 4.4 "
The proposed project to be located and constructed as described
above is hereby certified as exempt from the CAMA permit re-
quirement pursuant to 15 NCAC 7K .0203. This exemption to
CAMA permit requirements does not alleviate the necessity of
your obtaining any other State, Federal, or Local authorization.
This certification of exemption from requiring a CAMA permit is
valid for 90 days from the date of issuance. Following expiration,
a re-examination of the project and project site may be necessary
to continue this certification.
SKETCH (SCALE: ) I
n... ..L... ...7.. .;H. ., .4......L........nf a 41n i + 4ho
sent of a CAMA official under the mistaken assumption that the
development is exempted, will be in violation of the CAMA if there
is a subsequent determination that a permit was required for the
development.
con- .�
The applicant certifies by signing this exemption that (1) the ap-
plicant has read and will abide by the conditions of this exemp-
tion, and (2) a written statement has been obtained from adjacent
landowners certifying that they have no objections to the
proposed work.
Applicant's signature
CAMA Official's signature
Issuing date
Expiration date
Attachment: 15 North Carolina Administrative Code 7K .0203
State of North Carolina
Department of Environment, Health, and Natural Resources
Division of Coastal Management
James G. Martin, Governor
William W. Cobey, Jr., Secretary
August 19, 1991
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
Mr. William Pitt
Route 1, Box 323B
Rocky Mount, North Carolina 27803
Dear Mr. Pitt:
Roger N. Schecter
Director
This is with reference to the pier you propose to have built on
lot 36 Mir -Mar Mobile home park in a man-made basin off the AIWW in
Surf City, Pender County, North Carolina.
As was explained to you, the Coastal Area Management Act (LAMA)
does not authorize piers or docks across marsh wider than 6' under the
exemption issued to you (copy attached).
We will monitor the authorized work to ensure it complies with our
regulations.
If you have questions concerning the above or if I can be of any
other assistance, please advise.
Sincerely,
C. Robert Stroud, Jr.
Coastal Field Representative
CRS/tlh
cc: Jim Herstine, DCM
Ernie Jahnke, COE
Floyd Stewart, LPO Surf City
127 Cardinal Drive Extension • Wilmington, North Carolina 28405-3845 • Telephone (919) 395-3900 • Fax (919) 250-2004
An Equal Opportunity Affirmative Action Employer