HomeMy WebLinkAbout56074_SMITH, CAROLINE_20100708W❑CAMA / ❑DREDGE &FILL �U JIB --L �,
GtNEFIAL PERMIT Previous permit #
l:]New ❑Modification ❑Complete Reissue ❑Partial Reissue /./1 Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC
['Rules attached.
Applicant Name �` (` (\ z -,
Project Location: County ;f .0
Address. Street Address/ State Road/ Lot #(s)
t L
i Cty --
t'. ; f1 State '( ZIP
i
P } --
Phone # O Fax # O Subdivision
Authorized Agent C)r`i'` City ZIP
Affected ❑ Cw ❑ EW ❑ PTA ❑ ES ❑ PTS Phone # ( ) ' " River Basin ?.,A =:C'
AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A Adj. Wtr. Body (nat /man /unkn)
❑ PWS: ETC:
ORW: yes / no PNA yes / no Crit.Hab. yes / no
Closest Maj. Wtr. Body
-
■PI��■■fir■■■iivY��i■.■���
:��
...
.
■E■:®■...
■■■�■■■■■M■■■■■■■■
TIME
■■■..■■
■■M■■■■■■■EM
.®10011■■
_
■.■
■■■■■■■■■W.,.TEI.■■■.
.�i
-
■
■■■■■■■■■SWIN
ll+
■■
ENEVA-9■■■
■.
.■�■■■■
■nl�ii■■■■■■■11051�
■■
■■■®■■■I■■■f8■■■®
WENIM
slrlmmi�N
MEN
■
=
LM■■#,.
■��
T
■®■■■■®■um
EMEME■
1 ■■
i
Agent or Applicant Printed Naniie /
Signature ** Please read compliance statement on back of perm'
Application Fee(s) Check #
Permit Office 's Sign t�ure ,
Issuing Date Exp ration Date
Apw 70
Local Plan nin g urisdiction Rover File Name
M
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certifythat this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office Morehead City Headquarters
Mailing Address: 400 Commerce Ave
1638 Mail Service Center Morehead City, NC 28557
Raleigh, NC 27699-1638 252-808-2808/ 1-888ARCOAST
Location: Fax: 252-247-3330
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax:919-733-1495
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Elizabeth Citv District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax:252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax: 910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 08/09/06
MODEM
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
duel F. Easley. Govemor James H. Cregson, Director Witriam G. Ross jr, Secretary
M
Date
�'C� ���ine Fmk'
Applicant Name l } �j-
Mailing Address 2 -�—
nt) b tOLL �-'n�Oon
I certify���T `� to act on my
that I have authorized (age
behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to
install or construct (activity) iXL l r -1�� 1
at (location) 2 F-Q
n )
This certification is valid thru (date)
Signaturet���-����'y"
400 Commerce Avenue, Morehead Cif}+, North Carolina 28557
Phone. 252-808-2808 \ FAX 252-247-M \ intemet www.nowastakonagementnet
An Equal opp tmay 1 Affinrnfnre Action Employer-50% RegjcW 11o% Post coresc w Paper
CERTIFIED MAII, - RETURN RECEIPT REQUESTED
DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER
FORM
Name of individual applying for the permit: �(Li'O t �`l� IY1►
Address of property: �5 1 2- �OIeeti
(Lot or streetli, street of road)
Kew NC, ?_R5(n D
(City & County)
I hereby certify that I own property adjacent to the above referenced property. The
individual applying for this permit has described to me (as shown on the attached
drawing) the development they are proposing. A description or drawing, with
dimensions, should be provided with this letter.
I have no objections to this proposal
If you have objections to what is being proposed, please write the Division of Coastal
Management, 400 Commerce Ave., Morehead City, NC 28557 or call (252) 808-2808
within 10 days of receipt of the notice. No response is considered the same as no
objection if you have been notified by Certified Mail.
Waiver Section
I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift or
sandbags must be set back a minimum distance of 15' From my area of riparian
access unless waived by me. (If you wish to waive the setback, you must initial the
appropriate blank below.)
I do wish to waive the 15' setback requirement
I do not wish to waive the 15' setback requirement
Signa re Elate
L
Print 14ame
Telephone number with area code
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER
FORM
Name of individual applying for the permit:
Address of property: 1`��V' OYI� l_e
(Lot or street#, street of road)
'N4.w -Bey L 2-8-566
(City & County)
I hereby certify that I own property adjacent to the above referenced property. The
individual applying for this permit has described to me (as shown on the attached
drawing) the development they are proposing. A description or drawing, with
dimensions, should be provided with this letter. RZ `,!L � Q'yd -/N�
I have no objections to this proposal
If you have objections to what is being proposed, please write the Division of Coastal
Management, 400 Commerce Ave., Morehead City, NC 28557 or call (252) 808-2808
within 10 days of receipt of the notice. No response is considered the same as no
objection if you have been notified by Certified Mail.
