Loading...
HomeMy WebLinkAbout53036_VERDETTO, LEONARD SR._200903274oci C� CAMA / F1 DREDGE & FILL a� I ` GEMERAL PERMIT /�Previouspermft# ❑New ❑Modification [-]Complete Reissue Partial Reissue 1/rL/ Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC [-I Rules attached. Applicant Name f` ! /�� b (t i €' I'i ' _ Project Location: County _ -_----- A Address 1 '� f I J ; ,� � f r� �.'�? c=' ��; ,� �'' Street Address/ State Road/ Lot #(s) City ,Y :- j i State ZIP i Phone # ( ) —�{: �'- Fax # (}----- - Subdivision Authorized Agent ter` " City ZIP Affected ❑ CW ❑ EW ElPTA [IES ElPTS Phone # ( ) River Basin f ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A U -�' -' `� ) AEC(s): Adj. Wtr. Body t✓. E (nat. /man /unkn ❑ PWS: ❑FC: t. ORW: yes / no PNA yes / no Crit.Hab. yes / no Closest Maj. Wtr. Body Type of Project/ Activity Pier (dock) length r Platform(s) — —�" r ��. Finger pier(s) I 1 — --- Groin length number r � , Bulkhead/ Riprap length - -- r - i I- avg distance offshore max distance offshore Basin, channel _I cubic yards_ Boat ramp Boathouse/ Boatlift Beach Bulldozing Other Shoreline Length ! SAV: not sure yes Tno. Sandbags: not sure yes f no Moratorium: n/a yes no Photos: yes j no Waiver Attached: yes no A building permit may be required by: Notes/ Special Conditions 0; ; `+" Agent or Applicant Printed Name Signature Please read compliance statement on back of permit Application Fee(s) Check # i (Scale: J),n t "i ) See note on back regarding River Basin rules. Permit Officer's Signature LC�171rb 71-��J;?V Issuing Date Expiration bate L� rt A Mo Local PlanningJurisdiction —r_ Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian Iandowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar- Pamlico River Basin Buffer Rules ❑ Other: [] Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Morehead City Headquarters Mailing Address: 400 Commerce Ave 1638 Mail Service Center Morehead City, NC 28557 Raleigh, NC 27699-1638 252-808-2808/ 1-888ARCOAST Location: Fax: 252-247-3330 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax: 9 19-733-1495 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 ADJACENT RIPARIAN PROPERTY Ot3',ER STATLNIENT (FOR A PIER ,f00R11VG PILrVGS'BOA TL1FT/BOA TfiOt1SE� hereby certify that I own property adjacent to Property located at (Name of Property 0- ner) (Lot, Block, Road, etc.) on `�}j0ur,� i (�Vaterbodti in —„_'2��/� -111 i— , N.C. •) (Town and/or Count) He has described to me, as shown below, the deve11op71ent he is proposing at that location, and, I have no objections to his proposal. I understand that a pier/mooring piiinQ; boatl; Waived by me. Rboathouse must be set back a minimum distance of fifteen feet (i 5') from my area of riparian access unless I do not wish to waive the setback requirement. I do wish to iwaive that setback requirement. ----------------- DESCRIPTION AND/OR DRANZ'ING OF PROPOSED DEVELOPMENT: (To be filled in b►- individual proposing dej,elop,111>110 i I --� V ------------- -....... .,-f Signature y Pin�rT I�*ame Telephone �'urtZbe� �� �✓ Date: FROM Panasonic FAX SYSTEM PHONE NO. : 919469leeG Mar. 24 2009 07:00PM P1 (Oar 24 ,;G G6:57p.:xi cr „;Ol-[ �;" -. t _v PI !FG�R ,1 rrP1L'1�;bfG�ORf<�'� PdLl.'�' S'80� 77LIF71BOATHOi✓SE) I 'tec.cry ce,—;'vl�I vra�Propert`' adjacent To (�zrnc of Proper.� Oz.ner) ptoptRy tcycated aE _�.tj Q. Y'�•J�� "'�✓�t�u� (Lot, Block, Road, etc.) (To%-n and.'ar Coust,,v) He has describcd to Mc, as shown Wow. the ae.c;op; ;end. he, s tha: jaca!ioo, A,1d, I lava f+.o objcc, ;or.s to his pCOP 0Sal. I urdersrarrd t'(%at :t pier/nvooringP:jings")oacI.'C nito tho:�se wait/ -d y Z71ch a Mr-Irnu r distance o°fiftecr; fcc; (i5'j from my area of iiparisn access unlCss ��aived �y me. _ I do no wislr to "'give the setback req► iremem, i do %k;sh to .�aivc that s+etba& requircmerit. ------------•-.- ---- _ _ DES CRJ M O'ti A D!OR DRA.IV(NG OF PROPOSED I�EvE�' ------- --- - -- - (1 a be fllcr( i�� by f1r[fiYirlu;rl proposbtg rlevelopt� ent) OY�1£��T: \1l A I I I - - -- - : ' -- Si SIgn 'tire Print or TypeN?ame6� �� Tel L.� �1 7eltphonc 17acc: A NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor James H. Gregson, Director William G. Ross Jr., Secretary Date _ y.- L_0 9 Applicant Name L'c 3/%/V—i1 Mailing Address V 17714 b % S eq,42) 4 %/� I certify that I have authorized (agent) to act on my behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to install or co at (location) i- nstruct (activity) This certification is valid thru (date) Signature 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX: 252-247.3330 \ Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Chuck Wakila, Deputy Director BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Tar - Pamlico & Neuse River basins per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0233 & .0259. Activities covered by your Coastal Area Management Act (CAMA) permit are deemed to have a Buffer Authorization from the DWQ only if the project