HomeMy WebLinkAbout22368_LAMB, WADE_19990706nCAMA AND DREDGE AND FILL
GENERAL N9 `" 2&2 3 6;8
� PERM IT
as authorized by the State of North Carolina
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15A NCAC
Applicant Name
AAA,
Citv
Project Location (County, State Road, Water Body, etc.)
Type of Project Activity
PROJECT DESCRIPTION J SKETCH
Pier (dock) length
Groin length
number
Bulkhead length
max. distance offshore
Basin, channel dimensions
cubic yards
Boat ramp dimensions
Other
I.
h_
I,f
r
This permit is subject to compliance with this application, site
drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine,
imprisonment or civil action; and may cause the permit to be-
corne null and void,
This permit must be on the project site and accessible to the
permit officer when the project is inspected for compliance.
The applicant certifies by signing this permit that 1) this pro-
ject is consistent with the local land use plan and all local
ordinances, and 2) a written statement has been obtained from
adjacent riparian landowners certifying that they have no
objections to the proposed work.
In issuing this permit the State of North Carolina certifies that
this project is consistent with the North Carolina Coastal
Management Program.
State
attachments
application fee
Phone Number -
FIR
(SCALE:
r
try,
issuing date
applicant's signature
permit officer's signature
expiration date
GARLIE WADE LAMB, JR.
DIANE J. LAMB
NCDL 2554380 PH. 252-633-5712
616 MADAM MOORES LN.
NEW BERN, NC 28562
Pay to the
Order of /
5493
66-19/536 NC
Date IL 3192
Dollars
slowmm%pmm7Y"pmA Advantage
NationsBank, N.A.
Forl�a3 — ! iA ��`— -- —
1:053000L961: 0003L3LLOL32116 S493
C Parke gmnka. GUARDIA SAFET BLUE WDBL
Eh'R - CO.-ISTAL i1f.AA'AGER1EA"T
' 1r7Z' O H.1?00
SECTION .1200 - GENERAL PERMIT FOR CONSTRUCTION OF PIERS: DOCKS: AND
BOAT HOUSES IN ESTUARINE AND PUBLIC TRUST WATERS
.1201 PURPOSE
This permit will allow the construction of new piers, docks, and boat houses in the estuarine and public trust waters
AECs and construction of new piers and docks within coastal wetlands AECs according to the authority provided in
Subchapter 7J .1100 and accordingto the following guidelines. This permit will not apply to the Ocean Hai W-d AEC.
History Nore: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984.
.1202 APPROVAL PROCEDURES
(a) The applicant must contact the Division of Coastal Management and complete an application ;
approval for development form requestin The applicant shall provide information on site location, dimensions of the project area, and
his name and address.
(b) 7-he applicant must provide:
(1) confirmation that a written statement has been obtained signed by the adjacent riparian property owners
indicating, that they have no objections to the proposed work; or
(2) confirmation that the adjacent ripa":an property owners have been notified by certified mail of the proposed
work. Such notice shall instruct adjacent properry owners to provide any comments on the proposed
development in writing for consideration by permitting officials to the Division of Coastal Management
within 10 days of receipt of the notice, and, indicate that no response will be interpreted as no objection.
DCM staff shall review all comments and determine, based on their relevance to the potential impacts of the
proposed project, if the proposed project can be approved by a General Permit If DCM staff rinds that the
comments are worthy of more in-depth review, the applicant shall be notified that he must submit an
appucation for a major development permit.
(c) Approval of individual projects shall be acknowledged in writing by the Division of Coastal Management and
the applicant shall be provided a copy of this Section.
(d) Construction must be completed within 90 days of the approval of the permit or the permit expires.
(e) Any modification or addition to the approved project
Management shall require prior approval from the Division of Coastal
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984;
Amended Eff. August 1, 1998; January 1, 1990.
.1203 PERNIIT FEE
The applicant must pay a permit fee of fifty dollars (550.00) by check or money orderpayable to the Department
HistaryNote: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-119; 113A-124;
Eff. March 1, 1984;
Amended Eff. March 1, 1991.
.1204 GENTERAL CONDITIONS
(a) Piers authorized by this general permit shall be for the exclusive use of the Iand owner, or occupant and shall not
provide either leased or rented docking space or any other commercial services. Piers designed to provide docking space
for more than two boats shall, because of their greater potential for adverse impacts, be reviewed through the major
permitting process and, therefore, are not authorized by this general permit-
(b) Individuals shall allow authorized representatives of the Department of Environment and Natural Resources to
make periodic inspections at any time deemed necessary in order to be sure that the activity being performed under the
authority of this general permit is in accordance with the terms and conditions prescribed herein.
(c) There shall be no unreasonable interference with navigation or use of the waters by the public by the existence
of piers, docks and boat houses.
