HomeMy WebLinkAbout51233_ROBERTSON, WILLIAM_20070320Z3_V
��
❑CAMA / ❑DREDGE &FILL �14
`�� 5 � 3
G E N E RAC.. PERMIT � Previous permit #
❑New ❑Modification ❑Complete Reissue Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
❑ Rules attached.
Applicant Name '` ' Project Location: County
Address Street Address/ State Road/ Lot #(s)
City__ State_______ ZIP
Phone # ( ) Fax # ( ) Subdivision
Authorized Agent City ZIP
Affected ❑ CW ❑ EW ❑ PTA ❑ ES ❑ PTS Phone # ( ) River Basin
AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A Adj. Wtr. Body (nat /man /unkn)
❑ PWS: ❑ FC:
ORW: yes / no PNA yes / no Crit.Hab. yes / no Closest Maj. Wtr. Body
Type of Project/ Activity
Pier (dock) length
Platform(s)
Finger pier(s)
(Scale: )
Groin length
number
Bulkhead/ Riprap length
avg distance offshore
max distance offshore
Basin, channel
cubic yards
Boat ramp
Boathouse/ Boatlift
I
Beach Bulldozing
Other
—
Shoreline Length
SAV: not sure yes
Sandbags: not sure yes
Moratorium: n/a yes
Photos: yes
Waiver Attached: yes
A building permit may be required
Notes/ Special Conditions
no
no
no
no
no
by:
-
—
I
1
'I
fjC
,
'
r
i '
/1
''
See
note
on
back
regarding
River
Basin
rules.
Agent or Applicant Printed Name
Signature ** Please read compliance statement on back of permit **
Permit Officer's Signature
Issuing Date
Expiration Date
Application Fee(s)
Check #
Local Planning Jurisdiction
Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office Morehead City Headquarters
Mailing Address: 400 Commerce Ave
1638 Mail Service Center Morehead City, NC 28557
Raleigh, NC 27699-1638 252-808-2808/ 1-888-4RCOAST
Location: Fax: 252-247-3330
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax:919-733-1495
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax:252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax:910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 08/09/06
Frow cancer centers of nc
Feb 09 09 10:50a HOBBY 'CAHOON OSTRUCTION
02/09/2009 12:53
252-24994
#260 P.002/002
MM
NCD84R
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Wchaef F. Easley, Govemor James R Gregson, Director wiitiam G. Ross Jr, secretary
Date
Applicant Name (�(Jr��tlGtrl^1 f �r1e 1�
Mailing Address
/.1
I certify that I have authorized (agent}o C. �-�7�M to act on my
behalf, for the purpose of applying for and obtaining all �CAf MA Permits necessary to
ln% C,- (L
install or construct (activity) L, i -6U l�-L do UL ,
at (location) +` t �G C i �!� ik - .,t %G
4
This certification is valid thru (date)
Signature
400 Commerce Avenue, Mmhead City, North Carolina 28557
Phone: 252-808-28061 FAX: 252-247-33301 Internet wwwnccoastalmariagement.net
An Equal appgtunily t AfirmaUve Action Empbyer—50%Recyded d0% Past Consumer Pager
John Brucke 919-498-3221 p.l
Mar Ub U9 12:Wp BUBBY UAHUUN UUNS 1 KUU f IUN 2b2-249-9884 p.2
CERTIFIED MAIL — RETURN RECEIPT REQUESTED
DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER
FORM �)
Name of individual applying for the permit: !N' Il o?' l d[ r
Address of property: L_ lot D�
f IUPr'S LI G Ul1�tS1�11
(Lai or streesheet or road)
�JG Tin It c4.)
(City & Co®ty)
I hereby certify that I own property adjacent to the above referenced property. The
individual applying for this permit has described to me (as shown on the attached
drawing) the development they are proposing. A description or drawing, with
dim 7asions, should be provided with this letter- 6e,_- , �1Qctje-d- dam) r Ip
f I have no objections to this proposal
If you have objections to what is being proposed, please write the Division of Coastal
Management, 400 Commerce Ave., Morehead City, NC 2.8557 or call (252) 808-2808
within 10 days of receipt of the notice. No response is considered the same as no
objection if you have been notified by Certified Mail.
