Loading...
HomeMy WebLinkAboutGeneral Permits (3851)TI TEXEMPTION CER FICA ION OF FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Q� Department of Environment, Health, and Natural Resources and the Coastal Resources Commission i in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203. Applicant N me 8er f I _0 -f Phone Number `' - 792Jk, ' % P S- Address V C . City Lity, rj^- a -I-. el Mate F Zip _ 3 J Project Location (County, State Road, Water Body, etc.) C r, `7 r Type and Dimensions of Project 1,4 d ,,� l Kl, -tea The proposed project to be located and constructed as described above is hereby certified as exempt from the CAMA permit re- quirement pursuant to 15 NCAC 7K .0203. This exemption to LAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal, or Local authorization. This c(-rtification of exemption from requiring a CAMA permit is valid for 90 days from the date of issuance. Following expiration, a re-examination of the project and project site may be necessary to continue this certification. SKETCH (' &� `t 4 (SCALE: ) , 6 Ell 0 m o p s G a G u/�ti 10�� o � x g Any person who proceeds with a development without the con- sent of a CAMA official under the mistaken assumption that the development is exempted, will be in violation of the CAMA if there is a subsequent determination that a permit was required for the development. The applicant certifies by signing this exemption that (1) the ap- plicant has read and will abide by the conditions of this exemp- tion, and (2) a written statement has been obtained from adjacent landowners certifying that they have no objections to the proposed work. (n�+ -70 4- 7% �o CJ Nw, CAMA Official's signature d% Issuing date Expiration date Attachment: 15 North Carolina Administrative Code 7K .0203