can meet ALL of the conditions listed below. If ALL the avoidance and minimization guidelines described below cannot be met, a separate buffer authorization request must be submitted using a Pre -Construction Notification (PCN) application to DWQ at the address below. A PCN application may be obtained on the DWQ web site http://h2o.enr.state.nc.us/wetlands.htm1. Questions regarding this process should be directed to wetland/buffer staff of the DWQ in the Washington Regional Office at 252-946-6481, or the 401 Oversight Unit in the Raleigh Central Office at 919-733-6893. A written authorization from DWQ MUST be received prior to any construction activities in the riparian buffer, including land clearing. Failure to secure a Buffer Authorization prior to construction &/or land clearing shall subject the property owner & the party (contractor) performing the construction &/or land clearing to a civil penalty of up to $25,000 per day per violation. ❑ Minimize removal of woody vegetation in Zone 1 to what MUST be removed for the installation of the shoreline stabilization project. Zone 1 begins at the most landward of either the waters edge or the coastal wetland line and extends 30 feet landward. Unnecessary clearing is a violation of the riparian buffer rules and may result in a civil penalty assessment of up to $25,000 per day per violation. ❑ The property owner is responsible for site restoration of woody vegetation. Pre -project site conditions MUST be re-established. A site that was wooded prior to this shoreline stabilization project MUST be restored with native hardwood trees at a stem density of 320 trees per acre. Hardwood restoration must be completed by the first subsequent planting season (November 1 through March 30). ❑ Disturbance in Zone 2 of the riparian buffer, which begins at the landward edge of Zone 1 and extends 20 feet is restricted to uses listed under 15A NCAC 2B .0233(4)(b) & (6), and 15A NCAC 2B.0259(4)(b) & (6). Clearing and grading of Zone 2 is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused flow of storm water runoff through Zone 1. North Carolina Division of Water Quality Internet: www.ncwaterquality.ore One 943 Washington Square Mall Phone: 252-946-6481 NOrthCarohna Washington, NC 27889 FAX 252-946-9215 Naturally An Equal Opportunity/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper o For vertical shoreline stabilization projects (bulkhead) only; sites where wave overwash is expected to be severe, the first ten (10) feet landward from the structure may be maintained as a stable lawn in order to provide for structural stability. This certificate condition is intended to apply only to projects adjacent to larger water bodies where the conditions may routinely produce severe overwash. ❑ Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored, see the first condition of this authorization. ❑ When restoration is required Please submit a project map of your property indicating the area to be restored, and a restoration plan. The DWQ website (Helpful links), http://h2o.enr.state.nc.us/ncwetlands/RiparianBufferRules.htm may be helpful in the preparation of the restoration plan. This Buffer Authorization is not considered approved until the DWQ has received both this signed form AND the project map. Submit the requested information to: Division of Water Quality Attn: Surface Water/Buffer Program 943 Washington Square Mall Washington, NC 27889 By your signature below you agree to be held responsible for meeting ALL of the above listed conditions and verify that all information is complete and accurate. Only the property owner is responsible for the second condition. Please be aware, violations of the above -listed conditions are subject to civil penalty assessment of up to twenty-five thousand dollars ($25,000) per violation per day. Appucant/Agen CAMA General Permit Number: a3 C North Carolina Division of Water Quality Internet: www.ncwaterguali!y.org 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper Date NorthCarolina LARRY G ARNOLD SR �43rJ DBA LG ARNOLD DOCKS & SEAWALLS PH.252-726-3018 a 66-112/531 2779 MILL CREEK NEW NEWPORT, NC 2857570-60113. Ar 44, 1 ro Al R f�. f*; BRANCHBANKING AND TRUST COMPANY 14DpBANK BBT BBT.com 0531011 211:0005 2957913 159ll'01 5 1r MONITORING & COMPLETION REPORT [LAMA Major Development & State Dredge & Fill Permits] PERMITTEE'S NAME:��Mc� L O Sf'. PERMIT # Q�= srMI� LOCATION: FIELD REP. lei MONITORED BY �- PHONE: �o 30f g DATE REPORTEDLY COMPLETE: DATE OF INSPECTION [ 1) Do the asured dimensions of the development differ from those indicated in the permit and workplat? YES CO circle one]. nn t , i N 1' l // COMMENT: 2) SEDIMENTATION & EROSION CONTROL: Has Permittee seeded, grassed, or otherwise stabilized all disturbed areas? YES O circle one] 3) COMMENT: FUTURE MO RING & ENFORCEMENT ACTION needed? YE /NO circle one]. _r v0 1 COMMENT: Piet � S r,0n ,3W) Is further investigation or enforcement action s-,