Waiver Section
I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift or
sandbags must be set back a minimum distance of 15' From my area of riparian
access unless waived by we (If you wish to waive the setback, you mast initial the
appropriate blank below.)
I do wish to waive the 15' setback requirement
I do not wish to waive the 15' setback requirement
S i gynature - / Date
Print Name
Telephone number with area code
• V lr / 1 • ' • ► 114► r
DIVISION OF COASTAL MANAGRMMT
ADJACENT RMARIAN PROPERTY OWNER N(YI-H CATION/WAiVER
FORM
Name of individual appb fwg for the permit:_
Address of property:
(esnr & c994e,)
I hereby certify that I own property adjoceat to the above referenced property. The
individual applying for this permit has described to me (as shown on the attached
drawing} the development they are proposing► A description or drawing, !Vitt
dimensions, should be provided with dkis letter_
— I have no objections to this proposal l�l
If you have objections to what is being Proposed, please write the Division of Cbwftl
Manageaent, 400 Commerce Ave., Nforebead City, NC 28557 or can (252) 8t18-2808
wits in 10 days of receipt of the notice. No response is omisidered the same as oa
objection ifyon have been sorted by Certified MaEL
Waiver section
I anderstasd that a pier, dock, mooring pilings, breakwater, boathouse, lift or
sandbags must be set back a minimum disianee of 157 From my area of riparian
access naless waived by me. (If you wish to waive the setback, you most iaMal the
appropriate blank below-)
/ 1 dovish to waive tha I5' setback requirement
y 1 do not wish to waive the 15' setbeck regairetnent
Signature Bate
print Name
Telephone number with area code
S,e,, w Az-L,
to q mrA j?-41 Oro-
]WIDS Mbq
;.)(V QAV4 WA-14,
,::�- "X/z CA P
a.S �sP Pvc. SkeST PILRS
\ NT's /
rabe �
❑ For vertical shoreline stabilization projects (bulkhead) only; sites where wave overwash
is expected to be severe, the first ten (10) feet landward from the structure may be
maintained as a stable lawn in order to provide for structural stability. This certificate
condition is intended to apply only to projects adjacent to larger water bodies where the
conditions may routinely produce severe overwash.
❑ Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored, see the first condition of this authorization.
o When restoration is required Please submit a project map of your property indicating the
area to be restored, and a restoration plan. The DWQ website (Helpful links),
http://h2o.enr.state.nc.us/ncwetiands/RiparianBufferRules.htm may be helpful in the
preparation of the restoration plan.
This Buffer Authorization is not considered approved until the DWQ has received both
this signed form AND the project map.
Submit the requested information to:
Division of Water Quality
Attn: Surface Water/Buffer Program
943 Washington Square Mall
Washington, NC 27889
By your signature below you agree to be held responsible for meeting ALL of the above listed
conditions and verify that all information is complete and accurate. Only the property owner is
responsible for the second condition. Please be aware, violations of the above -listed conditions
are subject to civil penalty assessment of up to twenty-five thousand dollars ($25,000) per
violation per day.
Applicant/Agent's Signature
CAMA General Permit Number:
North Carolina Division of Water Quality Internet: www.ncwaterquality.or�
943 Washington Square Mall Phone: 252-946-6481
Washington, NC 27889 FAX 252-946-9215
An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper
Date
ne
NorthCarohna
Naturally
r`
�G
Michael F. Easley, Governor
O�✓
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
>;
Coleer; H. Sullins, Director
Chuck Wakild, Deputy Director
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Tar -
Pamlico & Neuse River basins per Division of Water Quality (DWQ) regulations 15A NCAC
0213.0233 & .0259.
Activities covered by your Coastal Area Management Act (CAMA) permit are deemed to have
a Buffer Authorization from the DWQ only if the project can meet ALL of the conditions listed
below. If ALL the avoidance and minimization guidelines described below cannot be met, a
separate buffer authorization request must be submitted using a Pre -Construction Notification
(PCN) application to DWQ at the address below. A PCN application may be obtained on the
DWQ web site http://h2o.enr. state. nc. us/wetlands.html.
