HomeMy WebLinkAbout19053_NC DOT_19980824O
CAMA AND DREDGE AND FILL
GENERAL l $ 9053_ a
PERMIT OCT � � �9°84%19
as authorized by the State of North Carolina
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15A NCAC - ?SC) 0
Applicant.,(Vame ` _� `� ` - Phone Number l"x ;; _ tlVi-
Address
City ) �r C�c • StateZip -A')
cr
Project Location (County, State Road, Water —.i
Body, etc.) i QV
I
�{il-V.,'\. � �a C\ `.t 4Y'•i
4 I,
.�y v`' `•� 1, �4 � � #,, tj. , , •.. a:.tiw.i� �'.'' `� a��'+p chla t c..
Type of Project Activity
Z
PROJECT DESCRIPTION SKETCH
Pier (dock) length
Groin length
number
Bulkhead length
max. distance offshore
Basin, channel dimensions
cubic yards
Boat ramp dimensions
Other _ae�tilltica� C4�`aa
7!!5QR -"z� tk4 Nw,\\- \CA-t
This permit is subject to compliance with this application, site
drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine,
imprisonment or civil action; and may cause the permit to be-
come null and void.
This permit must be on the project site and accessible to the
permit officer when the project is inspected for compliance.
The applicant certifies by signing this permit that 1) this pro-
ject is consistent with the local land use plan and all local
ordinances, and 2) a written statement has been obtained from
adjacent riparian landowners certifying that they have no
objections to the proposed work.
(SCALE: NQN )
_ � .
applicants
permit otticer-s signature
issuing date expiration date
attachments -W • a �" Q
In issuing this permit the State of North Carolina certifies that q u- ,
this project is consistent with the North Carolina Coastal application fee
Management Program.
Form DCM-MP-5
BRIDGES AND
CULVERTS
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-1. Be sure to complete all
other sections of the Joint Application that relate to this
proposed project.
1. BRIDGES N/A
a. Public Private
b. Type of bridge (construction material)
c. Water body to be crossed by bridge
d. Water depth at the proposed crossing at MLW or
NWL
e. Will proposed bridge replace an existing bridge?
Yes No
If yes,
(1) Length of existing bridge
(2) Width of existing bridge
(3) Navigation clearance underneath existing
bridge
(4) Will all, or a part of, the existing bridge be
removed? (Explain)
f. Will proposed bridge replace an existing culvert(s)?
Yes No
If yes,
(1) Length of existing culvert
(2) Width of existing culvert
(3) Height of the top of the existing culvert above
the MHW or NWL
(4) Will all, or a part of, the existing culvert be
removed? (Explain)
g. Length of proposed bridge
h. Width of proposed bridge
i. Height of proposed bridge above wetlands
j. Will the proposed bridge affect existing water flow?
Yes No
If yes, explain
k. Navigation clearance underneath proposed bridge
1. Will the proposed bridge affect navigation by
reducing or increasing the existing navigable
opening? Yes No
If yes, explain
m. Will the proposed bridge cross wetlands containing
no navigable waters? Yes No
If yes, explain
n. Have you contacted the U.S. Coast Guard
concerning their approval?
Yes No
If yes, please provide record of their action.
2. CULVERTS
a. Water body in which culvert is to be placed
Unnamed canal
b. Number of culverts proposed one
c. Type of culvert (construction material, style)
24" aluminum vine
Revised 03/95
Form DCM-MP-5
f. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed within:
_Coastal Wetlands _ SAVs X Other Wetlands
If yes,
(1) Length of area to be filled +/- 15' (x 2)
(2) Width of area to be filled up to 5'
(3) Purpose of fill to supplement back fill of
slopes at pipe ends; not enough excavate
will be available to complete this work plus
rip rap will be needed
g. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed on
highground? Yes X No
If yes,
(1) Length of area to be filled
(2) Width of area to be filled
(3) Purpose of fill
4. GENERAL
a. Will the proposed project involve any mitigation?
Yes X No
If yes, explain in detail
b. Will the proposed project require the relocation of
any existing utility lines? Yes X No
If yes, explain in detail
c. Will the proposed project require the construction of
any temporary detour structures?
Yes X No
If yes, explain in detail
d. Will the proposed project require any work
channels? Yes X No
If yes, complete Form DCM-MP-2
e. How will excavated or fill material be kept on site
and erosion controlled? Application of the
NCDOT's Best Management Practices for the
Protection of Surface Waters
f. What type of construction equipment will be used
(for example, dragline, backhoe or hydraulic
dredge)? Backhoe, dump truck
g. Will wetlands be crossed in transporting equipment
to project site? Yes X No
If yes, explain steps that will be taken to lessen
environmental impacts.
h. Will the placement of the proposed bridge or culvert
require any shoreline stabilization?
X Yes No
If yes, explain in detail longer pipe and some
erosion at existing pipe ends will require fill;
granite rip rap will be used where fill enters
water
M. Randall Turner, Division Environmental Off.
Applicant
//o/r��p�}/,��gjecc]t�Name/
Signature
August 19, 1998
Date
Revised 03195
S 0 U N 1)
oCAI'(014
IN. G-FIA.A '4,
1.6
212
1 14
12VI 17.5
Wit
G
COIUMSIA
\,\tj
swc; SAYM*(ml
1110.
it It
1 0 i-A
pot
Vl- e,
11(n
1-kil
111r,
'iIICL✓I A
pi..1CNI S
9 L" -r r Z,
Bnrr 2- 94
CvLuMr3IAr
NG Z79zs
60f3(3y P�vN�o�cY
(r7 3 7 71<rT1.0 AVC .
/JO,eF0Ll1- VA 7.3,U2
n
d
O
n
V)
Z
W
ri
�111
NI
I
I N bees Fi 1
ePJA
NAQ2vrJs
7-D Z a
l
rawo r:' i,.)
�r--- �
I J wID71l
14' /11.+IAl v/pr=
i
II j)A`l I D D. vJ Q 16 V 1"
yo Z hl. QUcc ►J Sr
1 E U+-f th orJ , r c 2 19 3 2-
I
NOI TII CAROLINA
I)I+�I'AIZ'CMI;N'I' O1+ 'I'IZANS['O12'1'�i'1'[ON
[)IV[SION Ole I[[(�I WAYS
SfIC� VIA vv���JS
'Tyrrell
SAME)
COI HIV I Y:
Zo�rrl� rn
PROJEC]': Replace 15" Pipe on SR 1230-Owcils Rood
►`l r
�R ►2a9 —
`_xwrlD �n�c= /�nAr,
DATE: Aril 161998
SUB.II?C7: Plan View SCALD:
SI11,1;1: 2 of 3
/0 —
D6N-ola,- �gc6vabo, )