Loading...
HomeMy WebLinkAboutGeneral Permits (4217)1 CERTIFICATION OF EXEMPTION FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, / Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203. Applicant Name Address City - - Project Location (County, State Road, Water Body, etc.) Type and Dimensions of Project The proposed project to be located and constructed as described above is hereby certified as exempt from the CAMA permit re- quirement pursuant to 15 NCAC 7K .0203. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal, or Local authorization. Phone Number State Zip This ccrtification of exemption from requiring a CAMA permit is valid for 90 days from the date of issuance. Following expiration, a re-examination of the project and project site may be necessary to continue this certification. SKETCH (SCALE: ) Any person who proceeds with a development without the con- sent of a CAMA official under the mistaken assumption that the development is exempted, will be in violation of the CAMA if there is a subsequent determination that a permit was required for the development. The applicant certifies by signing this exemption that (1) the ap- plicant has read and will abide by the conditions of this exemp- tion, and (2) a written statement has been obtained from adjacent landowners certifying that they have no objections to the proposed work. 77 C_,.. / /{1 f i mi Applicant's signature�,�+WM1/_� s ^ CAMA Official's signature Issuing date Expiration date Attachment: 15 North Carolina Administrative Code 7K .0203 ,i► - ���. Location: } Field Fe-p. (G� 1 / Phone: �j -D — � `�� Date of P.eport: Description of Project: Date Project Reportedly Comp7`'ete: (1) ' Do the measured dimensions of the developmenf 'iffer frori those indicated in the permit .and,%wo kplat?, Yes / ro Have all permt conditions been satisfied? 'Y s / No 1. COY-MENT : i :li (2) Sedimentation an(f Fresion Control: Has pern'wlt�== Sc=dc CraSSc�� or cCerlse sta�.i1iZed all C1Sturbed areas: IYc= NO r CO2P'H^ NT : (3) Future MOnitcrinQ and rnfcrcenent P_C' n: ISTfur�._er inVEStiQaticn or enforcement action needed? Yes /r N COi'�� NT