Loading...
HomeMy WebLinkAboutGeneral Permits (2750)O Applicant Name Address 3t City _ Project location CERTIFICATION OF EXEMPTION FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203. State Road, Water Body, etc.)_ _ 2^ n�. _ :9 State Phone Number cI t 1-i Zip Type and Dimensions of Project c The proposed project to be located and constructed as described above is hereby certified as exempt from the CAMA permit re- quirement pursuant to 15 NCAC 7K .0203. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal, or Local authorization. C This cc-rtification of exemption from requiring a CAMA permit is valid for 90 days from the date of issuance. Following expiration, a re-examination of the project and project site may be necessary to continue this certification. SKETCH (SCALE: Tic t.'Try ,,J f v n C; r r �• , r Any person who proceeds with a development without the con- sent of a CAMA official under the mistaken assumption that the development is exempted, will be in violation of the CAMA if there is a subsequent determination that a permit was required for the development. The applicant certifies by signing this exemption that (1) the ap- plicant has read and will abide by the conditions of this exemp- tion, and (2) a-writtenTStatenleAt-hasbesa.obtRft ed-from-adjat;ent tandGwners-rurtifyittg—tfrat—t-hey-have no-- objections— to_.1he__ prepesed-wark. Applicant's signature' � sue. -�� CAMA Off icia' signature 1 Je Issuing atpe !/ ?_7 Expiratiod dat Attachment: 15 North Carolina Administrative Code 7K .0203 NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue, Governor James H. Gregson, Director Dee Freeman, Secretary September 7, 2010 Helen Frazier 3020 Devonshire Dr. Raleigh, NC 27607 Dear Ms. Frazier: Attached is a Certification of Exemption in order to validate this, please sign the Exemption as indicated. Retain the yellow copy for your files and return the signed green and blue copies to us in the enclosed, self-addressed envelope. If the signed permit copies are not returned to this office before the initiation of development, you will be working without authorization and will be subject to a Notice of Violation and subsequent civil penalties. We appreciate your early attention to this matter. Sincerely, 6:c Barry Guthrie Coastal Management Representative lsb Enclosures 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: www.nccoastalmanagement.net An Equal Opportunity \ Affirmative Action Employer — 50% Recycled \ 10% Post Consumer Paper Beverly Eaves Perdue Governor i4CDENR I'.aort^ Carolina Department of Environment and i.\laiural R\escurces Division or Coastal Management James H. Gregson Director BUFFER AUTHORIZATION CERTIFICATE FOR PIER AND DOCKING FACILITIES ACCESS WAY Dee Freeman Secretanj A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico & Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 028.0233 & .0259. The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical alternatives" determination per those regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per violation. 1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way. This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the conditions listed above and verify that all information provided is complete and accurate. A Agen r Applicant Signature CAMA GENERAL PERMIT #: Washington Office Morehead City Office 943 Washington Square Mall 400 Commerce Avenue Washington, NC 27889 Morehead City, NC 28557 Phone 252-946-6481 Phone 252-808-2808 Permit Offiber's Signature 61, )( Issue Dat An Equal Opportunity/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper Version 5, 09/2009