Waiver Section
I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift or
sandbags must be set back a minimum distance of 15' From my area of riparian
access unless waived by me. (If you wish to waive the setback, you must initial the
appropriate blank below.)
)—c I do wish to waive the 15' setback requirement
I do not wish to waive the 15' setback requirement
Signate
Pr nt Name % / 9
Telephone number with area code
BOBBY CAHOON
MARINE CONSTRUCTION AND LAND DEVELOPMENT
DBA BOBBY CAHOON CONSTRUCTION, INC.
6003 NEUSE RD.
GRANTSBORO, NC 28529
PH ((2252) 249-1617
PAY TO THE N) j� ���///.NR
ORDER OF
bob
WACHOVIA BANK, NA
BAYBORO, NC 28515
66-21/530
8519
` yIC�
DOLLARS
%ace
Ll
111008 S L 91I• 1:0S 3000 2 L 91: 20000 L 7 68 48 281I•
:r
MC Division of Coastal Mgt. Habitat Impact Computer Sheet
Applicant: Caroline Smith
Date: July 8, 2010
General Permit #: 56074C
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
TOTAL Sq. Ft.
FINAL Sq. Ft.
TOTAL Feet
FINAL Feet
(Applied for.
(Anticipated final
(Applied for.
(Anticipated final
DISTURB TYPE
Disturbance total
disturbance.
Disturbance
disturbance.
Habitat Name
Choose One
includes any
Excludes any
total includes
Excludes any
anticipated
restoration
any anticipated
restoration and/or
restoration or
and/or temp
restoration or
temp impact
temp impacts)
impact amount)
temp impacts
amount
SB
Dredge ❑ Fill ® Both ❑ Other ❑
2,500
2,500
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised:02/03/10
YXI
NCDENRI
..irif . imCi Jl 4Cil ll iri ll. (J� E-nvIf',.-)nmei'' i.i'N.j
! r/isicn f :', astal ;ylanayernen'L
„s J12LjsOri
(,ovPrnrr oirecfrr '`-na ar.
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins
per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0259 & 0233. The Division of Coastal Management
(DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project
proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practicai
alternatives" determination per those regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as
long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply
with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor
land clearing to a civil penalty of up to $25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either
the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be
impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the
buffer is a violation of the riparian buffer rules.
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
5. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per
acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re-
established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would
remove understory vegetation is allowed. . r i
• Pre -project site conditions: ��(iA�'PJ �I ti 6k
6. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and
construction corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed con iti s and verify I
information is complete and accurate. t
Ag n or Appli an Pri ted Name Permit ffic is Signature
!!tnlor Applicant Signature r, Issue at
CAMA GENERAL PERMIT #: tJ�O7 (/� C ip�J73C,
Washington Office Morehead City Office
943 Washington Square Mall 400 Commerce Avenue One
Washington, NC 27889 Morehead City, NC 28557 1NorthC r '
Phone 252-946-6481 Phone 252-808-2808
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper vr dhfll i
Version 5, 09/2009
77
_ CDEN
�`I•-il:!' .Jr';�JIfTjC� 'J��41IUi��'i"1. t � \ � 1
ivisioii : 1 Coastal iVlanagamcr,t
Governor )ir2,acr
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins
per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0259 & 0233. The Division of Coastal Management
(DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project
proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical
alternatives" determination per those regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as
long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply
with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor
land clearing to a civil penalty of up to $25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either
the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be
impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the
buffer is a violation of the riparian buffer rules.
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
5. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per
acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re-
established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would
remove understory vegetation is allowed. r, r i I
• Pre -project site conditions: (a v I e\ S,6200 -1(1,
6. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and
construction corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed con iti s and verify a I
information is complete and accurate.
tor Appli an /Pri ted Name Permit ffic is Signature
A' i I 1
g I or Applicant Signature Issue,/Dat
7
.l-
CAMA GENERAL PERMIT #:- % / �' '�C
Washington Office Morehead City Office
943 Washington Square Mall 400 Coinmerce Avenue One7 i
Washington, NC 27889 Morehead City, NC 28557 NorthC3iOltra
Phone 252-946-6481 Phone 252-808-2808
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper Nor AUVI&
Version 5, 09/2009