Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
56073_SPRAGUE, JOHN_20100708
51 CArVA / D DREDGE & FILL GONERAL PERMIT [-]New LIModification LIComplete Reissue ilict 110 16,6 Previous permit # El Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC : F� Rules attached. Applicant Name r (A � I A .11 'r b( b( Address, Vl-,LY ��Mee--f City State ZIP Phone # Fax ir Authorized Agent [ � L.L1 V '� L, I Affected El Cw El EW k PTA El ES El PTS AEC(s): Ll OEA El HHF El 1H El UBA El N/A Ll PWS: 0 FC: ORW: yes / no PNA yes / no Crit.Hab. yes / no Project Location: County Street Address/ State Road/ Lot #(s) Subdivision City ZIP Phone# ( ) - River Basin Adj. Wtr. Body- t\ t Vi (nat /man unkn) Closest Maj. Wtr. Body mc U Type of Project/ Activity I f J)n (Scale: Pier (dock) length Platform(s) Finger pier(s) TP; Groin length number 01 Bulkhead/ Riprap length avg distance offshore 41 max distance offshore Basin, channel I I A I z+ T T 711 1 1 1 cubic yards Boat ramp LI V Vly A 11 1 1'YY 0 1 Boathouse/ Boatlift- 77-1 Beach Bulldozing Other 'Y �--r Shoreline Length SAV: not sure yes no Sandbags: not sure yes no Moratorium: n/a yes no Photos: yes no Waiver Attached: yes no A building permit may be required by: See note on back regarding River Basin rules. Notes/ Special Conditions A-/ Agent or Applicant Printed Nani� I Signature ** Please read compliance statement on back of permit ** Application Fee(s) Check # PermitOffi r 's S' nature -7 Issuing Pate Exp#ion Date Local PlanningJuriscliction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that I) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certifythatthis project is consistentwith the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules 7711 Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Morehead City Headquarters Mailing Address: 400 Commerce Ave 1638 Mail Service Center Morehead City, NC 28557 Raleigh, NC 27699-1638 252-808-2808/ 1-888ARCOAST Location: Fax: 252-247-3330 2728 Capital Blvd. (Serves: Carteret, Craven, Onslow -above Raleigh, NC 27604 New River Inlet- and Pamlico Counties) 919-733-2293 Fax:919-733-1495 Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 9 10-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 NCDWR- North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor James H. Gregson, Director Mbm G. Ross Jr., Secretary Date Applicant Name �� J C C� P - Mailing Address I?SOVjb `f ` C C'.h 00 r, I certify that I have authorized (agent) r O a 5 frLA -b o r-N to act on my behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to install or construct (activity) L%l K1`�+ I►1� r i D r-a it 15 eckA Ct-� at (location) (4 Ear + FYu cN+ � ��4 U � � NC 6 5C10 This certification is valid tl (da Signature .! 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX 252-247-33301 Internet www rmoastalmanagemertt-net An Equal Opportu * 1 Mmwfiwe Adios Employer-50% Recycled 110%Post Coturaner Paper CERTIFIED MAIL — RETURN RECEIPT REQUESTED DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM Name of individual applying for the permit: Sok n Address of property: 5 A tom+ Fror -l+ (Lot or street#, street of road) Neap s n NC ab5(oc: Cca'erg (City & county) I hereby certify that I own property adjacent to the above referenced property. The individual applying for this permit has described to me (as shown on the attached drawing) the development they are proposing. A description or drawing, with dimensio os, should be provided with this letter. I have no objections to this proposal If you have objections to what is being proposed, please write the Division of Coastal Management, 400 Commerce Ave., Morehead City, NC 28557 or call (252) 808-2808 within 10 days of receipt of the notice. No response is considered the same as no objection if you have been notified by Certified Mail. Waiver Section I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift or sandbags must be set back a minimum distance of 15' From my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) -I do wish to waive the 15' setback requirement �/ I do not wish to waive the 15' setback requirement /O Signat re ate Print Nam Telephone number with area code CERTIFIED MAIL - RETURN RECEIPT REQUESTED DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATIONIWAIVER FORM Name of individual applying for the permit: S© h fN J,-�:> rCLC.1j l_2� Address of property: P-"'t' Eckt - FjrUr-%+ (Lot or street#, street of road) New ey-�rr) , i G 2-B L-5(o Q (City A County) I hereby certify that I own property adjacent to the above referenced property. The individual applying for this permit has described to me (as shown on the attached drawing) the development they are proposing. A description or drawing, with dimensions, should be provided with this letter. ✓ I have no objections to this proposal If you have objections to what is being proposed, please write the Division of Coastal Management, 400 Commerce Ave., Morehead City, NC 28557 or call (252) 808-2808 within 10 days of receipt of the notice. No response is considered the same as no objection if you have been notified by Certified Mail. Waiver Section I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift or sandbags must be set back a minimum distance of 15' From my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement I do not wish to waive the 15' setback requirement Signature date (2aV 6 �,ne- A . Sim , ( h Print Name 130/ Telephone number with area code BOBBY CAHOON MARINE CONSTRUCTION AND LAND DEVELOPMENT DBA BOBBY CAHOON CONSTRUCTION, INC. 6003 NEUSE RD. GRANTSBORO, NC 28529 PH (252) 249-1617 PAY TO THE ORDER OF 1 , WACHOVIA BANK, NA BAYBORO, NC 28515 66-21 /530 DOLLARS , cc 3 6: _ cL- 0008 5 L 91I• I:O S 3000 2 L 91: 20000 1 7 68 48 2811' %Y NC Division of Coastal Mgt. Habitat Impact Computer Sheet Applicant: John Sprague Date: July 8, 2010 General Permit #: 56073C Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. TOTAL Sq. Ft. FINAL Sq. Ft. TOTAL Feet FINAL Feet (Applied for. (Anticipated final (Applied for. (Anticipated final DISTURB TYPE Disturbance total disturbance. Disturbance disturbance. Habitat Name Choose One includes any Excludes any total includes Excludes any anticipated restoration any anticipated restoration and/or restoration or and/or temp restoration or temp impact temp impacts) impact amount) temp impacts amount SIB Dredge ❑ Fill ® Both ❑ Other ❑ 1,200 1,200 Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-808-2808 :: 1-888-4RCOA8T :: www.nccoastalm7,ragement.net revised:02/03/10 Ai NCDENR Ivr•Ci� ..�rjliJi?�1C1 _Jega lilra; it a i.rnvir'on t!e,m aiil i i•rsion f __'oastai iMansgemisrlt sever l,r -ave`= DeIY :, , af71 s H. r?g Dil Governor Director BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0259 & 0233. The Division of Coastal Management (DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical alternatives" determination per those regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction &/or land clearing to a civil penalty of up to $25,000 per day per violation. 1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. 3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the structure may be maintained as a stable lawn in order to provide for structural stability. 5. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re- established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would remove understory vegetation is allowed. r t i it • Pre -project site conditions: ( aGtiPn 'V (,�-I P � A 6. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction corridors. This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the above listed con iti s and verify X a I information is complete and accurate. tqnor Appli an IPri ted Name Permit Pfflcrls Signature g n, or Applicant Signature Issue/Dat CAMA GENERAL PERMIT #: �(� �� C �C Washington Office Morehead City Office 943 Washington Square Mall 400 Commerce Avenue �lle Washington, NC 27889 Morehead City, NC 28557 AT n Phone 252-946-6481 Phone 252-808-2808 NorthCarolina 1� An Equal Opportunity/Affirmative Action Employer - 50% Recycledl10% Post Consumer Paper �/ Y �l halaliif Version 5, 09/2009