Loading...
HomeMy WebLinkAbout19166_NC DOT_19980514.fi; ",^ , �..-'."a fi-`_ S' 3q a �� :�.T ...�."m--_"'.>a °rr"—,�^�r•__„"'."=JcV, n O CAMA AND DREDGE AND FILL GENERAL ,` JUN 0 9 1998 k�1 166 ~4b PERMIT IV as authorized by the State of North Carolina Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC Applicant Name �y �,��erZc.r , Phone Number Address 1p t Ulu-, <� 1 City c -. State Zip Project Location (County, State Road, Water Body, etc.);g1' Type of Project Activity Y �� V, V-t s ' ll tt s . ; C �LlL art " a !w, PROJECT DESCRIPTION I SKETCH Pier (dock) length Groin length number Bulkhead length max. distance offshore Basin, channel dimensions cubic yards Boat ramp dimensions — Other This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to be- come null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. (SCALE: j& VN L ) 1 1 applicant's signature attachments permit officer's signature issuing date expiration date In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal application fee Management Program. Form DCM-MP-5 BRIDGES AND CULVERTS _attach this form to Joint application for C:��'L4 'vlaior permit, Form DC'\2--\ -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. 1. BRIDGES \/A a. Public Private b. Type of bridge (construction material) Water bode to be crossed by bridge d. : ater depth at *.he proposed crossing ator NWL e. \Z"ill proposed bridge replace an existlrig bridge'' Yes \o If yes, (I) Length of existing bridge (') lVidth of existing bridge (3) Navigation clearance underneath existing bridge (;) will all, or a part of the existing bridge be removed? (Explain) f. Will proposed bridge replace an existing culverts)? Yes -N.0 If ves, (1) Length of existing culvert (3) Width of existing culvert (3) Height of the top of the existing culvert above the -NR-1W or NkVI i;4) Will all. or a part of, the existing culvert be removed? tT-xplain) g. Length of proposed bridge h. IVIdth of proposed bridge i. Height of proposed bridge above wetlands j. Will the proposed bridge affect existing-,vater flow' Yes \o If yes, explain k. \avigation clearance underneath proposed bridge 1. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? Yes \o If yes, explain m. Will the proposed bridge cross wetlands containing no navigable waters? Yes '\o If yes, explain n. Have you contacted the U.S. Coast Guard coneeming their approval'? Yes \o If Ives, please provide record of their action. Form DC-'%I--\IP 2. CULVERTS a. Water body in which culvert is to be placed Unnamed canal D. 'cumber of culverts proposed c. Type of culvert (construction material, style) corrugated aluminum p)rnes IN -ill proposed culvert replace an existing brit Yes Z No if ves. (1) Length of e�zlsting bridge (2) Width of existing bridge ;3) 'Navigation clearance underneath existing bride v i '4) lx ill all_ or a part of, the existing bridge be removed':' (xplain) Will proposed culvert replace an existing culvert? Yes \To If ves. i'D Length of exrstme culvert 2 ,a 0' (2) Width of existing culvert 2 —aa 367- (3) Height of the top of the existing culvert above the '-N-21IV or NMI (4) Will all, or a part of: the existing culvert be