Loading...
HomeMy WebLinkAbout19196_NC DOT_19980506�-.-�-.¢.-�f�-•---m-- O CAMA AND DREDGE AND FILL GENERAL f)19196 _ i- PERMIT JUN 0 9 1998 701 as authorized by the State of North Carolina Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC �)� • Q 10 ,-) Applicant Name 1V m Phone Number Address J 5 j `ate �• :, `� (Z C�, c� l City State— Zip A) 1 Project Location (County, Ste Road, Water Body, etc.)' l� Type of Project Activity.: PROJECT DESCRIPTION I SKETCH Pier (dock) length (SCALE: N(JN% ) Groin length number Bulkhead length max. distance offshore IS Basin, channel dimensions �A 1"1 Rpm `L ,9 Cl"e cubic yards Boat ramp dimensions OtherTs� This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to be- come null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. applicant's signature r� permit officer's signature issuing date expiration date attachments d Yl • o In issuing this permit the State of North Carolina certifies that ,�v_ , i� this project is consistent with the North Carolina Coastal application fee 5 `-^ a(0 (kUa� Management Program. S ?orm'DCM-MP-5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all ether sections of the Joint Application that relate to this ?roposed project. 1. BRIDGES - N/A a. Public Private b. Type of bridge (construction material) z. Water body to be crossed by bridge J. Water depth at the proposed crossing at MLW or NWL e. Will proposed bridge replace an existing bridge? Yes No If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath. existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) f. Will proposed bridge replace an existing culvert(s)? Yes No if yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or IYvVL (4) Will all, or a part of, the existing culvert be removed? (Explain) g. Length of proposed bridge h. Width of proposed bridge i. Height of proposed bridge above wetlands j. Will the proposed bridge affect existing water flow? Yes No If yes, explain k. Navigation clearance underneath proposed bridge 1. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? Yes No If yes, explain m. Will the proposed bridge cross wetlands containing no navigable waters? Yes No If yes, explain n. Have you contacted the U.S. Coast Guard concerning their approval? Yes No If yes, please provide record of their action. 161. Revised 03195 orm DCNI-Y-P-5 (4) Will the disposal area be available for future maintenance? __X__ Yes — (5) Does the disposal AVs loclother wetlandany s? wetlands (marsh), S Yes X No If yes, give dimensions if different from (2) above. (6) Does the disposal area include any area below the MHW or NWL? __- Yes No If yes, give dimension if different from No. 2 above. Will the placement of the proposed bridge or culvert result in any fill (other than excavated below erial described in Item d. above) to be placed No MEW or NWL? X — Yes If ; es, (1) Length of area to be filled 60� -- (7_) Width of area to b fine back l for (3) Purpose of fill Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: Coastal Wetlands SAVs _ Other Wetlands If yes, (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill _-_-__—_ Will the placement of the proposed bridge or culvert result in any fill (other than excavated mate rial described in Item d. above tobee placed 1 ato highground? Yes If yes, Length of area to be filled (2) Width of area to be filled (3) Purpose of fill 4. GENERAL a. Will the proposed project involve any mitigation? Yes X No If yes, explain in detail b. Will the proposed project require the relocation of any existing utility lines? Yes — X No If yes, explain in detail c., Will the proposed projed require the construction of any temporary detour structures? yes _IL— No If yes, explain in detail d. Will the proposed project require any work channels? Yes __�L_ No If yes, complete Form DCM-MP-2 e. How will excavated or fill material be kept on site and erosion controlled? Application of st management ractices. — f. What type of construction equipment will be used (for example, dragline, bac'rhoe or hydraulic dredge)? Dra line backhoe trucks g. Will wetlands be crossed in transporting equipment to project site? Yes v No If yes, explain steps that will be taken to lessen environmental impacts. h. will the placement of the proposed bridge or culvert require any shoreline stabilization? Yes _ No If es, explain in detail Class "B" Marle ' be placed on m ��T C� �=� H. Keith Harrison, TT V Applkant or Project Name Signature Date Revised 03195 S I-rs +:�3 � '•� 1 ExyK'a l�40�'F �yo $`moo `�•, f.q qDV Lip COD 14 vo r i I 1 rJt- 33 — — — — — L 5219JZ 3.� m;.-ro 5R19o1 I 1 I I I I I I I I i �R Go. 1 1 1 S• O 1 a r P� A55'"�6�.Svo /Tn-rs7-7 7 rr—n7• WS EL: �9s8 is �A�• pca Et-.-490.8 5(,we . — EL:48g.8 T+JVERr EL W EYrRHpEwSfP C.D. 8"Ghkk K. Lowey N EW 6E90l, N.(. Z $ 56o ).] Jlii — z 129 178 Syr tea,. C� J 246 0-th of ow;.; y R ✓� 7 A 92 O 54 .A 1739 F322 Porn R 1 `� v 1(� ,F321 7,7 ' `A , I . , r= 6 Jordan � 1764 127 z •� 'P \ i,Jl ,, Grvvy Porn •\. s � 1 /7 d S v C�Jj Saller}h�ile r_ i Wad.. Pond io P0.1k Wad. PI. •