Questions regarding this process should be directed to wetland/buffer staff of the DWQ in the
Washington Regional Office at 252-946-6481, or the 401 Oversight Unit in the Raleigh Central
Office at 919-733-6893.
A written authorization from DWQ MUST be received prior to any construction activities in the
riparian buffer, including land clearing. Failure to secure a Buffer Authorization prior to
construction &/or land clearing shall subject the property owner & the party (contractor)
performing the construction &/or land clearing to a civil penalty of up to $25,000 per day per
violation.
❑ Minimize removal of woody vegetation in Zone 1 to what MUST be removed for the
installation of the shoreline stabilization project. Zone 1 begins at the most landward of
either the waters edge or the coastal wetland line and extends 30 feet landward.
Unnecessary clearing is a violation of the riparian buffer rules and may result in a civil
penalty assessment of up to $25,000 per day per violation.
❑ The property owner is responsible for site restoration of woody vegetation. Pre -project
site conditions MUST be re-established. A site that was wooded prior to this
shoreline stabilization project MUST be restored with native hardwood trees at a stem
density of 320 trees per acre. Hardwood restoration must be completed by the first
subsequent planting season (November 1 through March 30).
❑ Disturbance in Zone 2 of the riparian buffer, which begins at the landward edge of Zone
1 and extends 20 feet is restricted to uses listed under 15A NCAC 2B .0233(4)(b) & (6),
and 15A NCAC 2B.0259(4)(b) & (6). Clearing and grading of Zone 2 is allowed provided
that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused flow of storm water runoff through Zone 1.
North Carolina Division of Water Quality Internet: www.ncwaterquality.org One
943 Washington Square Mall Phone: 252-946-6481 NorthCarolina
Washington, NC 27889 FAX 252-946-9215 Naturally
An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper
rage
This Buffer Authorization is not considered approved until the DWQ has received both
this signed form AND the project map.
Submit the requested information to:
Division of Water Quality
Attn: Surface Water/Buffer Program
943 Washington Square Mall
Washington, NC 27889
By your signature below you agree to be held responsible for meeting ALL of the above listed
conditions and verify that all information is complete and accurate. Please be aware, violations
of the above -listed conditions are subject to civil penalty assessment of up to twenty-five
thousand dollars ($25,000.00) per violation per day.
Applicant/
CAMA General Permit Number:
North Carolina Division of Water Quality Internet: www.ncwaterqualiM grg
943 Washington Square Mall Phone: 252-946-6481
Washington, NC 27889 FAX 252-946-9215
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper
Date
NorthCarohna
Naturally
�Q
Cq r
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
y '<
Coleen"H. Sullins, Director
Chuck Wakild, Deputy Director
BUFFER AUTHORIZATION CERTIFICATE FOR PIER ACCESS
A riparian buffer authorization is required for an approved access way through the Tar -Pamlico
& Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC
02B.0233 & .0259.
Activities covered by your Coastal Area Management Act (CAMA) permit are deemed to have
a Buffer Authorization from the DWQ as long as the project can meet ALL of the conditions
listed below. If ALL of the avoidance and minimization guidelines listed below cannot be met, a
separate buffer authorization request must be submitted using a Pre -Construction Notification
(PCN) application to DWQ at the address below.
A PCN application may be obtained on the DWQ site http://h2o.enr.state.nc.us/wetlands.htm1.
Any questions regarding this process should be directed to the wetland/buffer staff of the DWQ
in the Washington Regional Office at 252-946-6481, or the 401 Oversight Unit in the Raleigh
Central Office at 919-733-6893.
A written authorization from DWQ MUST be received prior to any construction activities in the
riparian buffer, including land clearing. Failure to secure a Buffer Authorization prior to
construction &/or land clearing shall subject the property owner & the party (contractor)
performing the construction &/or land clearing to a civil penalty of up to $25,000 per day per
violation.
❑ Pier access must cross the riparian buffer perpendicularly (which is defined as between
75 and 105 degrees). The alignment should also be located to minimize the removal of
woody vegetation to the greatest extent practicable.