(d) This permit will not be applicable to proposed construction where the Department believes that the proposed
activity might unnecessarily endanger adjoining properties; significantly affect historic, cultural, scenic, consen•ation
or recreation values, identified in G.S. 113A-102 and G.S. 113A-113(b)(4), nor that might significantly affect the quality
ENR - COASTAL MAN.4GEMENT
T1 5.4: 07H .1200
of the human environment.
(e) This permit does not eliminate the need to obtain any other required state, local, or federal authorization.
(f) Development carried out under this permit must be consistent with all local requirements, AEC Guidelines, and
local land use plans current at the time of authorization.
n'isrory Note: Authority G.S. 113A-107(a); 113.4407(b); 113.A-113(b); 113A-113'.1; 113A-1
Eff. March I, 1984;
.Amended Ef. .. May 1, 1990;
RRC Objection due to ambiguizy Ejf. May 19, 199?;
Amended Eff. August I, 1998; July 1, 1994.
.1205 SPECIFIC CONDITIONS
(a) Piers, docks, and boat houses may extend or be located up to a maximum of 400 feet from the normal high w•at�r
line, or the normal water level, whichever is applicable. `
(b) Piers, docks, and boat houses shall not extend beyond the established pier length along the same shoreline for
similar use. This restriction shall not apply to piers 100 feet or less in length unless necessary to avoid unreasonable
interference with navigation or other uses of the waters by the public. The length of piers shall be measured from the
water -ward edge of any wetlands that border the water body.
(c) Piers longer than 200 feet shall be pernutted only if the proposed length gives access to deeper water at a rate of
at least one foot at each 100 foot increment of pier length longer than 200 feet, or if the additional length is necessary
to span some obstruction to navigation. Measurements to determine pier lengths shall be made from the waterward edge of any coastal wetland vegetation which borders the water body.
(d) Piers and docks shall be no wider than six feet and shall be elevated at least three feet above any coastal wetland
substrate as measured from the bottom of the deckinz.
(e) Any portion of a pier (either fixed or floating) extending from the main structure and six feet or less in width shall
be considered either a "T" or a finger pier.
(f) Any portion of a pier (either fixed or floating) greater than six feet wide shall be considered a platfo,.m or deck.
(g) "T's, finger piers, platforms, and decks of piers on lots with shorelines 100 feet or greater in lenzdi shall not
exceed a combined total area of 400 square feet. The combined total area for lots less than 100 feet shall not exceed
four square feet per linear foot of shoreline.
(h) Platforms and decks shall have no more than six feet of any dimension extending over coastal wetlands.
(i) Boathouses shall not exceed 400 square feet and shall have sides extending no further than one-half the height
of the walls and only covering the top half of the walls. Measurem_nts of square footage shall be taken of the greatest
exterior dimensions. Boathouses shall not be allowed on lots with less than 75 linear feet of shoreline.
@ Areas enclosed by boat lifts shall not exceed 400 square feet.
(k) Piers, docks, decks, platforms and boat houses shall be single story. They may be roofed but shall not be designed
to allow second story use.
(1) Pier alignrrens along federally maintained channels must also meet Corps of Engineers regulations for pier
construction pursuant to Section 10 of the River and Harbors Act.
(m) Piers, docks, and boat houses shall in no case extend more than 1/4 the width of a natural water body, human -
made canal or basin. Measuremsns to determine widths of the water body, human -made canals or basins shall be made
from the w•aterward edge of any coastal wetland vegetation which borders the water body. The I/4 length limitation shall
not apply when the proposed pier is located between longer piers within 200 feet of the applicant's property. However,
the proposed pier shall not be longer than the pier head line established by the adjacent piers, nor, longer than 113 the
width of the water body.
(n) Piers, docks and boat houses shall not interfere with the access to any riparian property, and shall have a minimum
setback of 15 feet between any part of the pier and the adjacent properry lines extended into the water at the points that
they intersect the shoreline. The minimum setbacks provided in the rule may be waived by the written agreement of the
adjacent riparian owner(s), or when'two adjoining riparian owners are co -applicants. Should the adjacent property be
sold before construction of the pier commences, the applicant shall obtain a written agreement with the new owner
waiving the minimum setback and submit it to the Division of Coastal Management prior to initiating any development
of the pier, dock, or boat house. The line of division of areas of riparian access shall be established by drawing a line
along the channel or deep water in front of the prpDetry, then drawing a line perpendicular to the Ilne of the channel so
that it intersects with the shore at the point the upland property Iine meetsthe water's edge. Application of this Rule
may be aided by reference to the approved dia-am in Paragraph (q) of this Rule illustrating the rule as applied to
various shoreline configurations. Copies of the diagram may be obtained from the Division of Coastal Management.
When shoreline configuration is such that a perpendicular alignment cannot be achieved, the pier shall be aligned to
meet the intent of this Rule to the maximum e;:tent practicable.
