HomeMy WebLinkAboutGeneral Permits (3119)i
CERTIFICATION OFF
FROM REQUIRING A CAMA PE `MIT
as authorized by the State of North Carolina, �,� �r
Department of Environment, Health, and Natural Re iarQ an the Coastal Resp. tomes Commission
in an area of environmental concern pursuant to 15 &(1 'ter
Applicant Namey'-O!�1
Address f ! �T f
.
City r -;
Project Location (County, State Road, Water Body, etc.)
�l �l✓F Y 'n, i-r C---"= z C r_V� e-
Phone Number iG/Ji ;%:• `'�.�%,'
State Zipri � �s
si,
Type and Dimensions of Project
� `%'�-'- !//-r'� .2 L-[.h!I IMP rG✓Cc %.+7� i �.J.�/� e-fF C-/ if r- e- e J'J' e_--
The proposed project to be located and constructed as described This certification of exemption from requiring a CAMA permit is
above is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following expiration,
quirement pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be necessary
CAMA permit requirements does not alleviate the necessity of to continue this certification.
your obtaining any other State, Federal, or Local authorization.
development is exempted, will be in violation of the CAMA if there
is a subsequent determination that a permit was required for the
development.
The applicant certifies by signing this exemption that (1) the ap-
plicant has read and will abide by the conditions of this exemp-
tion, and (2) a written statement has been obtained from adjacent
landowners certifying that they have no objections to the
proposed work.
/0AMAC� icial's signature �^
Issuing date
Expiration date
Attachment: 15 North Carolina Administrative Code 7K .0203
- - - - - - -- - - _ - _ _ +A LIIE
% f
ILI
2 fV
v.
0-T ! t1 a' -�
E s as
L
V BY L SbdALL!
BY -- -- -- -- --- !—
W
i
3 lra
a hl
4
JAY&VALERIE WILLIS
HER &. POCK FLAN
5ILYEF, b%KE- OCRACOKE- HYDE C-O. - NORTH CAROLIN
�t -,,-k � -�4
I