Loading...
HomeMy WebLinkAbout7908_NEWMAN, HOWARD L._19910408F r 1 � PROJECT DESCRIPTION I SKETCH Pier (dock) length Groin length number Bulkhead length (SCALE: r- aele i' ax. distance offshore --� • Basin, channel dimensions .01 4 Other-.x P;D/ This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, ��"` '/' imprisonment or civil action; and may cause the permit to be- come applicant's signature null and void. This permit must be on the project site and accessible 'to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro - is consistent with the local land use plan and all local finances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal Management Program. permit officer' signature issuing date exp,iration d to r, attachments �� � Jet %f l`Z{ application fee- f T. 0. EURE CONSTRUCTION CO., INC. POST OFFICE BOX 650 MOREHEAD CITY. NORTH CAROLINA 28557 PHONE 919-728-4191 `A) .z, 71- �l 'ILI I 1 L w 7FA-$ 1?0 3 i AVSV Al SWALE 1 2) CAAA1,vEL Sc_ 4 i NoWA2Z-> Alp-u)MA N '724 ;2,;:-,3S N I 5 �133b� N "O 7p 0 to doom s- N osiv��p� 1 1 T l�{ L s•••W ANN'W 'MP r ;WcnwjL%fw) I SV4*�t"T 4, a/J c s k'/ • 9q v /�J� hi •s eo-an /, s7of.�f &:� ;7' e a/ oaf /Ty! � /C��.Qiti//� e � D •lJ /�%i� 3/26/91 TO WHOM IT MAY CONCERN: T.D. EURE HAS PERMISSION TO PUT CHANNEL OUT TO THE INTRACOASTAL ARE TO PUT THE SPOILS IN A AREA STARTED. THE SPOILS DREDGED FROM THE BARNESFIELD WAY ON MY CORNER LOT IN BARNESFIELD. THEY THAT WILL BE DISCUSSED WHEN THE JOB IS