HomeMy WebLinkAbout18927_NC DOT_19980130O CAMA AND DREDGE AND FILL GENERAL MAR 16 1993 88 2 7 - es PERMIT -0-M as authorized by the State of North Carolina Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC Applicant d1ame J `'- �-� �'i��'ix U� sa.c,�.(�;t`'tza��u�_ Phone Number Address V `) E�11-- City i- State Zip�� Project Location (County, State Road, Water Body, etc.) Type of Project Activity _t L-1Ot s CIl� 12 PROJECT DESCRIPTION SKETCH (SCALE: NQNC ) Pier (dock) length Groin length number Bulkhead length max. distance offshore Basin, channel dimensions \QC'-) cubic yards Boat ramp dimensions Other This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to be- come null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. 12 applicant's signature \;1 1 (_ permit officer's signature issuing date expiration date attachments __TA - 14-Scic In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal Management Program. ('31, application fee % Form DCM-MP-5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. 1. BRIDGES a. -Public X Private b. Type of bridge (construction material) Reinforced concrete c. Water body to be crossed by bridge Conaby Creek d. Water depth at the proposed crossing at MLW or NWL +/- 7 feet (NWL) e. Will proposed bridge replace an existing bridge? X Yes No If yes, (1) Length of existing bridge 40 feet (2) Width of existing bridge +/- 25 feet (3) Navigation clearance underneath existing bridge + /- 2.5 feet vertical (4) Will all, or a part of, the existing bridge be removed? (Explain) Entire bridge to be removed f. Will proposed bridge replace an existing culvert(s)? Yes X No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) g. Length of proposed bridge 90 feet h. Width of proposed bridge 40 feet i. Height of proposed bridge above wetlands + /- 4-5 feet j. Will the proposed bridge affect existing water flow? X Yes No If yes, explain Longer bridge requires 2 internal bents which will cause changes in flow velocities and directions; longer bridge will allow for more floodplain exhange k. Navigation clearance underneath proposed bridge + /- 3.5 feet 1. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? X Yes No If yes, explain new structure will provide + /- 1 ft additional vertical clearance m. Will the proposed bridge cross wetlands containing no navigable waters? Yes X No If yes, explain n. Have you contacted the U.S. Coast Guard concerning their approval? Yes X No If yes, please provide record of their action. RP,.igpd 03/o4 Form DCM-MP-5 2. CULVERTS N/A j. Will the proposed culvert affect existing navigation potential? Yes No If yes, explain a. Water body in which culvert is to be placed b. Number of culverts proposed 3. EXCAVATION AND FILL c. Type of culvert (construction material, style) a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? d. Will proposed culvert replace an existing bridge? Yes X No Yes No If yes, If yes, (1) Length of area to be excavated (1) Length of existing bridge (2) Width of area to be excavated (2) Width of existing bridge (3) Depth of area to be excavated (3) Navigation clearance underneath existing (4) Amount of material to be excavated in cubic bridge yards (4) Will all, or a part of, the existing bridge be removed? (Explain) b. Will the placement of the proposed bridge or culvert require any excavation within: No _ Coastal Wetlands _ SAVs _ Other Wetlands If yes, e. Will proposed culvert replace an existing culvert? (1) Length of area to be excavated Yes No (2) Width of area to be excavated If yes, (3) Amount of material to be excavated in cubic (1) Length of existing culvert yards (2) Width of existing culvert (3) Height of the top of the existing culvert above c. Will the placement of the proposed bridge or culvert the MHW or NWL require any highground excavation? (4) Will all, or a part of, the existing culvert be X Yes No removed? (Explain) If yes, (1) Length of area to be excavated 2X30 feet (2) Width of area to be excavated 25 feet (3) Amount of material to be excavated in cubic f. Length of proposed culvert yards +/- 110 cubic yards g. Width of proposed culvert d. If the placement of the bridge or culvert involves any excavation, please complete the following: h. Height of the top of the proposed culvert above the (1) Location of the spoil disposal area MHW or NWL on site usage (2) Dimensions of spoil disposal area i. Will the proposed culvert affect existing water flow? N/A Yes No (3) Do you claim title to the disposal area? If yes, explain X Yes No If no, attach a letter granting permission from the owner. Revkegi 0310; Form DCM-NW5 e.- (4) Will the disposal area be available for future maintenance? Yes No b. Will the proposed project require the relocation of (5) Does the disposal area include any coastal any existing utility lines? Yes X No wetlands (marsh), SAVs, or other wetlands? If yes, explain in detail Yes X No If yes, give dimensions if different from (2) above. (6) Does the disposal area include any area below c. Will the proposed project require the construction of the MHW or NWL? Yes X No any temporary detour structures? If yes, give dimension if different from No. 2 Yes X No above. If yes, explain in detail Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed below d. Will the proposed project require any work MHW or NWL? Yes X -No channels? Yes X No If yes, If yes, complete Form DCM-MP-2 (1) Length of area to be filled (2) Width of area to be filled e. How will excavated or fill material be kept on site (3) Purpose of fill and erosion controlled? Application of Best Management Practices f. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: _ Coastal Wetlands ` SAVs _ Other Wetlands If yes, No (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? X Yes No If yes, (1) Length of area to be filled 120 feet (2) Width of area to be filled 5-10 feet (3) Purpose of fill backfill of wingwalls 4. GENERAL a. Will the proposed project involve any mitigation? Yes X No If yes, explain in detail f. What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? Crane, backhoe, trucks g. Will wetlands be crossed in transporting equipment to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? Yes X No If yes, explain in detail M. Randall Turner, Division Environ. Officer Applicant or Project Nme Signature January 2, 1998 Date Revised 03195 L B E M A R L n O — . yrwo v s -------------------------------------- z C p U N T Y ftSOX ( mo��-h,N� 279��- � � m9,ey A• flk�us,�'y woods SW 4AP / /f TBM� CD POT STA.IOtOD (Px) sf►�7�'ULcff►7? -� P\P WOODSSWAI / IblAr,# S [l,�lli47773 Po adx 9D 611Isboeo, UU V "a rf9y� Ilk I JL I S P D POT STP.. I l f50 (('iK) 're, s K 13 •" ` �f �. — PO STA.10+39 5 (prS ) __— --- T5 t�L L i , _ VIM _..65: 15 BPS' , o LL - — --_�1-- • NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS COUNTY: WASHINGTON PROJECT: Replace Bridge No. 89 w/ 3 - P.C.S. on S.R. 1325 DATE: Dec. 4, 1997 FILE SCALE: SHEET: 3 of 3 1" =10' VERT. 1" = 50' HORIZ.