Loading...
HomeMy WebLinkAbout18926_NC DOT_19980130..,N xn �",,.''::-ia- - ;,';r, wiz.':;s'!_k..:;x..ev,n'•.._.c,r su' l _w+.`i --- _ _- - ---- ------ u af:a-=s4:m �^?.1 #t`.a�r..!+k_.,, Alf CAMA AND DREDGE AND FILL GENERAL Y 8926 PERMIT as authorized by the State of North Carolina Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC Applicant Name '�-'_f ii�ti:: C3� 1�a.e��j<s�c sza� +crr_ Phone Number Address City air State 3 Zi Project Location (County, State Road, Water Body, etc.) Type of Project Activity PROJECT DESCRIPTION I SKETCH Pier (dock) length Groin length number Bulkhead length max. distance offshore Basin, channel dimensions cubic yards Boat ramp dimensions Other This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to be- come null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. -br_Qtm\`�� 15qn, (SCALE: MAR 16 applicant's signature V permit officer's signature issuing date expiration date attachments In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal Management Program. application fee Form DCM-MP-5 If BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. 1. BRIDGES a. Public X Private b. Type of bridge (construction material) reinforced concrete c. Water body to be crossed by bridge Far Creek d. Water depth at the proposed crossing at MLW or NWL +/- 3.5 feet e. Will proposed bridge replace an existing bridge? X Yes No If yes, (1) Length of existing bridge 35 feet (2) Width of existing bridge +/- 20 feet (3) Navigation clearance underneath existing bridge + /-1 foot (4) Will all, or a part of, the existing bridge be removed? (Explain) entire bridge to be removed f. Will proposed bridge replace an existing culvert(s)? Yes X No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL MAR 16 1998 (4) Will all, or a part of, the existing culvert be removed? (Explain) g. Length of proposed bridge 30 feet h. Width of proposed bridge 25 feet i. Height of proposed bridge above wetlands + /- 2-3 feet j. Will the proposed bridge affect existing water flow? Yes X No If yes, explain k. Navigation clearance underneath proposed bridge + /- 1 foot 1. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? Yes X No If yes, explain m. Will the proposed bridge cross wetlands containing no navigable waters? Yes X No If yes, explain n. Have you contacted the U.S. Coast Guard concerning their approval? Yes X No If yes, please provide record of their action. Revised 03/95 Form DCM-M -5 2. CULVERTS N/A a. Water body in which culvert is to be placed b. Number of culverts proposed c. Type of culvert (construction material, style) d. Will proposed culvert replace an existing bridge? Yes No If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) e. Will proposed culvert replace an existing culvert? Yes No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) f. Length of proposed culvert. g. Width of proposed culvert h. Height of the top of the proposed culvert above the MHW or NWL Will the proposed culvert affect existing water flow? Yes No If yes, explain MAR 16 1999 j. Will the proposed culvert affect existing navigation potential? Yes No If yes, explain 3. EXCAVATION AND FILL a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? Yes X No If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Depth of area to be excavated (4) Amount of material to be excavated in cubic yards b. Will the placement of the proposed bridge or culvert require any excavation within: No _ Coastal Wetlands SAVs _ Other Wetlands If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Amount of material to be excavated in cubic yards c. Will the placement of the proposed bridge or culvert require any highground excavation? Yes X No If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Amount of material to be excavated in cubic yards d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area (2) Dimensions of spoil disposal area (3) Do you claim title to the disposal area? Yes No If no, attach a letter granting permission from the owner. Revised 03/95 Form DCM-MP-5 MAR 1 6 ';,C\. (4) Will the disposal area be available for future maintenance? Yes No (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes No If yes, give dimensions if different from (2) above. (6) Does the disposal area include any area below the MHW or NWL? Yes No If yes, give dimension if different from No. 2 above. e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed below MHW cr NWL? Yes X No If yes, (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill f. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: _ Coastal Wetlands ^ SAVs _ Other Wetlands If yes, No (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? X Yes No If yes, (1) Length of area to be filled +/- 40 feet (2) Width of area to be filled +/- 5 feet (3) Purpose of fill backfill for endbents and wingwalls 4. GENERAL a. Will the proposed project involve any mitigation? Yes X No If yes, explain in detail b. Will the proposed project require the relocation of any existing utility lines? Yes X No If yes, explain in detail c. Will the proposed project require the construction of any temporary detour structures? Yes X No If yes, explain in detail d. Will the proposed project require any work channels? Yes X No If yes, complete Form DCM-MP-2 e. How will excavated or fill material be kept on site and erosion controlled? Application of Best Management Practices f. What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? Crane, backhoe, trucks g. Will wetlands be crossed in transporting equipment to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? Yes X No If yes, explain in detail M. Randall Turner, Division Environ. Officer_ _ Applicant o ject Nayie Signature January 2, 1998 Date Revised 03195 MAR 16 1998 IV v� \ so ..© 56 79 • 0 ` 7]J 50 e - r� °r p 58 26 li 25 c18 �' 54 CI7 52 L A K E M A T T A At U S K E E T ,sue: 14 "> 45 1� I 53 .,. \ may- �• 1 �`�/ / M'YF.SLN"N/h'4 13 I SN AMP 8A Y O Q \ I 5 ` R cW IOCK f - G..f LAUD r t nl NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF 141GHWAVC% COUNTY: HYDE PROJECT: Replace Bridge No.79 on S.R. 1319 DATE: Dec. 3, 1997 SUBJECT: VICINITY MA SCALE: MAR 16 1998 /Nc7F-:: W;A1C IAY,44L-S <Nb ABJ7A,_1ris �. o • 8oX // � n �� 4� v L �' .= n 7< iL o �� �7d 2� \\ SF PIC 2 Lf C oNC j',t'_ I) i T --C H 1 i ,-.� I �' St/Sr�or✓ � 3"D�Tch' a Floe FL. � • soy,(elk \ I �, Fred C . d` G1� uyiB ,�rP.cze Uf rll,q� ,y, �,� a906 u bt14JV f ell Vcz a3 3 Kr xts,E„ ), N C R 3 - L 57-,4. a. f 3 i0 F. QT. /YOtle �u1neP`Sfii�p �4g�e O Sho u id be re vets ec� MAR 16 199 ■ MEN Nod I%l�ical At -qv. C1egr4uY- w;/1 be s4m,-- 46 ex�sfi%c