Loading...
HomeMy WebLinkAbout55016_SIMPSON, CHARLES_2009120242 a2 -CF1 � ❑CAMA / El DREDGE & FILL ENERAL PERMIT t Previous # ermit p i ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC E4Rules attached. Applicant NamI e { f?<7-71 r" %f ' 1 - Project Location: County Address `� ` iY\ Street Address/ State Road/ Lot # s City Q_-W !) State ZIP Phone # () ' Fax # (� Subdivision Authorized Agent S" { t `f {j ► L to ((j` ` j C City ZIP Affected ❑ CW ElEW El PTA ilk-- PTS Phone # River Basin /� { ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A AEC(s): Adj. Wtr. Body T �= '} - f 4?11 Q�I].�t- nan /unkn) ❑ PWS: ❑FC: / r.- K` , P ORW: yes / no PNA yes / no Crit.Hab. yes /' no Closest Mal. Wtr. Body f Type of Project/ Activity (Scale: C 1 Q/ ?& ) Pier (dock) length Platform(s) Finger pier(s) Groin length — number --- Bulkhead/ Riprap length 1 _ avg distance offshore max distance offshore__( I —. Basin, channel—' — cubic yards Boat ramp Boathouse/ Boatlift— Beach Bulldozing Other Shoreline Length (% X� _ / J �1 J ln� �` { ` 6 SAV: not sure yes no; Sandbags: not sure yes no Moratorium: n/a yes no I Photos: yes no Waiver Attached: yes --- - l i'r 1 A building permit may be required by: �6 1 See note on back regarding River Notes/ Special Conditionsilk --I �;'; P V o ; Pry - ��P C/ �� r -� i o !) Agent or Applicant Printed Name Signature ** Pleas read compliance statement on backof permit I6r71�t Application Fee(s) Check # f/t1 rules:— C,��yy, Issuing Date ,,� Exoirati rfDate 1,11 1 (?a Ifs Local Planning Jurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax:910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 i North Carolina Department of Environment & Natural Resources Division of Coastal Management James Gregson, Director Beverly Eaves Perdue, Governor Date lb —/9-0 I Applicant Name eln �e s 4 Kew e e, :�i so✓\ Mailing Address � Nam, e William G. Ross, Secretary I certify that I have authorized (agent) _ F•65C>^ - rd �e:�V co V-s+ to act on my behalf, for purpose of applying for and obtaining all CAMA Permits necessary to install or construct (activity) I�c�1kc� r��o�uce�^ei�� ,at(location)_ �a� T�'a+� Ipy� �'�-� ga-"n This certification is valid thru (date) Signature 400 Commerce Ave. Morehead City, North Carolina 28557 Phone 252-828-2808/ Fax 252-247-3330 Internet: www.nccoastalmanai!ement.net An Equal Opportunity/Affirmative Action Employer-50% Recycled/10% Post Consumer Paper ADJ ; .NT RIPARIAN PROPERTY, OWNER STATEMENT (FOR A ' RIMOORING PILINGSIBOAT UMBOATIIOUSE) I hereby certify that I own property adjacent tor- 9661644 0F,1Vcx S v.'s (Nitme of property o ner) property, located at '�Q �% .�S /' (Lot, block, road, etc.) one rp —iz�,416r , in Gl�i•� �- L° %Ld� N.C. (Water body) (TowWand/© county) He has described to me, as shown below, the ;development he is proposing at that location, and, I have no objections to his proposal. I understand that a pier/mooring pilings/boatlift/boathouse must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless waived by me. I do not wish to waive the setback requirement. I do wish to waive that setback requirement. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT: (to be filled. in by individual Proposing deve Vment) ' Y-How, a rI Q 1,4 o /,✓� IMF e Foley &Foley Contractors, Inc. Phone#: (252) 636-2515 Signature Fax#: (252) 636-3127 --16-2009 01: EAN 1-WM: I-ULEY&FULEY e�db-wlc: f : U: b-'ti 5b7J AMA rf =NTMPARIAN PRTY OWNER MTEA I haceby cQtiTy tit T ow►11 apett�► adjecemt m '{;j,� - S." aQ 'e (i dAwei prop" 0 property locawd (I.at, block, Y"dq etc.) cra.._..L_ . N.C.■. ._..-.__�I■ �rii. r�/�r.A. `I r rr. ��Miirr��,T (Water body) Mom-andio eoaaty) Hs has dcocnbCd to me, as shown below, the Aevelopmat he is proMsiag at *t location, and, I have no objwdew tia his praposal. Y under t nd that a pier/mooring piluW)boR Wbaagw = mug be ad back a minimum distance of MOM feet (15') from my area oftipuien soon unless waived byma. I do nd wish-W waive the Eck t+ gWXromt. I do wi* to waiva that setbeok vgWM M DESCHIMON ANDIOR lPRAVVM OF PROPOWD DZVRWF'AI NT; (to bi Wed Pi by huVvtda[pvpoft d+ev�.nt) Qx cX ! tDwJ,-:� /"a /1-F Foley & Foley Cow, Ina, Phone#: (252) 636-2515 Rat#: {252) 636-3127 prim or Type Dame Te+lophonc N=bcr and Date rm-"-q r 7nn I •n,i . �� µ �r� .. - artEK ry Serial Number - Year• Ni"onYh, 'a U.S. Dollars and Cents 16871362356 D)-4-12-0 LIEF -� � n 00 `� ✓L�, l I'`J 1--� -�'f � :�.. '...... Amount EIGHT HUNDRED DOLLARS:& 00� - '� # Pay to nn 66 Clerk — AddressLlW C�rnmeva: Ala -- __— From �U!✓; �Jv1fY 1l�Yj i��Cr � Address � �y J P L# Aw-p,) e ! �Z __++ Memor.�i�iri?�tr�# PCJGra`v r W 2008 u,iteh SwA PaslAl Se,p .All Rght Reserved -SEE REVERSE WARNING NEGOTIABLE ONLY IN THE U.S. AND POSSESSIONS 1:00000800 21: L 36 2 3 56112 MINOR 1111 ., ..;, BUFFER Au"rHORIZATION CERTIFICATE FOR SHORELINE STAMLIZATION A. riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico , Neuse River basins per Division of Water Quality (DWQ) regulations 15A NCA.0 02B.0259 & 0233. The Division of Coastal Management (DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical alternatives" determination per those regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per violation. 1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. 3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the structure may be maintained as a stable lawn in order to provide for structural stability. 5. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re- established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would remove understory vegetation is allowed. • Pre -project site conditions: it ►'i l c_ut�eJ /avll n W c1SSC S 6. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction corridors. This drawing will be used to aid in compliance and monitoring effortsa��ify By your signature below you agree to be held responsible for meeting all of the above listed conditiall information is complete and accurate. M► Ke1�I IY/ Age or Applicant Printe Name Permit Offi er's•Signature �n Agen or Applic nature Issue Dat6 CAMA GENERAL PERMIT #: Washington Office 943 Washington Square Mall Washington, NC 27889 Phone 252-946-6481 Morehead City Office 400 Commerce Avenue Morehead City, NC 28557 Phone 252-808-2808 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper Version 5, 09/2009 One Noit 1Carolina Naturally