Loading...
HomeMy WebLinkAbout55361_VEASY, CHRIS_20100504„{'�i,i�'i,i':•'R.+fYF•�.lG^LKe"}*,b,�,',-,�-..' ��//V� CAMA'•4t�.F.x��.�- I ❑ DREDGE &FILL ►` ? ,GENERALPERMITPrevious Y'-/ permit #J_New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC O Rues attached. Applicant Name (f i " ° Project Location: County f ; ;' ` CG Address Street Address/ State Road/ Lot #(s) City i iV7 State ZIP.; Phone # ( ) , -()C? `C Fax # (`�}--�---- - ""' ! Subdivision = �^ Authorized Agent; - t : ar: G* City k. 1 t-% ZIP �1f ❑ Cw [IEW A -PTA ❑ ES ❑ PTS Phone # (_ ) --' River Basin Affected AEC s : ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A Adj. Wtr. Body 6lc-- .. naman /unkn) ❑ PWS: ❑FC: i ems. ✓ ORW: yes / no PNA yes / no Crit.Hab. ---' Closest Maj. Wtr. Body T - - yes /, no Type of Project/ Activity i Q V Q (� i ol� Pier (dock) length Platform(s) Finger pier(s) Groin length number ! Bulkhead/ Riprap length 1 avg distance offshore —! max distance offshore _ -_- Basin, channel cubic yards Boat ramp Boathouse/ Boatlift Beach Bulldozing Other Shon SAV: Sandl Morz Phot, Waiv j� A building permit may be required by: 1. li Notes/ Special Conditions cr (Scale: I i See note on back regarding River Basin �)(c ), E Agent`or Applicant Printed Narfie ` Permit 01 fjcers Signature _ 77 b1 Si ature ** Please read compliance statement on back of permit Issuing Daty /,/Expiration Date ti Application Fee(s) Check # Local Planning Jurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Morehead City Headquarters Mailing Address: 400 Commerce Ave 1638 Mail Service Center Morehead City, NC 28557 Raleigh, NC 27699-1638 252-808-2808/ I-888-4RCOAST Location: 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax:910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 ADJACENT RIPARIAN PROPERTY OWNER STATEMENT VL- I hereby certify that I own property adjacent to y I vl JV —h 's (Name of Property ®(vuer) property located at (Lot, Block, Rov4 etc-) on i �f 1 % '�- ' ` = cY��� , in �t rG1 ��h t�0� i11 l C c) , N.C. (Waterbady) (Town and/or County) Applicant's phone #:q 11 '551 o U I P N ailing Address: �P� t1(,i 4-- He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. WS6VV DES ON ANIOR DRAWING OF PROPOSED IDEVELO pA4F ': ` S ('n beamed & by pr'o 2 owner imposing = Pros fe-1 Low -prat' I e. �Uck. �ul��h-ectcl h bra SS U eaS (information for Property Owner. Appgyjg for Permit) Mailing Address City/State/Zip Telephone Number Signature Date (114mrian Property 01vmer Information) Signature i 4At�Te S/L- 4.7/& Telephone Number V," /-o Date ADJACENT RIPARIAN PROPERTY OWNER sTATEmwNT I hereby certify that I own property adjacent to 0-�) � I S e tq j V 's (Name of Property O ner) property located at (li,ot, Block, Road, etc-) on TIA'L'>: `i=-����� ,m'Ar hC —, po-m1ic(D ,N.C. (Waterbody) (Town and/or County) �� �/ Applicant's phone #:9 11 ' 551 � ()U I P aiping Address: q 6P`J J U 60- 4'6i - U4c l Ua, c 27 � He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. DESCRIPITON AND/OR DRAWING OF PROPOSED DEVELOpNUU": � be a WS �allea[ rraAYP�►l��`.a' ® 1✓'u�� t%fndtment} proposal "-Pra le. �� �Ucic. 3u[ I�h-�tc1 �PCO ot- EX15+ing `�v,c t- ooc 1(. (�vol / 1 -1) Ueas� (Information for Property Owner Applying (Riparian Property Owner Information) for Permit) Mailing Address City/State/Zip Telephone Number Signature Date �, l+i- Signature Print or Type Name Telephone Number t✓' Date Ad �A NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue, Governor James H. Gregson, Director Dee Freeman, Secretary Date Applicant Name n( Mailing Address Z 7 -/ 5 _v I certify that I have authorized (agent)to act on my behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to install or construct (activity) at (location) 3 .a2x This certification is valid thru (date) Signature off 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper NC Division. of Coastal Mgt. Habitat Impact Computer Sheet Applicant: Chris Veasy Date: May 4, 2010 General Permit #: 55361 C Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. TOTAL Sq. Ft. FINAL Sq. Ft. TOTAL Feet FINAL Feet (Applied for. (Anticipated final (Applied for. (Anticipated final DISTURB TYPE Disturbance total disturbance. Disturbance disturbance. Habitat Name Choose One includes any Excludes any total includes Excludes any anticipated restoration any anticipated restoration and/or restoration or and/or temp restoration or temp impact temp impacts) nt) temp impacts) amount SB Dredge ❑ Fill 0 Both ❑ Other ❑ 360 360 Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised:02/03/10 Stlf;:FER AUTHQ JZ J'J0; CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basics per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0259 & 0233. The Division of Coastal Management (DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical alternatives" determination per those regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per violation. 1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. 3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the structure may be maintained as a stable lawn in order to provide for structural stability. 5. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re- established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would remove understory vegetation is allowed. j • Pre -project site conditions: PAXG�O 6. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction corridors. This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify t II information is complete and accurate. ge or p icant Pri ed ame Permit i71C's Signature O A or A can ignature Iss e Da e CAMA GENERAL PERMIT #: ✓ "' Washington Office Morehead City Office 943 Washington Square Mall 400 Commerce Avenue OneWashington, NC 27889 Morehead City, NC 28557 NOrt1C3 0l111a Phone 252-946-6481 Phone 252-808-2808 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper NahmallY Version 5, 09/2009 B PRESCOTT MARINE CONSTRUCTION PO BOX 874 252-249-0149 ORIENTAL, NC 28571 PAY THE OR ORDER OF 1939 DATE ✓ ` T 66-30/531 472 DOLLARS ® First Citizens k. Bank Jr to tirstc'dze s.com� FOR PIPII'0 939mm i:053100300':00471202049?uw a