HomeMy WebLinkAboutGeneral Permits (4585)rn
CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203. 1
Applicant Name I-f Phone Number „ 2 2 7 7 y!
Address U S ) „�� f4 Z : IJI
CityTq State Zip
Project_ Location (County, State Road, Water Body,iS_ et .) t2 (.- f K �I l � ! -� ,4 n1O l /VGr" _
Type and Dimensions of Project' f 1- `L- j
The proposed project to be located and constructed as described
above is hereby certified as exempt from the CAMA permit re-
quirement pursuant to 15 NCAC 7K .0203, This exemption to
CAMA permit requirements does not alleviate the necessity of
your obtaining any other State, Federal, or Local authorization.
This certification of exemption from requiring a CAMA permit is
valid for 90 days from the date of issuance. Following expiration,
a re-examination of the project and project site may be necessary
to continue this certification.
SKETCH LJ )4 Cam,► (SCALE:
pL�
Ll
?v J �..
IZ
car
L.-
�v PA J
Any person who proceeds with a development without the con-
sent of a CAMA official under the mistaken assumption that the
development is exempted, will be in violation of the CAMA if there
is a subsequent determination that a permit was required for the
development.
The applicant certifies by signing this exemption that (1) the ap-
plicant has read and will abide by the conditions of this exemp-
tion, and (2) a written statement has been obtained from adjacent
landowners certifying that they have no objections to the
proposed work.
Applicant's signature
CAMA Official's signature
Issuing date
Expiration date
Attachment: 15 North Carolina Administrative Code 7K .0203
November 2, 1999 n � p q-,�__i
Mr. Eugene Jordan 1�
402 Sign Pine Road LAMA NOV Q4
COASTAL MANAGEfViENT
Tyner, NC 27980 L MOREHEAD I
Re : Certificate of Exemption
Dear Mr. Jordan :
This letter is in reference to your CAMA Certificate of Exemption which was issued on July 6,
1999. This certificate authorized the construction of a pier and platform along the shoreline of
your property located at the end of Bass Landing Road in Chowan County within the waters of
the Chowan River.
On October 6, 1999 a site visit was conducted at this site to determine and confirm that your
project was completed in accordance with the rules of the North Carolina Administrative Code
and the Coastal Area Management Act concerning pier and platform construction. During this
inspection, it was apparent that this structure has sustained some minor damage. As a courtesy,
I wish to advise you that the repair and maintenance of this structure may be completed under
the Maintenance and Repair Statutory exclusion and will require no additional authorization from
this Division. Maintenance and repair activities of this nature are excluded from the definition of
development and CAMA Permit requirements [NCGC Section 113A-103 (5)(b)(5)].
Than you for your time and cooperation in regard to complying with the rules of this Division. If
you have any questions, please feel free to contact me at (252) 264-3901.
Sincerely.
Dennis W. Hawthorn
Coastal Management Representative
cc : Charles S. Jones, Assistant Director, DCM
Doug Huggett, Permits Coordinator, DCM
Raleigh Bland, USCOE
North Carolina Department of Environment and Natural Resources James B. Hunt Jr., Governor • Wayne McDevitt, Secretary
Division of Coastal Management Donna D. Moffitt, Director
Elizabeth City Office • 1367 US 17 South • Elizabeth City, NC 27909 • Phone 252-264-3901
PERMIT COMPLIANCE MONITORING REPORT
Project / Permittee Name
Mr. Eugene Jordan
402 Sign Pine Road
Tyner, NC 27980
County: Chowan
Permit Number: Exemption Expiration Date : Oct 4, 1999
Location : Rocky Hock, end of Bass Landing Rd., Chowan River
Division Representative: DWH
Project Representatives Present : none
Type of Approved Project Activity : pier, platform
Date of Inspection : Oct 6, 1999
Progress to Date : Complete
Permit Condition(s) Non -Compliance : None but see comments below
Corrective Action(s) Required : None
Comments : The pier and platform were built consistent with the rules but was
pushed up from the seasons storms/hurricanes. Send Mr. Jordan a
courtesy letter advising that the repair of his pier will not require
any authorization from CAMA, the work will be considered M/R
a' o
CERTIFICATION OF EXEMPTION
.FROM REQUIRINGA CAMA PERMIT
as"authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203.
Applicant Name o 6 01-4 C_ Tb(ZPhone Number 2 21 —
Address Vol 16AJ PhVIE7,A%f
City State Zip
Project Location County, State Ro d, Wa er Bod et . 10 h�
1 ( Y )
_ Type and Dim n ions of Project I IL2 P Z +
The proposed project to be located and constructed as described
above is hereby certified as exempt from the CAMA permit re-
quirement pursuant to 15 NCAC 7K .0203. This exemption to
CAMA permit requirements does not alleviate the necessity of
your obtaining any other State, Federal, or Local authorization.
SKETCH (,J0>3
-
w ,
This certification of exemption from requiring a CAMA permit is
valid for 90 days from the date of issuance. Following expiration,
a re-examination of the project and project site may be necessary
to continue this certification.
(SCALE:
-- r►Cz
I '
i.
1
--- - _�
. ti I
Any person who proceeds with a development without the con-
sent of a CAMA official under the mistaken assumption that the
development is exempted, will be in violation of the CAMA if there
is a subsequent determination that a permit was required for the
development.
The applicant certifies by signing this exemption that (1) the ap-
plicant has read and will abide by the conditions of this exemp-
tion, and (2) a written statement has been obtained from adjacent
landowners certifying that they have no objections to the
proposed work.
nature
7.
Issuing dAte
Expir on to '
Attachment: 15 North Carolina Administrative Code 7K .0203