E:\R - COASTAL MANAGEMENT
(o) Piers, and mooring facilities shall be designed to provide docking space for no more than two boats.
(p) Applicans for authorization to construct a dock or pier shall provide notice of the permit application to the owner
r,f any part of a shellfish franchise or lease over which the proposed dock or pier would extend. T-ne applicant shall
allow the lease holder the opportunity to mark a navigation route from the pier to the edLt of the lease.
(q) The dia- am shown below illustrates the various shoreline configurations.
:-History Note, Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Ef. March 1, 1984;
Amended Eff. December 1, 1991; May 1, 1990; March 1, 1990;
RR Objection due to ambiguity Ejf. March 18, 1993;
Amended E, f: August 1, 1998, April 23, 1993.
ADJACENT RIl'ARIAN PROPERTY OWNER STATEMENT
(FOR A PIERIMOORING PILINGSIBOATLIF (BOATHOUSE)
I hereby certify that I own property adjacent to A IMF 's
(Name of Property Owner)
property located at (o lb MLDA tit �19 1S (-Arse '
(Lot, Block, Road, etc.)
on -rlZe,raT �v�R , in CY kq E� , N.C.
(Waterbody) (Town and/or County)
He has described to me, as shown below, the development he is proposing at that
location, and, I have no objections to his proposal. I understand that a pier/mooring
pilings/boatlift/boathouse must be set back a minimum distance of fifteen feet (15') from my area
of riparian access unless waived by me.
y I do not wish to waive the setback requirement.
I do wish to waive that setback requirement.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT:
(To be filled in by individual proposing development)
12 _�
lb�`t 4t
T
-r
�� ba�31 c•ck
blc.'3.
ognture
Print or Type Name
2S2 - �3 7 - J 7-3 L�
Telephone Number /
Date: �- C� Cf
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
(FOR A PIERIMOORING PILINGSIBOATLIFT/BOATHOUSE)
I hereby certify that I own property adjacent to �/VR.(),- UM:D 's
(Name of Property Owner) a w
property located at & ((o Mh 43A M �k-d r i� �S L-A �C" ,
(Lot, Block, Road, etc.)
on r¢E�zr Zugw- , in C-ekJ0, , N.C.
(Waterbody) (Town and/or County)
He has described to me, as shown below, the development he is proposing at that
location, and, I have no objections to his proposal. I understand that a pier/mooring
pilings/boatliftlboathouse must be set back a minimum distance of fifteen feet (15') from my area
of riparian access unless waived by me.
y" I do not wish to waive the setback requirement.
I do wish to waive that setback requirement.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPNIENT:
(To be filled in by individual proposing development)
(2XIE I
btef
(tc+7k T {
Signature
Print or Type Name
25 z- 7
Telephone Number
Date: _2C j Cl
Y7
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
(FOR A PIERIMOORING PILINGSIBOATLIFT/BOATHOUSE)
I hereby certify that I own property adjacent to 11, %A ()E [Am? 's
(Name of Property Owner)
property located at & l (o Mh bd M P-&o e i )�j5
(Lot, Block, Road, etc.)
on root 1Z,o6,R , in C7AgE-:,, , N.C.
(Waterbody) (Town and/or County)
He has described to me, as shown below, the development he is proposing at that
location, and, I have no objections to his proposal. I understand that a pier/mooring
pilings/boatlift/boathouse must be set back a minimum distance of fifteen feet (15') from my area
of riparian access unless waived by me.
v I do not wish to waive the setback requirement.
I do wish to waive that setback requirement.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT:
(To be filled in by individual proposing development)
IZK12 rJO��� (0u5C
Id-.�4+
U'
t
uh^'Q �.J�C•l,k
Signature
Print or Type Name
2t5 z- - 63 7 - I 6-)
Telephone Number
Date: z I
� ` 1
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
(FOR A PIER/MOORING PILINGSIBOATLIFFIBOATHOUSE)
I hereby certify that I own property adjacent to VVmy, L_-�Mb 's
(Name of Property Owner)
property located at & ((o MA OA M ���,� �s LAae
(Lot, Block, Road, etc.)
on r¢g�xt 1Z'Ugy_ , in C?AA GtJ , N.C.
(Waterbody) (Town and/or County)
He has described to me, as shown below, the development he is proposing at that
location, and, I have no objections to his proposal. I understand that a pier/mooring
pilings/boatlift/boathouse must be set back a minimum distance of fifteen feet (15') from my area
of riparian access unless waived by me.
V, I do not wish to waive the setback requirement.
I do wish to waive that setback requirement.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT:
(To be filled in by individual proposing development)
. I
iZK12 bo`�� E�°45�
T
-t'
i�1 a•ck
NA'J'
� i4;'1yLMAz?_ �7. al_ '
gnature
_iLn f _ALC_1LA01N_'_EE_4=__
Print or Type Name
2��- 637-373L�
Telephone Number
Date: �- "