Loading...
HomeMy WebLinkAbout18631_CROW TOW, INC._19980505'-r..:-`"�;'�i� �:�i'��+�. `r�,#':.ai�--'.�'�; a-�='s .� �'",��.s";:"�:w,'`"�-::�-,•:.Y` '•�:r"�3;��_ �¢,-�-��—t'^r..-.--:-. --.rc-:-�-1r,�; CAMA AND DREDGE ANUTAL GENERAL PERMIT as authorized by the State of North Carolina Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC Applicant Name L_rC_W /C; -_4711C. Address �"'4� // 21k 2C— City ->l�a !i'r Project Location (County, State Road, Water Body, etc.) Phone Number State Zip � M PROJECT DESCRIPTION SKETCH !, (SCALE: ) > Pier(dock)lengthr�`� yl olIt,j�y�a41 i } Groin length number I x Bulkhead length max. distance offshore I Basin, channel dimensions �--- /jAp�10 f i cubic yards - •.,,- >--- j �y O�c� b Yh� ' I �4 pict��rrA, PY���;.•; Boat ramp dimensions sUal: ctc,y Other X a lyo-V/". 6, WiA Y. A Jorv- � %t'Aih't: ;i3411<wu. -_ -, --- T--�-�--- --=-=ems ,�,d d � ----• �, �_.._ 1u 16L'y `� ,i 3r+t,••.ErJ<• GL� drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to be- come null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. issuing date attachments l �llQ I lb r applicant's signature permit officer's signature expiration date In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal application feey`- Management Program. JAMES H. POU BAILEY, JR. 11193 3332 Ph 919-726-4048 P 0 Box 267 66-30/531 Atlantic Beach, NC 28512 19 ORPAYDER OF TO THE DOLLARS IIST CITIZENS BANKF1,11-CINzens Batik & 71US1 Company Atlantic Beach, NC 23512 0 4u/ FOR ::1:0 S 3 100 3001:13 17 Lt 150 2 2no Z�3 3 3 2 41 �UHICM FRINTERY TEL No.919-687-0500 04-?8-199B 11'.41AM FROM Apr 28.98 12:08 No.003 P.01 TO 113196879EM P.01 To: CAMA Re. Dock & DOUW Repairs at Crows Nut Marina vats: 4W198 As ease of the adjacent WI(Igwaoxg to UOWS NW MahM, I hereby get MmjWon Ibr tbecn to repair the rvvo ba*&Ca& aW rR%01- the fimd dOC4 On Ow wm Side of tbc main basin with flooing 4vb as discussed WithJiroBailey. No work is contemplated to be dme on my propeny- My undersumimg is that is WOA Wit W WuOdcd by July 31, 19Y8. Signaum TMYY MrI 104 CAd Cause"y PA Attoftc tseadi, NC A PR 2 9 1998 TUTAL P.01 To: CAMA Re: Dock & Bulkhead Repairs at Crows Nest Marina Date: 4/23/98 As one of the adjacent landowners to Crow's Nest Marina, I hereby grant permission for them to repair the two bulkheads and replace the fixed docks on the west side of the main basin with floating docks as discussed with Jim Bailey. One of the bulkheads is located behind our shopping center and we grant them access for the purpose of doing this repair. All work is to be accomplished with a minimum of disturbance to the tenants of Causeway Shopping Center.My understanding is that this work will be completed by July 31, 1998. 07AW� Signature J.H.P. Bailey, Jr. Property Manager Causeway Shopping Center Atlantic Beach, NC APR