Loading...
HomeMy WebLinkAbout18700_FISHER POINT HOA_19970619CAMA AND DREDGE AND FILL GENERAL r .fit': 0�.8%00 PERMIT�sj�� as authorized by the State of North Carolina Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC Applicant Name > °r %�' Phone Number Address City Project Location (County, State Road, Water Body, etc.) Type of Project Activity PROJECT DESCRIPTION j SKETCH Pier (dock) length Groin length number Bulkhead length max. distance offshore Basin, channel dimensions cubic yards Boat ramp dimensions Other This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to be- come null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal Management Program. State Zip (SCALE: 1 u J,. f t � V applicant's signature r permit officer's signature ,{issuing date attachments � r3 C 7 expiration date application fee JOYCE M. STATON DL 241817 THE A. LLOYD STATON DL 2091108 3326 GO Circle 153 THURMAN RD PH 728-3441 \\ // BEAUFORT, NC 28516 � �j �, /� 66-7704/2531 19 PAY R THE /J - G ORDER OF $ 0 —r C Stat ployees' Credit Union DOLLARS 0 62 Morehead City, North Carolina FOR 6 W- I Z 7rr� ': 2 5 3 i 7 7049':08606 768 16811■ 26 •HARLAND _ i i v 7V ¢ -NF-�� A-B-C MAKI- plu. �xi7TiNt� V-.�.raR_u�-tza,M�'-trrtoul - ate- v- �u�ov� •�� 8�hizDs _\VHF-tt�• N���D-- = -- - e o as o D u • o a u e e o• -- -------7..�- P ly �IJ�Y� SfkN.D qVF— r=C 151' w Co 'SLAO ��tT?AMn". i �CS G � SILL t , MONROE JOHNSON CONSTRUCTION, INC. P. 0. Box 628 Morehead City, NC 28557-0628 (919) 728-7872 (FAX) 728-1908 QUOTE Re: Community Boat Ramp c/o Lloyd Staton 153 Thurman Rd. Beaufort, NC 28516 (919) 728-3441 Job: concrete boat ramp use of back -hoe @ $500.00/ day (estimate (2) days) $1,000.00 place ABC as fill @ $43.00/ ton (estimate (2) loads 44.2 tons ±) $1,900.60 add 2x8x12' v-groove pt boards (4) $41.40 pour new slab w/ 4,000 psi concrete @ $78.00/ yd. (estimate (16) yds.) $1,248.00 labor / incidental materials / wall reinforcement ... $2,000.00 Estimated cost $6,190.00 APProvedbS- Date: 2 Z MO OEJO SONCON UCTON, INC.