HomeMy WebLinkAbout20553_NC DOT_19981016r
Applicant Name
AddressF—_ T
City c' c
CAMA AND DREDGE AND FILL
GENERAL N % 12 n or53 _�
PERMIT NOV 10 1998
as authorized by the State of North Carolina
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15A NCAC -I" �Yoj
Nc-er.�rj
Project Location (C
ounty, State Road, Water Body, etc.)
State
Phone Number EA5 D - 1416t -
zip
Type of Project Activity ��c- �.� —t her_. �� ..ao �ti� S ��,, 1,�` (�C� c_ �,�.�,., , \
PROJECT DESCRIPTION SKETCH
Pier (dock) length
Groin length
number
Bulkhead length
max. distance offshore
Basin, channel dimensions
cubic yards
Boat ramp dimensions
Other :.: :;c LK
This permit is subject to compliance with this application, site
drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine,
imprisonment or civil action; and may cause the permit to be-
come null and void.
This permit must be on the project site and accessible to the
permit officer when the project is inspected for compliance.
The applicant certifies by signing this permit that 1) this pro-
ject is consistent with the local land use plan and all local
ordinances, and 2) a written statement has been obtained from
adjacent riparian landowners certifying that they have no
objections to the proposed work.
(SCALE: NQN L
��) '�Lr\-S
applicant's signature
perm
issuing date expiration date
attachments l t i a-� DV
In issuing this permit the State of North Carolina certifies that y W n(, "1�5
this project is consistent with the North Carolina Coastal application fee •J
Management Program.
Form DCM-MR5
BRIDGES AND
CULVERTS
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-1. Be sure to complete all
other sections of the Joint Application that relate to this
proposed project.
1. BRIDGES N/A
a. Public Private
b. Type of bridge (construction material)
c. Water body to be crossed by bridge
d. Water depth at the proposed crossing at MLW or
NWL
e. Will proposed bridge replace an existing bridge?
Yes No
If yes,
(1) Length of existing bridge
(2) Width of existing bridge
(3) Navigation clearance underneath existing
bridge
(4) Will all, or a part of, the existing bridge be
removed? (Explain)
f. Will proposed bridge replace an existing culvert(s)?
Yes No
If yes,
(1) Length of existing culvert
(2) Width of existing culvert
(3) Height of the top of the existing culvert above
the MHW or NWL
(4) Will all, or a part of, the existing culvert be
removed? (Explain)
g. Length of proposed bridge
h. Width of proposed bridge
i. Height of proposed bridge above wetlands
j. Will the proposed bridge affect existing water flow?
Yes No
If yes, explain
k. Navigation clearance underneath proposed bridge
1. Will the proposed bridge affect navigation by
reducing or increasing the existing navigable
opening? Yes No
If yes, explain
m. Will the proposed bridge cross wetlands containing
no navigable waters? Yes No
If yes, explain
n. Have you contacted the U.S. Coast Guard
concerning their approval?
Yes No
If yes, please provide record of their action.
Revised 03/95
Form DCM-MP-5
2. CULVERTS
a. Water body in which culvert is to be placed
Unnamed canal trib to Long Creek
b. Number of culverts proposed two
c. Type of culvert (construction material, style)
corrugated aluminum pipe arch
d. Will proposed culvert replace an existing bridge?
Yes X No
If yes,
(1) Length of existing bridge
(2) Width of existing bridge
(3) Navigation clearance underneath existing
bridge
(4) Will all, or a part of, the existing bridge be
removed? (Explain)
e. Will proposed culvert replace an existing culvert?
X Yes No
If yes,
(1) Length of existing culvert 60 feet
(2) Width of existing culvert 54"
(3) Height of the top of the existing culvert above
the MHW or NWL +/- 2 feet
(4) Will all, or a part of, the existing culvert be
removed? (Explain) Existing pipes are
corroded; all will be removed
f
1M
Length of proposed culvert 60 feet
Width of proposed culvert 87 inches
h. Height of the top of the proposed culvert above the
MHW or NWL +/- 1.5 feet
i. Will the proposed culvert affect existing water flow?
X Yes No
If yes, explain Due to larger conveyance, water
exchange should be more efficient
j. Will the proposed culvert affect existing navigation
potential? Yes X No
If yes, explain
3. EXCAVATION AND FILL
a. Will the placement of the proposed bridge or culvert
require any excavation below the MHW or NWL?
