Loading...
HomeMy WebLinkAbout56325_STALLINGS, WADE_20100901q-Z iD l3Z' :. J FJ CAMA /' CJ DREDGE & FILL 05 GENERAL PERMIT Previous permit # ❑New ❑Modification ❑Complete Reissue [-]Partial Reissue �`Z Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources _7", ? r and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC -' ❑ Rules attached. Applicant Name Project Location: County Address City State ZIP Phone # (,) Fax # ( ) ��. Authorized Agent �! ci- ( f Affected El CW ❑ EW ❑ PTA El ES 0 PTS AEC(s): El OEA ❑ HHF ❑ 11H ❑ UBA O N/A ❑ PWS: ❑ FC: ORW: yes / no PNA yes / no Crit.Hab. yes / no Street Address/ State Road/ Lot #(s) Subdivision City ZIP Phone # O {River Basin %�r� t 1 Adj. Wtr. Body ", (nat /man /unkn) Closest Maj. Wtr. Body _ `rG��■� manBoom iEN■■■■N■■■■■ ONE■■■■■■■■■■■■■■■■■■■■■■■■■■■■■\■■■■■■ ■■■■■■■■■■■■■ ■■■■■ ■■■■■■■-- .■ ■ Imm .. on ■■■■■■■■■■■■t�eiiii■■■■■■■■■■■■■■■■■■■■■■■ ■MC■■■■■■■■■N■■MEMM■■■N■■■■■■■■■■■■■■ ■��■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ M ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■GI! ■■■■■■■■■■ ■N■■■■■■■■■■■■■■■■■■■■�■■�■N■■■■■■■■■ ■®■■■■■■■■■■.■■■■■■■■■■■■■I■■■■■■■■■■ ....■�r�■.■■w■■��■■.■■�■■■�as■■■■■■■■■■■■■■ MEMO or Applicant Printed Name Signature * Please read compliance statement on back of permit ** Application Fee(s) Check # Permit Officer's Signature' r' Issuing Date Expiration Date Local Plan ning)urisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Morehead City Headquarters Mailing Address: 400 Commerce Ave 1638 Mail Service Center Morehead City, NC 28557 Raleigh, NC 27699-1638 252-808-2808/ 1-888-4RCOAST Location: Fax: 252-247-3330 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax:910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 AGA �A NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue, Governor James H. Gregson, Director Dee Freeman, Secretary Date Z Name of Property Owner Applying for Permit: Mailing Address:: li /T<<lec,, Z NC '? '?6 0/ I certify that I have authorized (agent) A-d Al--e Y cc) ly�4 to act on my behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to install or construct (activity) ��i�� cXoc `( at (my property located at) -5`7 4 ., LIC �4 This certification is valid thru (date) Property Owner Signature �-(/,?16 Date 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX: 252-247-33301 Internet: www,nccoastaimanagement.net An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post consumer Paper ADJACENT RIPARIAN PROPERTY OWNER STATEMENT (FOR A PIER/MOORING PILINGSIBOATLIFT/BOATHOUSE) I hereby certify that I own property adjacent to 5k-kE:LT0^I-5-rAl-t_ t l LTS 's (Name of Property Owner) property located at 1 S i LIVE ©A. K (Lot, Block, Road, etc.) on 61 EU-SE J�1 JQZ- , in KENNELS ZEAC.H , N.C. (Waterbody) (Town and/or County) Applicant's phone #: Mailing Address: _ZtoQ 1 .� 6STi4l%E <fl N E M ►c.�co•e,y , �L a 8� o l He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. I understand that a pier/mooring pilings / boatlift / boathouse must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do not wish to waive ,4>V I do wish to waive that setback requirement.\ ------------------------------------------------------------- '- ------------------------------------------------ DESCRIPTION AND/OR DRAWI�F PROPOSED DEVELOPMENT: (To be filled in by in�,hal proposing development) ----------------------------------- v0- -------------- (Information for Property Own.e pplying for Permit) h 21b1 -1ST AE- Mailing Address Ka Uc-o" OU zStoo 1 City/State/Zip Telephone Number Signature Date Property Owner Information) 'Signature 717 7i - -3ylf y Print or Type Name Telephone Number Date %au d ADJACENT RIPARIAN PROPERTY OWNER STATEMENT (FOR A PIER/MOORING PILINGS/BOATLIFTIBOATIIOUSE) I hereby certify that I own property adjacent to S Ekeu Q ti �-TrtL_ t � LTS 's (Name of Property Owner) property located at 1 S -7 LIVE OA. K R1 (Lot, Block, Road, etc.) on /J E(.t S k iZ 1 t2 , in K EN N �trSAGN , N. C. (Waterbody) (Town and/or County) Applicant's phone #: Mailing Address: ZtoO 1 3 65TAU15 Gl /9 He bas described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. I understand that a pier/mooring pilings / boattift / boathouse must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do not wish to waive `",)V I do wish to waive that setback requirement/.x ------------------------------ -------------- ------- ------------------------------------------ DESCRIPTION AND/OR DRAY iF PROPOSED DEVELOPMENT: (To be filled in by in� al proposing development) \ .��/ h (Information for Property for Permit) 21aDL 31ST AUE Gi NE Mailing Address !-fit CA<-D" 2-8ceo 1 City/State/Zip Telephone Number Signature Date Property Owner Information) K T Signature Print or Type Name �2 )515y- dCAUi _gTelephone Number z zo 10 Date 9 15' riparian line ri`°/ D09f-47 00" *7O TR PRESCOTT MARINE CONSTRUCTION LLC 545 ALLIGATOR LOOP RD 252-745-7135 MERRITT, NC 28556 Pay to the � ( 1) A %� Order of l`V L-_i�'i 0"8 585 _ -le 66-30/531 Date 471 '�26d rs ref o First Citizens Bank firefcki�anCTnm ( l �. .. 1:053 1003001:0047 L 20 L946 iu' 005 Applicant: Wade Stallings Date: September 1, 2010 General Permit #: 56325C Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. TOTAL Sq. Ft. FINAL Sq. Ft. TOTAL Feet FINAL Feet (Applied for. (Anticipated final (Applied for. (Anticipated final DISTURB TYPE Disturbance total disturbance. Disturbance disturbance. Habitat Name Choose One includes any Excludes any total includes Excludes any anticipated restoration any anticipated restoration and/or restoration or and/or temp restoration or temp impact temp impacts) impact amount) temp impacts) amount OW Dredge ❑ Fill ❑ Both ❑ Other ® 650 650 Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ BUFFER AUTHORIZATION CERTIFICATE FOR PIER AND DOCKING FACILITIES ACCESS WAY A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico & Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0233 & .0259. The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical alternatives" determination per those regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per violation. 1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way. This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the conditions list above an verify that all information provided is complete and accurate. "-7 ant Signature CAMA GENERAL PERMIT #: 9�11� G Washington Office Morehead City Office 943 Washington Square Mall 400 Commerce Avenue Washington, NC 27889 Morehead City, NC 28557 Phone252-946-6481 Phone 252-808-2808 Permit Officer's Signature Issue Date Version 5, 0912009 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper Barrett, Lowana From: Connell, Brad Sent: Monday, September 27, 2010 3:13 PM To: Barrett, Lowana Subject: GP 56325C changes �- or Mrs. Barrett, Can you please change the pier length to 90' (instead of 70') and the platform width to 20' (instead of 30')? Brad E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties.