Loading...
HomeMy WebLinkAbout19033_NC DOT_19980708O Applicant Name Address City 4­-�- !� CAMA AND DREDGE AND FILL GENERAL Af19033 _ � PERMIT AUG 11 1998 as authorized by the State of North Carolina Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC Project Location (County, State Road, Water PROJECT DESCRIPTION I SKETCH Pier (dock) length Groin length number Bulkhead length max. distance offshore Basin, channel dimensions cubic yards Boat ramp dimensions Other CyA.. arv-S i This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to be- come null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. Phone Number 6 - 5146 ' 4✓�`- (SCALE: 1\s , ,;,N L � NIQ_ A �',� \ \ S It 1�, UIIt01� ^� applicant's signature '•�� � `� '3 �,.�.i �� Cry. . permit officer's signature issuing date expiration date attachments } Vk • Gr�)Gru In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal Management Program. application fee 44,f(D , , ck 69 Cnf i0i V)001-AQD I I i I I S R Ito 07 I -ro S a 1 c, 0 8 --� � I I I MARK Wp0%ARO — _ _ o� Pir1E � 0A r1, �1 � ??ORD aoyo rr-\ :I1 POAD P�E� un� �t io�CWAI 6R El- SpO.o 1 , NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS COUNTY: Beaufort PROJECT: Replace exist. Pipe on SR1607 DATE: 6/1 /98 SUBJECT: Plan&X-sec SCALE: SHEET: / of 1 V6RT• 1 Ao� BRIDGES AND CULVERTS kttacb this form to Joint Application for CAMA Major b ?ermit, Form DCM-MP-1. Be sure to complete alI )ther sections of the Joint Application that relate to this )roposed project. �. BRGE 3 - IDN/A Public Private Type of bridge (construction material) Water body to be crossed by bridge Water depth at the proposed crossing at MLW or NWL Will proposed bridge replace an existing bridge? Yes No If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) Will proposed bridge replace an existing culvert(s)? Yes No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or IV-'YVL evised 03195 (4) Will all, or a part of, the existing culvert be removed? (Explain) g. Length of proposed bridge h. Width of proposed bridge i. Height of proposed bridge above wetlands j. WiII the proposed bridge affect existing water flow? Yes No 4 If yes, explain k. Navigation clearance underneath proposed bridge I. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? yes No If yes, explain In. Will the proposed bridge cross wetlands containing no navigable waters? Yes No ` If yes, explain n. Have you contacted the U.S. Coast Guard concerning their approval? Yes No If yes, please provide record of their action. corm 111-lYl iti.Y-j (4) Will the disposal area be available for future maintenance? _ X Yes No (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes X No If yes, give dimensions if different from (2) above. (6) Does the disposal area include any area below the MHW or NWL? Yes X No If yes, give dimension if different from No. 2 above. e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed below MHW or NWL? X Yes No If yes, (1) Length of area to be filled 60' (2) Width of area to be filled 12-14' (3) Purpose of fill BEDDING/BACT:FTT T FOR CULVERT Wiii the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: Coastal Wetlands ___- SAVs _ Other Wetlands If yes, NO (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? Yes X No If yes, (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill 4. GENERAL a. Will the proposed project involve any mitigation? Yes X No If yes, explain in detail b. Will the proposed project require the relocation of any existing utility lines? Yes —X,-_ No If yes, explain in detail c.. Will the proposed project require the construction of any temporary detour structures? Yes, X No If yes, explain in detail d. Will the proposed project require any work channels? Yes No If yes, complete Form DCM-MP-2 e. How will excavated or fill material be kept on site and erosion controlled? APPLTCATION OF BEST MANAGING PRACTICES f. What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? CRANE, BACKFILL TRUCKS g. Will wetlands be crossed in transporting equipment to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? Yes X No If yes, explain in detail H.K.HARRISON TRAM_ TFru IT AppBcant or Project Name V, ;e Signature/1y`/ _-7 Date Revised 03/95 6 , W A S H t _ t - < 72 �. IM '-9 b. alap.l`Y 3 J i J 316 16 308 D I S M A L 139 1627 I dZI h 7' 1626 R M---0 Sew — ID Ck 11 `O 11625 Said«I 4921 — 136 "1 1626 241 1613 Id]! n 1619 I. 1621 Kn.9own .+ o .y 1.9 157 22 ,n1. o :� .,uLw6r Y � a Gala _ wJ .abba] �. s iv p P' 156 1627 — 1622 v 1529 );x,: ?L lA 412 Lard b A.. t 150 9� 235 WQI[a Wa /q AnKodl Cl>_FA,110 b ' 21 1619 1616 f1768 IJ76' .6 1527 � ' ' C2 .2 3 6 51 S W A l 107 z9 n —P 155 M p ! � ELS25 1526 160J 1022 1`]6 ISO, 15 177 ' 2.2 1507 1520 1602 io-02 a A W9 ` J � 529 � 1 ~ Z 22 21 1610< 161, ran —�• 29 13A3 160 b 7 b.kwhh Y�aOrvib :f,9 Isu I 1 I'� 7 9 71! + a. P 2 3 it Go.. R—d. .s u Ev.r.M Crouroad. r�l. '� DaupT n � 1 , `6 J.ssama ti 7 a,rnhaa Ch. 1 2 . .� ~ 1762 Ili 17,6 13J. a - _ ,1. 79 t 35 p — �G e N e J 9 4 A (aYc� D 320 .o ;j ~CPi J� 37i '' 1 d2 b 411 2.6 13 i7.1 n 0 92 j; 1.3 � c 1 ,Lii . _ 3.0 Jack - 3J2 Gt°� WM.P ., DAL � r�dr 17.3 uTM ( ?9� ? L7 67roP3o o J A C K S 0 N UP _ � c. c, C•R� ,n2 a 133. P iia JI �' ", ' 1339�94 2b 129 178 2491 1 ., 1-.. 7 Gomaad LAi6a . 7M �1l . M 246 o—.h of aai. -iy 127� 7 A, BLOUNTS // POW 9.7 SAC �rn2 BAY , ti I "� A9 54 LW7 l 6 1739 2 ,n lisp