Loading...
HomeMy WebLinkAboutGeneral Permits (2905)0`CERTIFICATION OF EXEMPTION v FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0263. 25 Applicant Name f , ( k 5r , d.y T ` Phone Number 2.'� 2 ."��D. �"/� Address City State t Zips ; Project Location (County,, State Road, Water Body, etc.) VCW J ���?/.'Vt / / /�' 1- -X2 < -S °mac cz� Type and Dimensions of Project The proposed project to be located and constructed as described above is hereby certified as exempt from the CAMA permit re- quirement pursuant to 15 NCAC 7K .0203. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal, or Local authorization. SKETCH This certification of exemption from requiring a CAMA permit is valid for 90 days from the date of issuance. Following expiration, a re-examination of the project and project site, may be necessary to continue this certification. -�- to bo (SCALE: S ) / li 1 4", /V�(Al 12-6 Any person who proceeds with a development without the con- sent of a CAMA official under the mistaken assumption that the development is exempted, will be in violation of the CAMA if there is a subsequent determination that a permit was required for the development. The applicant certifies by signing this exemption that (1) the ap- plicant has read and will abide by the conditions of this exemp- tion, and (2) a written statement has been obtained from adjacent landowners certifying that they have no objections to the proposed work. s Applicant's signature CAMA Official's signature flly Issuing date Expiration date Attachment: 15 North Carolina Administrative Code 7K .0203 Nov 09 07 11:43a Ric Wright 252-330-4091 p.2 NDO-07-2087 14:09 From: 1 o:cf�c� tiul.11 -•� CERTIFICATION OF EXEMPTION - FROM REQUIRING A CAMA PERMIT as authorizod by ilia State of North Carolina, Department of Environment. Health, and Natural Resources and the Coastal Ro urcos Commieeion L„ In on arse o1 onvlronmomal contain pure? t oh NCAC Sutxfta?Ier 7K P20. S� 330. yM��J Applicant Name ,� �� S.*arwcs I' l ''SS " Phone Number ZSZ ,33D. S'�if Address �^ (-_ ►- fateA.1C zip City _ Project Location (County, Stal oad, water Body, etc.) w G 74 `type and Dimeni—lons ojf roject Tho proposed project to be located and constructed no doocribed ef,ovo Is hereby certified as exempt from CAMA permit ro- quiremont pursuant to 15 NCAC 71( 3. This exemptbn to LAMA permit requiremonts doa9 alleviate the neceoclty of your oblalning any othor Siato, Federal, or Local authorization, SKETCH This codification of oxemptlon from requiring a CAMA permit it, valid for 80 days from the date of IaeUDMA, FoNowing expiration, a ro•oxaminatlonof the project and project mile ay be noceomnry to continuo thin certification, 12, /•C /o / b /i 4 (SCALE, v.. I r 1=4 .71 (/ re e z6A 4,o4t . y M A/ C U✓ /� C �,-, � j � M Any person who proceeds with a development without the con. 3onl of a CAMA official under tho miulakon assumption that the developmont is exomptod, will t>o In vlolotion of the LAMA fl there Is o aubooquont dotorminatfon that a permit wat: requirod for tho development, The applicant cediflos by algning thin oxomptlon that (1) rho ap- plicant has read end will abide by the condltlons of Ihls oxomp- lion, And (2) a wrhlon Gtatomonl has boon obtolnod from adjacent landownars certifying that Ihay hove no objections to tho proposed work. CAM f0flicial'm sign uro 7, laouing date Expirallon data Ahachmonr; 16 North Carolina Adminlstrativo Code 7K Fd3