Loading...
HomeMy WebLinkAbout19194_NC DOT_19980506O CAMA AND DREDGE AND FILL GENERAL 19194- Q PERMIT JUN 0 9 1998 9 as authorized by the State of North Carolina Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC Applicant Name `- Phone Number Address r t ('­5' City v% C- ��. � ��v.m State +. Zip Project Location (County, State Road, Water Body, etc.) Type of Project Activity 0 5 k ;� Al " PROJECT DESCRIPTION Pier (dock) length Groin length number Bulkhead length max. distance offshore Basin, channel dimensions cubic yards Boat ramp dimensions Other E' SKETCH (SCALE: NQNk. This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to be- come null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. �►.J � \ w._ � ,_i r�� �` \ice ��1� �� -•-`�- �- ;ram, � ��-�.. applicant's signature permit officer's signature issuing date expiration date attachments } �$ V In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal application fee Management Program. oriri 'DCM-MP-5 BRIDGES AND CULVERTS Attach this form to Jokt Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. 1. BRIDGES - N/A a. Public Private b. Type of bridge (construction material) c. Water body to be crossed by bridge (4) Will all, or a part of, the existing culvert bP removed? (Explain) g. Length of proposed bridge h. Width of proposed bridge i. I-Ieight of proposed bridge above wetlands j. Will the proposed bridge affect existing water flow? Yes No If yes, explain d. Water depth at the proposed crossing at MLW or k. Navigation clearance underneath proposed bridge NWL e. Will proposed bridge replace an existing bridge? Yes No If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) f. Will proposed bridge replace an existing culvert(s)? Yes No 1. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? Yes No If yes, explain m. Will the proposed bridge cross wetlands containing no navigable waters? Yes No If yes, explain If yes, (1) Length of existing culvert n (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or N-vVL Have you contacted the U.S. Coast Guard concerning their approval? Yes No If yes, please provide record of their action. Revised 03195 corm T?Ch1-h'_P-5 (4) Will the disposal area be available for future maintenance? X Yes No (S) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes X No If yes, give dimensions if different from (2) above. A (6) Does the disposal area include any area below the MHW or NWL? Yes X No If yes, give dimension if different from No. 2 above. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed below MHW or NWL? X Yes No If yes, 60' (1) Length c area to be filled 9_12' (2) Width of area to be filled din backfill for (3) Purpose of fill g culvert. f. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: _ Coastal Wetlands — SAVs ^ Other Wetlands If yes, 1A 0 (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? Yes X No If yes, t� (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill 4. GENERAL a. Will the proposed project involve any mitigation? Yes X No If yes, explain in detail b. Will the proposed project require the relocation of any existing utility lines? Yes X No If yes, explain in detail c.. Will the proposed project require the construction of any temporary detour structures? Yes X No If yes, explain in detail d. Will the proposed project require any work channels? Yes X No If yes, complete Form DCM-MP-2 e. How will excavated or fill material be kept on site and erosion controlled? Application of best management practices What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? Backhoe g. Will wetlands be crossed in transporting equipment to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? X Yes No If yes, explain in detail glass "B" Marle To be placed on roadway slopes only• — H. Keith Harrison TT V Applicant or Project Name Signature Date Revised 03195 s ► -rE li- 5 IN- 1 A TJ+� L i,4Q,e��,� r, ►+Yaes r� (-►,et of EANA Peelc \'0 r ,L 14 S /✓l o oRr- f %Aoof } i kf.t . AuKozg, Nt. a -7 Sa6 LY, n1(-33 ME I W;I):aM m%1VO , rJ < PA � oo.o yw�^ 1 (3F_D EL.:! �909 Ito EYEKT EL.54.9 17A3 JZU ki 178 3.6 12-9 LL" & to. C. 246 O—h of ,2 54 A 1739 um F322 Pw :r v F 321 127 V 1732 17 .5 17 I Z 155 / IV o O'd. ° �� ( ( / L6 1764 1723 G-ay Pow 1 6 .6 W.d- Porn27 17 .11 no CM6M BOCKh 1.0 1730, � .d. Pl.