Loading...
HomeMy WebLinkAbout20553_NC DOT_19981016r Applicant Name AddressF—_ T City c' c CAMA AND DREDGE AND FILL GENERAL N % 12 n or53 _� PERMIT NOV 10 1998 as authorized by the State of North Carolina Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC -I" �Yoj Nc-er.�rj Project Location (C ounty, State Road, Water Body, etc.) State Phone Number EA5 D - 1416t - zip Type of Project Activity ��c- �.� —t her_. �� ..ao �ti� S ��,, 1,�` (�C� c_ �,�.�,., , \ PROJECT DESCRIPTION SKETCH Pier (dock) length Groin length number Bulkhead length max. distance offshore Basin, channel dimensions cubic yards Boat ramp dimensions Other :.: :;c LK This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to be- come null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. (SCALE: NQN L ��) '�Lr\-S applicant's signature perm issuing date expiration date attachments l t i a-� DV In issuing this permit the State of North Carolina certifies that y W n(, "1�5 this project is consistent with the North Carolina Coastal application fee •J Management Program. Form DCM-MR5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. 1. BRIDGES N/A a. Public Private b. Type of bridge (construction material) c. Water body to be crossed by bridge d. Water depth at the proposed crossing at MLW or NWL e. Will proposed bridge replace an existing bridge? Yes No If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) f. Will proposed bridge replace an existing culvert(s)? Yes No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) g. Length of proposed bridge h. Width of proposed bridge i. Height of proposed bridge above wetlands j. Will the proposed bridge affect existing water flow? Yes No If yes, explain k. Navigation clearance underneath proposed bridge 1. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? Yes No If yes, explain m. Will the proposed bridge cross wetlands containing no navigable waters? Yes No If yes, explain n. Have you contacted the U.S. Coast Guard concerning their approval? Yes No If yes, please provide record of their action. Revised 03/95 Form DCM-MP-5 2. CULVERTS a. Water body in which culvert is to be placed Unnamed canal trib to Long Creek b. Number of culverts proposed two c. Type of culvert (construction material, style) corrugated aluminum pipe arch d. Will proposed culvert replace an existing bridge? Yes X No If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) e. Will proposed culvert replace an existing culvert? X Yes No If yes, (1) Length of existing culvert 60 feet (2) Width of existing culvert 54" (3) Height of the top of the existing culvert above the MHW or NWL +/- 2 feet (4) Will all, or a part of, the existing culvert be removed? (Explain) Existing pipes are corroded; all will be removed f 1M Length of proposed culvert 60 feet Width of proposed culvert 87 inches h. Height of the top of the proposed culvert above the MHW or NWL +/- 1.5 feet i. Will the proposed culvert affect existing water flow? X Yes No If yes, explain Due to larger conveyance, water exchange should be more efficient j. Will the proposed culvert affect existing navigation potential? Yes X No If yes, explain 3. EXCAVATION AND FILL a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? X Yes No If yes, (1) Length of area to be excavated + /- 60 feet (2) Width of area to be excavated +/- 22 feet (3) Depth of area to be excavated + /- 2.5 feet (4) Amount of material to be excavated in cubic yards + /-125 cubic yards b. Will the placement of the proposed bridge or culvert require any excavation within: No _ Coastal Wetlands _ SAVs _ Other Wetlands If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Amount of material to be excavated in cubic yards c. Will the placement of the proposed bridge or culvert require any highground excavation? X Yes No If yes, (1) Length of area to be excavated 40 feet (2) Width of area to be excavated +/- 22 ft (3) Amount of material to be excavated in cubic yards + /-115 cubic yards d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area on site for backfM and DOT yard at Swan Quarter (2) Dimensions of spoil disposal area + /-1 acre (3) Do you claim title to the disposal area? X Yes No If no, attach a letter granting permission from the owner. Revised 03/95 Form DCM-MP-5 b. Will the proposed project require the relocation of (4) Will the disposal area be available for future any existing utility lines? Yes X No maintenance? X Yes No If yes, explain in detail (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes X No If yes, give dimensions if different from (2) c. Will the proposed project require the construction of above. any temporary detour structures? (6) Does the disposal area include any area below Yes X No the MHW or NWL? Yes X No If yes, explain in detail If yes, give dimension if different from No. 2 above. e. Will the placement of the proposed bridge or culvert d. Will the proposed project require any work result in any fill (other than excavated material channels? Yes X No described in Item d. above) to be placed below If yes, complete Form DCM-MP-2 MHW or NWL? X Yes No If yes, e. How will excavated or fill material be kept on site (1) Length of area to be filled +/- 60 feet and erosion controlled? Application of (2) Width of area to be filled +/- 22 feet NCDOT's BMP's (3) Purpose of fill bedding for new pipe arches f. Will the placement of the proposed bridge or culvert f. What type of construction equipment will be used result in any fill (other than excavated material (for example, dragline, backhoe or hydraulic described in Item d. above) to be placed within: dredge)? Excavator, trucks, tamps _ Coastal Wetlands _ SAVs _ Other Wetlands If yes, No (1) Length of area to be filled (2) Width of area to be filled g. Will wetlands be crossed in transporting equipment (3) Purpose of fill to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? X Yes No h. Will the placement of the proposed bridge or culvert If yes, require any shoreline stabilization? (1) Length of area to be filled 40 feet X Yes No (2) Width of area to be filled +/- 22 feet If yes, explain in detail granite rip rap will be (3) Purpose of fill to replace unusable used along fill slope at pipe ends excavate 4. GENERAL a. Will the proposed project involve any mitigation? Yes X No If yes, explain in detail M. Randall Turner Division Environmental Off. Applican r WoJect Nawe I (4iyylzzz��� Signature October 16, 1998 Date Revised 03/95 R E NORTH CAROLINA DEPARTMENT OF TRAI NSPORTATIO \_m.'s �pw .a 0 M 7 ^1 p, PLC 9 P!a PROP• �Qos'�� CoN-rf?ol .:STo a P (13p th ex�k) Asa"MtD o' t}.5oo• 8c0 J AWO STn9. sroNE CI{ /Lf�BdPd� Proposec1 .t3K'� NORTH CAROLINA DEPARTMENT OF TRANSPORTATION COUNTY: I4 q 0 E C ° - PROJECT: P'PE iiep�HFrnenr 5R)i'+I DATE: 9 a q SUBJECT: Plan&X-sec SCALE: 2 Noe. SHEET: of 1 ioVERr i M.