X
Yes No
If yes,
(1)
Length of area to be excavated + /- 60 feet
(2)
Width of area to be excavated +/- 22 feet
(3)
Depth of area to be excavated + /- 2.5 feet
(4)
Amount of material to be excavated in cubic
yards + /-125 cubic yards
b. Will the placement of the proposed bridge or culvert
require any excavation within: No
_ Coastal Wetlands _ SAVs _ Other Wetlands
If yes,
(1) Length of area to be excavated
(2) Width of area to be excavated
(3) Amount of material to be excavated in cubic
yards
c. Will the placement of the proposed bridge or culvert
require any highground excavation?
X Yes No
If yes,
(1) Length of area to be excavated 40 feet
(2) Width of area to be excavated +/- 22 ft
(3) Amount of material to be excavated in cubic
yards + /-115 cubic yards
d. If the placement of the bridge or culvert involves
any excavation, please complete the following:
(1) Location of the spoil disposal area
on site for backfM and DOT yard at
Swan Quarter
(2) Dimensions of spoil disposal area
+ /-1 acre
(3) Do you claim title to the disposal area?
X Yes No
If no, attach a letter granting permission from
the owner.
Revised 03/95
Form DCM-MP-5
b. Will the proposed project require the relocation of
(4) Will the disposal area be available for future
any existing utility lines? Yes X No
maintenance? X Yes No
If yes, explain in detail
(5) Does the disposal area include any coastal
wetlands (marsh), SAVs, or other wetlands?
Yes X No
If yes, give dimensions if different from (2)
c.
Will the proposed project require the construction of
above.
any temporary detour structures?
(6) Does the disposal area include any area below
Yes X No
the MHW or NWL? Yes X No
If yes, explain in detail
If yes, give dimension if different from No. 2
above.
e. Will the placement of the proposed bridge or culvert
d.
Will the proposed project require any work
result in any fill (other than excavated material
channels? Yes X No
described in Item d. above) to be placed below
If yes, complete Form DCM-MP-2
MHW or NWL? X Yes No
If yes,
e.
How will excavated or fill material be kept on site
(1) Length of area to be filled +/- 60 feet
and erosion controlled? Application of
(2) Width of area to be filled +/- 22 feet
NCDOT's BMP's
(3) Purpose of fill bedding for new pipe arches
f. Will the placement of the proposed bridge or culvert
f.
What type of construction equipment will be used
result in any fill (other than excavated material
(for example, dragline, backhoe or hydraulic
described in Item d. above) to be placed within:
dredge)? Excavator, trucks, tamps
_ Coastal Wetlands _ SAVs _ Other Wetlands
If yes, No
(1) Length of area to be filled
(2) Width of area to be filled
g.
Will wetlands be crossed in transporting equipment
(3) Purpose of fill
to project site? Yes X No
If yes, explain steps that will be taken to lessen
environmental impacts.
g. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed on
highground? X Yes No
h.
Will the placement of the proposed bridge or culvert
If yes,
require any shoreline stabilization?
(1) Length of area to be filled 40 feet
X Yes No
(2) Width of area to be filled +/- 22 feet
If yes, explain in detail granite rip rap will be
(3) Purpose of fill to replace unusable
used along fill slope at pipe ends
excavate
4. GENERAL
a.
Will the proposed project involve any mitigation?
Yes X No
If yes, explain in detail
M. Randall Turner Division Environmental Off.
Applican r WoJect Nawe
I (4iyylzzz���
Signature
October 16, 1998
Date
Revised 03/95
R E NORTH CAROLINA
DEPARTMENT OF TRAI NSPORTATIO
\_m.'s �pw
.a
0
M
7 ^1
p, PLC
9
P!a
PROP• �Qos'�� CoN-rf?ol
.:STo a P (13p th ex�k)
Asa"MtD o'
t}.5oo•
8c0
J
AWO STn9. sroNE CI{ /Lf�BdPd� Proposec1 .t3K'�
NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
COUNTY: I4 q 0 E C ° -
PROJECT: P'PE iiep�HFrnenr 5R)i'+I
DATE: 9 a q
SUBJECT: Plan&X-sec SCALE:
2 Noe.
SHEET: of 1 ioVERr
i
M.