Loading...
HomeMy WebLinkAbout54656_WAND, STEPHEN_20090926CCAMA DREDGE & FILL 13e� MUCI GE4,N.FRAL PERMIT Previous permit # Ohew ElModification ElComplete Reissue E]Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC 0 Rules attached. Applicant Name --f? 1) Project Location: County Address t, Street Address/ State Road/ Lot #(s) City State. zip _J Phone # Fax # Subdivision Authorized Agent Affected F] Cw AEC(s): El OEA Ll Pws: ORW: yes / no - DES El PTS - UBA El N/A Crit.Hab. yes / no City ZIP Phone# River Basin -TA Adj. Wtr. BodyCcl��l 0�1" 0,% (nat /g2an Junkn Closest Maj. Wtr. Body Ne \,j '< , ", I Type of Project/ Activity (Scale: Pier (dock) length Platform(s) Finger pier(s) Groin length number Bulkhead/ Riprap length_ avg distance offshore max distance offshore Basin, channel cubic yards Boat ramp Boathouse/Boat"14, Beach Bulldozing Other Shoreline Length SAV: not sure yes no Sandbags: not sure yes no Moratorium: n/a yes no Photos: yes no Waiver Attached: yes no A building permit may be required by: Notes/ Special Conditions j t VI I -TJ c gdm� III El See note on back regarding River Basin rules. 2.( - 2 "rJ Agent or Applicant Printed Name Signature "Please read compliance statement on back of permit" ') oo�- --- — -.-- 3, A Application Fee(s) Check # Permit Officer's Signature : I Issuing Date Expiration Date (7 Local Planning Jurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certifythatthis project is consistentwith the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-648 I) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax:910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 - _4_1'_` (1 ;:l_l_' F r OfiI: ADJACENT RIPARIAN PROPERTY OWNER STATEMEM' (FOR A .PLCRAV00J ING PILINGSIBOATLIFTIBOAT1.10USE) I hereby certify that I own property adjacent to (Name of Property Owner) property located at -- (Lot, Blocks .Road, etc.) (Waterbody) J (Town and/or County) Applicant's phone #:1�--? i d Mailing Address: n11 � % - - He has described to me, as shown below, the development he is proposing of that locaalor., amn ' , have no ob•;eetions to his proposal. I understand that a pier/mooring pilings / boatl ift / hoathousc must be set back a minimum distance of Flteen feet (15') from my area of riparian access unlct s waived by me. (Ifyou wish to wstive the setback, you must initial the appropriate blank: below.) I do not: wish to waive .I. do wish to waive that setback requirement. DESCRIPTION ANWOR DRAWING OF PROPOSED DEVELOPMENT: (To be filled In by inelividual proposing (levelopment) (Ynformation for Property Owner Applying (Riparian Property Owner Inforn12tion) for Permit) Nlailinb Address Signa' ="e 1'elepho e u /b/e, Signature Date Awn i =l i3 CIE:: 03 F r orn: To: �1Gi_cT. ADJACENT RIPARIAN PROPERTY OWNER STATEMENT (FOR A .f?MER/M. 00JUNG PI INGSIB OA T.l+lF TIBOA THO US.R) I hereby certify that l own property adjacent toTsy`�� s �� ame of Property Owner) ,K] property located at _..�. �.a _ (Lot, Dlo k, .Road, etc.) (Waterbody) (Town an /orCounty) Appliennt's phone #: 2 D �i_ Mailing Address: 5?h 3 He has described to me, as shown below, the development he is proposing at that location, and, have no objections to his proposal. I understand that a pier/mooring pilings / bontlifl l hoathousc: must be set back a minimum distance of fifteen feet (15') from niy area of riparian access unicss waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do not: wish to waive .l. do wish to waive that setback requirement. ................................................ ................................................. �.......---- DESCRIPTION AND/OR DRAWING Or PROPOSED DEVELOP N-l"P.N: (To be filled In by Inelivi(lual proposing development) (information for Property Owner Applying for Permit) c� v3 mM r� ,Mailing Ad_dre-s'su, �1 City/State/Zip Telepho u by Signature D.,(z (Riparinn Property OwnerInlbrmatic) n) - -- Signature Print or Type 'felephone'�ur;i �r .':;tC i L *GOWA15,t GRiASd H-TTW 61 FtT-r im (a KP LOCATLO 004 7hE SeAKIp4ft 6ktXVE'a"IIP4O TA IV(*AA. GKE.&,,.* FIT-rwus 10 N PUI.1-LY 6MAPT PLA-TE To keep your lift working properly year round. . your lift should be inspected at least every six (6) months. • ' Fhe pipe bearings should be lubricated with standard bearing grease. The motor and gear assembly system should also be maintained per the manufacturers specifications. Most electric power hoists are equipped with three (3) grease fittings. All grease fittings, as well as the gear teeth should be packed with grease to insure the mechanisms longcvlty. • Annually, the gear assembly should be cleaned of excess grease and re -greased to insure proper operation. Check all cables for broken strands. If strands are broken, the cables should be replaced. • Check cable clamps and tighten if necessary. • Replace cable every five (5) years. Check and tighten all nuts and bolts on entire assembly at each inspection. Check cradle bunks for looseness and tighten as needed. STEPHEN L. WAND JULIE S. WAND 803 MAPLE STREET JACKSONVILLE, NC 28540 PH. 910-455-8678 y tro the ded ` 66-21/530 397, Dale 0t', i© WACHOVIA Wachovia Bank, N.A. wachovia.com � For y rvr l:0530002191:101-,L8LL2aL02Lo 3975