removed'.' .E-.plain) all of both existine Mines will be removed f. Length of proposed culvert 2 ;'a 60' g. )Width of proposed culvert 2 ,'a.. 36" h. Height of the top of the proposed culvert above the or NIA1 0.6 feet below '• AVL i. X-'ilI the proposed culvert affect existing water flow? Yes X No If yes, explain j. \ ill the proposed culvert affect existing navigatio, potential? Yes :; No If ves. explain 3. EXCAVATION' AND FILL a. IN"ill the placement of the proposed bridge or culvert require any excavation below the N!UBN' or NIN11 1 Yes :tio If V. (1) Length of area to be excavated 60' (2) Width of area to be excavated I O'fincl. nines I (3) Depth of area to be excavated (—'-) 4-5' (4) amount of mat;rial to be excavated in cubic vards < 20. excluding volume of nit)es b. R'ill the placement of the proposed bridge or culvert require any excavation within: NO _ Coastal Wetlands _ S it's _ Other Wetlands If ves. (1) Length of area to be excavated (2) Width of area to be excavated (3) amount of material to be excavated in cubic vards c. Will the placement of the proposed bridge or culvert require any highground excavation? 1 Yes No If ves. (1) Length of area to be excavated 60' +;2) Width of area to be excavated I Vexcl. pipes} (3) amount of material to be excavated in cubic vards < 10 d. If the placement of the bridge or culvert involves an% excavation, please complete the following: (1) Location of the spoil disposal area * on -site fill (excl. muck) for expanded radii (2) Dimensions of spoil disposal area "See below (3) Do you claim title to the disposal area? 1 Yes 'NTo If no, attach a letter granting permission from the owner. "Small volume of muck & waste to be trucked to DOT yard on SR 1100 or "Little Florida Road" site Form DCI-\LP-_: (4) Will the disposal area be available for future maintenance? 1 Yes No Does the disposal area include any coastal wetlands (marsh), S Vs, or other wetlands? Yes X 1_'_o If ves, Give dimensions if different from (_) above. (6) Does the disposal area include any area below the 1.1h"A' orYes 1 No If }.es, give dimension if different from No. above. e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described Lz Item d. above) to be placed below � TSS W orN-'%VL? X Yes No I Yes, i1) Length of area to be tilled 60' IV-dth of area to be tilled 10' (3) Purpose of till Backtill of new culverts ?. GTi'ill the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: -NO Coastal Wetlands S Vs Other Wetlands — (I) Length of area to be f111_ed t'?) \V idth of area to be filled (�) Purpose of fill g. \Vill the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? 1 Yes No If ves, 60' pipe back -fill & (i ) Length of area to be filled 125' (x 2) lVidth of area to be filled I T (pipes) & �;-10' (3) Purpose of till backfill pipes & widen shoulders for increase in turning radii 4. GENERAL a. Will the proposed project involve any mitigation? Yes Y No If ves, explain in detail b Will the proposed project require the relocation of any ex1stM2 utility lines? 