CAMA AND DREDGE AND FILL
GENERAL i�4a 019198-
PERMIT JUN 0 91998
as authorized by the State of North Carolina
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15A NCAC r1� • A
Applicant Name N(- ZU T Phone Number ` LE " `BCD C)
Address n� ''� �-.n a S �4 �•,
City L�,a�.11� �+� State zipt 1e{i`dh
Project Location (County, State Road, Water Bod , etc.)' it ��'� 'jl1� t ` 1Q
Type of Project Activity
PROJECT DESCRIPTION I SKETCH
Pier (dock) length
Groin length
number
Bulkhead length
max. distance offshore
Basin, channel dimensions
cubic yards
Boat ramp dimensions
Other 4'�m 2• �k" 'C
SLR K�\\\wN \-� �,�A\5
This permit is subject to compliance with this application, site
drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine,
imprisonment or civil action; and may cause the permit to be-
come null and void.
This permit must be on the project site and accessible to the
permit officer when the project is inspected for compliance.
The applicant certifies by signing this permit that 1) this pro-
ject is consistent with the local land use plan and all local
ordinances, and 2) a written statement has been obtained from
adjacent riparian landowners certifying that they have no
objections to the proposed work.
C+s SIC V. A t
(SCALE: NON )& )
applicant's signature
permit officer's signature
Nrlc� & to
issuing date expiration date
attachments _� fk . a � U
In issuing this permit the State of North Carolina certifies that
this project is consistent with the North Carolina Coastal
Management Program.
application fee��
?orm 'DCM-MP-5
BRIDGES AND
CULVERTS
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-1. Be sure to complete all
ether sections of the Joint Application that relate to this
?roposed project.
1. BRIDGES - N/A
3. Public Private
�. Type of bridge (construction material)
Water body to be crossed by bridge
3. Water depth at the proposed crossing at MLW or
NWL
a. Will proposed bridge replace an existing bridge?
Yes No
If yes,
(1) Length of existing bridge
(2) Width of existing bridge
(3) Navigation clearance underneath existing
bridge
(4) Will all, or a part of, the existing bridge be
removed? (Explain)
f. Will proposed bridge replace an existing culvert(s)?
Yes No
If yes,
(1) Length of existing culvert
(2) Width of existing culvert
(3) Height of the top of the existing culvert above
the MHW or IYvVL
(4) Will all, or a part of, the existing culvert be
removed? (Explain)
g. Length of proposed bridge
h. Width of proposed bridge
i. Height of proposed bridge above wetlands
j. Will the proposed bridge affect existing water flow?
Yes No
If yes, explain
k. Navigation clearance underneath proposed bridge
1. Will the proposed bridge affect navigation by
reducing or increasing the existing navigable
opening? Yes No
If yes, explain
m. Will the proposed bridge cross wetlands containing
no navigable waters? Yes No
If yes, explain
n. Have you contacted the U.S. Coast Guard
concerning their approval?
Yes No
If yes, please provide record of their action.
tia
Revised 03/95
Form DCN1-NIP-5
(4) Will the disposal area be available for future
b.
Will the proposed project require the relocation of
maintenance? X Yes No
any existing utility lines? Yes X No
(5) Does the disposal area include any coastal
If yes, explain in detail
wetlands (marsh), SAVs, or other wetlands?
Yes X No
If yes, give dimensions if different from (2)
above. a
c..
Will the proposed project require the construction of
(6) Does the disposal area include any area below
any temporary detour structures?
the MHW or NWL? Yes X No
Yes X No
If yes, give dimension if different from No. 2
If yes, explain in detail
above.
Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
d.
Will the proposed project require any work
described in Item d. above) to be placed below
channels? Yes X No
MHW or NWL? X Yes No
If yes, complete Form DCM-MP-2
If yes,
(11 Length of area to be filled 70 '
_ e.
How will excavated or fill material be kept on site
(2) Width of area to be filled 7-9'
and erosion controlled? Annl; cation of hPGr
(3) Purpose of fill bedding/back fill
management practices.
for culvert
Will the placement of the proposed bridge or culvert
f.
What type of construction equipment will be used
result in any fill (other than excavated material
(for example, dragline, backhoe or hydraulic
described in Item d. above) to be placed within: No
dredge)? Dragline, backhoe, trucks
_ Coastal Wetlands _ SAVs _ Other Wetlands
If yes,
(1) Length of area to be filled
(2) Width of area to be filled
g.
Will wetlands be crossed in transporting equipment
X
(3) Purpose of fill
to project site? Yes No
If yes, explain steps that will be taken to lessen
environmental impacts.
;. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed on
highground? Yes X No
h.
Will the placement of the proposed bridge or culvert
If yes,
require any shoreline stabilization?
(1) Length of area to be filled
X Yes No
(2) Width of area to be filled
If yes, explain in detail Class "R" Marl e
(3) Purpose of fill
To be placed on roadway -slopes only.
4. GENERAL
a. Will the proposed project involve any mitigation?
Yes X No
If yes, explain in detail
H. Keith Harrison. Trans.Tech. V
Applicant or Project Name
Signature
5-/6/�F
Date
Revised 03195
sm-rp- -0-I
�Mbb�.yfr
MAY If,
yl
QRoPps�G�Sq"LRPR��LF
�' I y arn�► PaROK 6Err5
f1wRoKl+ I IJ E. • �7$O6
y-
,,I� Ta tit 3 3— —
MRRY C�t9,
0
1J
5 6-60111
ti -1L
ya aear �F n�' grtas
o PI
Rso
fmo n}
�ta5oo.
f_
Q wSFc.� 496.E
I �SYpBI L1iHT1od _ _
• 6TONf �` d�A E1.49i•9
Z MvE0.T=491.1 EL•: 490.9
.A.
_ A N P .^
17n lza
it 129
�' 178 'n� J.6
Mebcp. C o
.J 246 Ch—h of Chrw y�
97 q
54
R 1739
3U6 j ✓— �r
F322
Pawl v
;F32i
127
133
Izt5
Jo,du^ 1
J C--y Pawl
Saffer(yife.I `\`
17 6
j \
Wad- Pit
voo � i
`� Pondio9 B�od1
\\ 1.9 1730 � r
Wad. Pt.
lam '-���• : O
7
f
•