HomeMy WebLinkAboutGeneral Permits (2750)O
Applicant Name
Address 3t
City _
Project location
CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203.
State Road, Water Body, etc.)_ _
2^ n�. _ :9
State
Phone Number cI t 1-i
Zip
Type and Dimensions of Project c
The proposed project to be located and constructed as described
above is hereby certified as exempt from the CAMA permit re-
quirement pursuant to 15 NCAC 7K .0203. This exemption to
CAMA permit requirements does not alleviate the necessity of
your obtaining any other State, Federal, or Local authorization.
C
This cc-rtification of exemption from requiring a CAMA permit is
valid for 90 days from the date of issuance. Following expiration,
a re-examination of the project and project site may be necessary
to continue this certification.
SKETCH (SCALE:
Tic
t.'Try
,,J f v n C; r r �• ,
r
Any person who proceeds with a development without the con-
sent of a CAMA official under the mistaken assumption that the
development is exempted, will be in violation of the CAMA if there
is a subsequent determination that a permit was required for the
development.
The applicant certifies by signing this exemption that (1) the ap-
plicant has read and will abide by the conditions of this exemp-
tion, and (2) a-writtenTStatenleAt-hasbesa.obtRft ed-from-adjat;ent
tandGwners-rurtifyittg—tfrat—t-hey-have no-- objections— to_.1he__
prepesed-wark.
Applicant's signature' �
sue. -��
CAMA Off icia' signature
1 Je
Issuing atpe
!/
?_7
Expiratiod dat
Attachment: 15 North Carolina Administrative Code 7K .0203
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Beverly Eaves Perdue, Governor James H. Gregson, Director Dee Freeman, Secretary
September 7, 2010
Helen Frazier
3020 Devonshire Dr.
Raleigh, NC 27607
Dear Ms. Frazier:
Attached is a Certification of Exemption in order to validate this, please sign the Exemption as
indicated. Retain the yellow copy for your files and return the signed green and blue copies
to us in the enclosed, self-addressed envelope. If the signed permit copies are not returned to this
office before the initiation of development, you will be working without authorization and will
be subject to a Notice of Violation and subsequent civil penalties.
We appreciate your early attention to this matter.
Sincerely,
6:c
Barry Guthrie
Coastal Management Representative
lsb
Enclosures
400 Commerce Avenue, Morehead City, North Carolina 28557
Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: www.nccoastalmanagement.net
An Equal Opportunity \ Affirmative Action Employer — 50% Recycled \ 10% Post Consumer Paper
Beverly Eaves Perdue
Governor
i4CDENR
I'.aort^ Carolina Department of Environment and i.\laiural R\escurces
Division or Coastal Management
James H. Gregson
Director
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
Dee Freeman
Secretanj
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico &
Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 028.0233 & .0259.
The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of
Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies
with the aforementioned regulations, and made a "no practical alternatives" determination per those
regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer
Authorization as long as the project is constructed in a manner that continues to meet all of the conditions
listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party
(contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per
violation.
1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM.
The alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of
pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules
to the maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way.
This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the conditions listed above and
verify that all information provided is complete and accurate. A
Agen r Applicant Signature
CAMA GENERAL PERMIT #:
Washington Office Morehead City Office
943 Washington Square Mall 400 Commerce Avenue
Washington, NC 27889 Morehead City, NC 28557
Phone 252-946-6481 Phone 252-808-2808
Permit Offiber's Signature
61, )(
Issue Dat
An Equal Opportunity/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper
Version 5, 09/2009