1"es si '�o If yes_ explain in detail c. Will the proposed project require the construction of any temporan- detour structures? Yes X No If ves, explain in detail d. tVill the proposed project require any work channels? Yes X No If yes, complete Form DCM-_LP-? e. How will excavated or fill material be kept on site and erosion controlled? Implementation of Best 'Management Practices for the Protection of Surface Waters in N.C. f. What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? Backhoe. dump trucks g. Will wetlands be crossed in transporting equipment to project site? Yes X No If i-es, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? Y Yes \o If yes, explain in detail Granite riprgp will be used to stabilize fill slopes at pipe outlets H. Franklin Vick_ P.E. App' o ct Name Q tore s %7 Date &/U BAr A U12 ro J!r' i ^ice: J y ,� 221 S 'N 1214 Ki1229 l- H" r 1237 '202, .. 12( COLUMBtA 1222 PPE NONG r229 — 1221 u W4 ej IMG SAVANNM .0 M12 r oa A, S! w - , . "' --i-11 - 0 .1 SCUPPERNONG 13.3 1116 M— N i: 40 NORTH CAROLINA DEI)AWMENT OF TRANSPORTATION DTVISION OF TITGT-IAVAYS COUNTY: TYRRELL 1'lt0.11i,CT:PRO13OSED TWERSEGUON TM[-'ROVB4Nr OF NC 94 AND SR 1301 nib 11 22 I)ATE: JANUARY 6, 1997 Vicinity Map SCALE: NTS i T 1,Me- [- Co. \ J)s /G 9 \. I P 115 , Q SEAT°I Ir C,�pb 1 c P S/ Bu lL p o B l Age C pA. Z�yl;�� vM ,�'�/50lt otL 0 PRO p osf D Tom 7' iR•n % �10 TERA WeArNE--l- y \� Dt3 /G/ P 3// o fE/k-phmr� frjFsffcs �x1.3r„146 rac o- pvwFa potr ANCI,OR �-uP pcAv - - CA 4AL =7- S ' .$ N04L.4>ER - - - - Ex'srm& I've Peoras6o roE LI SAM UTNRlE 0 f) P Zoo i L or N — k ,$ ei/o S — —r — — I 15' 15 / C N ,' A4— PIP'i< CANAL b P.Po�osEc� ``,� E-� Tv,E, 7 p I\ ANC f�ErY,/f'it//LL�,oM pt/EllTi�cr�eL y `� o 8 J EX'srin/G Toe ¢. • f�� E. � 1` �I NORT[1 CAROLINA lo' io' � I)1:1';1RT'N'III;N'I' Ole '1'RANSI'ORTATION I DIVISION Or 1-11GIMAYS I COUNTY: 'IMWIL, I 1'120'll'C 1 PROPOSED 1NCCRSEMON TMPROVINLNI' OF NC 94 AND SR 1301 ISUBJECT: PhIll View SCALE: 811 ET: 2 0P 5- i" = 50' to 7s 0.0 L• 8 '° 7.Zo 14 io //Zz SEc7iw+/y FiL Jia✓ ExIST/.vL P�✓nY \ / C V 0 v P.eo�os O ,�'X�� r,•�¢ r�� r•� 0 NORTH CAROUNA Ole TRANSPORTATION DWISTON OF TTTGIMAYS COUNTY: '1YRRELL I' UM ECT: PROPOSED TWERS@CHON TMPROV[MINC O NC 94 AND SR 1301 I)ATE: JANIIARY 61997 51111.111;UT: \-seclioin View SCAT I!": SI11?I:I': 3 Uf 5 1" = 10' IIORZ. -1 III = 5' VrRr. iD NP ,a 0�0 of,Z) NE se-i3o� oN We 94 S �xAS TtvO 40 -3G � So bo E 0 0 10 q,#Z >? f NW s1p,5 s� r3o1 oN N.C. 9¢ p ID 7,5 Z •0 S 4- ___,SO— NORTH CAROLINA~ 20 3b 1)IPPARTMENT Ole TRANSPORTATION DIVISION Ole T-TTCHAVAYS COUNTY: INTY: IYRRI:LIB 1'110.11":C.T: NRO['QSGD TN'I'f:RSGcricfl TM[ ROVDIWr OF NC 94 AND SR 1301 I)ATR•: jANUARy 6 1997 51111.II:C'1': 1-Seclion View SCALE. SI II:1?'I': •f Uf s ]." 10' 1IORZ. 1" - 5Vfsf7f. !0 7.58 0,0 739 3 /0 iz 71Z 6.8 �QiP-PAP X1srip PA z ,s 5 7-Wo !ad'- AuiM P�P� IV-EW P//"E• / Z.04) L/e% Z•Bo Z• So Mr GeAPC c z,8o O 3o ZD /6 D lD ZD 3D i3 7 s 10 7Z 6� 6,4 t�/�- �Y�snn1G PAr / 647 lJ . t_ o, � �•48 Zb z99 NOR'1'ii CA120LfNA~J�r �`_.... 1) El"ARTM1 NT Ole TRANSPORTATION DIVISION OF HIGUAVAYS 2,4COUNTY: 'IYRRE'U ITO>.TI';('T: PROP061.D TWERSf:CUN TMPROVT_T1INf Or NC 94 AND SR 1301 DATE: AN11ARY fi 1997 Zd sIIll.11;('f: X-Seclicm View SCALD;: SIII;I;"I: 10' IIOR7.. i 1." 5' VI?.IZI'.