HomeMy WebLinkAbout7908_NEWMAN, HOWARD L._19910408F
r 1 �
PROJECT DESCRIPTION I SKETCH
Pier (dock) length
Groin length
number
Bulkhead length
(SCALE:
r-
aele
i'
ax. distance offshore --�
• Basin, channel dimensions
.01 4
Other-.x
P;D/
This permit is subject to compliance with this application, site
drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine, ��"` '/'
imprisonment or civil action; and may cause the permit to be-
come applicant's signature
null and void.
This permit must be on the project site and accessible 'to the
permit officer when the project is inspected for compliance.
The applicant certifies by signing this permit that 1) this pro -
is consistent with the local land use plan and all local
finances, and 2) a written statement has been obtained from
adjacent riparian landowners certifying that they have no
objections to the proposed work.
In issuing this permit the State of North Carolina certifies that
this project is consistent with the North Carolina Coastal
Management Program.
permit officer' signature
issuing date exp,iration d to
r,
attachments �� � Jet %f l`Z{
application fee- f
T. 0. EURE CONSTRUCTION CO., INC.
POST OFFICE BOX 650
MOREHEAD CITY. NORTH CAROLINA 28557
PHONE 919-728-4191
`A)
.z,
71-
�l
'ILI
I
1 L
w
7FA-$
1?0 3 i AVSV Al
SWALE 1
2)
CAAA1,vEL
Sc_ 4 i
NoWA2Z-> Alp-u)MA N
'724 ;2,;:-,3S
N
I
5
�133b�
N
"O
7p
0
to
doom
s-
N osiv��p� 1
1
T
l�{
L
s•••W ANN'W 'MP r
;WcnwjL%fw) I SV4*�t"T
4,
a/J c s k'/ • 9q v /�J� hi •s
eo-an /, s7of.�f &:� ;7'
e a/ oaf
/Ty! � /C��.Qiti//� e � D •lJ /�%i�
3/26/91
TO WHOM IT MAY CONCERN:
T.D. EURE HAS PERMISSION TO PUT
CHANNEL OUT TO THE INTRACOASTAL
ARE TO PUT THE SPOILS IN A AREA
STARTED.
THE SPOILS DREDGED FROM THE BARNESFIELD
WAY ON MY CORNER LOT IN BARNESFIELD. THEY
THAT WILL BE DISCUSSED WHEN THE JOB IS