❑ Walkway/access shall be made of pervious materials like open -slatted wood, mulch, or
grass. The use of impervious materials like concrete, pavers, or gravel will require a
PCN review and a separate Buffer Authorization. A request for an impervious walkway
shall include a justification of need.
❑ The width of the access is limited to six (6) feet or less. A width of greater than 6 feet
wide shall require a PCN review and a separate Buffer Authorization. A request for an
access greater than 6 feet shall include a justification of need.
❑ Please submit a project map of your property indicating the location of the pier and any
requested walkway/access.
North Carolina Division of Water Quality Internet: www.ncwaterqualitx.org-
943 Washington Square Mall Phone: 252-946-6481
Washington, NC 27889 FAX 252-946-9215
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
NorthCarohna
Naturally
BOBBY CAHOON
MARINE CONSTRUCTION AND LAND DEVELOPMENT
DBA BOBBY CAHOON CONSTRUCTION, INC.
6003 NEUSE RD.
GRANTSBORO, NC 28529
PH (252) 249-1617
PAY TO THE
ORDER OF
W
WACHOVIA BANK, NA
BAYBORO, NC 28515
66-21/530
np/o65 2 1,11 I:053000 2 L91: 20000 L76848 28i'
6521
DOLLARS
> 1DVJG_L.-ti
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Chuck Wakild, Deputy Director
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Tar -
Pamlico & Neuse River basins per Division of Water Quality (DWQ) regulations 15A NCAC
02B.0233 & .0259.
Activities covered by your Coastal Area Management Act (CAMA) permit are deemed to have
a Buffer Authorization from the DWQ only if the project can meet ALL of the conditions listed
below. If ALL the avoidance and minimization guidelines described below cannot be met, a
separate buffer authorization request must be submitted using a Pre -Construction Notification
(PCN) application to DWQ at the address below. A PCN application may be obtained on the
DWQ web site http://h2o.enr.state.nc.us/wetlands.html.
Questions regarding this process should be directed to wetland/buffer staff of the DWQ in the
Washington Regional Office at 252-946-6481, or the 401 Oversight Unit in the Raleigh Central
Office at 919-733-6893.
A written authorization from DWQ MUST be received prior to any construction activities in the
riparian buffer, including land clearing. Failure to secure a Buffer Authorization prior to
construction &/or land clearing shall subject the property owner & the party (contractor)
performing the construction &/or land clearing to a civil penalty of up to $25,000 per day per
violation.
❑ Minimize removal of woody vegetation in Zone 1 to what MUST be removed for the
installation of the shoreline stabilization project. Zone 1 begins at the most landward of
either the waters edge or the coastal wetland line and extends 30 feet landward.
Unnecessary clearing is a violation of the riparian buffer rules and may result in a civil
penalty assessment of up to $25,000 per day per violation.
❑ The property owner is responsible for site restoration of woody vegetation. Pre -project
site conditions MUST be re-established. A site that was wooded prior to this
shoreline stabilization project MUST be restored with native hardwood trees at a stem
density of 320 trees per acre. Hardwood restoration must be completed by the first
subsequent planting season (November 1 through March 30).
❑ Disturbance in Zone 2 of the riparian buffer, which begins at the landward edge of Zone
1 and extends 20 feet is restricted to uses listed under 15A NCAC 2B .0233(4)(b) & (6),
and 15A NCAC 2B.0259(4)(b) & (6). Clearing and grading of Zone 2 is allowed provided
that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused flow of storm water runoff through Zone 1.
North Carolina Division of Water Quality Internet www.ncwaterquality.org- One
943 Washington Square Mall Phone: 252-946-6481 NOrthCarOhna
Washington, NC 27889 FAX 252-946-9215 Naturallff
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper
❑ For vertical shoreline stabilization projects (bulkhead) only; sites where wave overwash
is expected to be severe, the first ten (10) feet landward from the structure may be
maintained as a stable lawn in order to provide for structural stability. -This certificate
condition is intended to apply only to projects adjacent to larger water bodies where the
conditions may routinely produce severe overwash.
❑ Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored, see the first condition of this authorization.
❑ When restoration is required Please submit a project map of your property indicating the
area to be restored, and a restoration plan. The DWQ website (Helpful links),
http://h2o.enr.state.nc.us/ncwetiands/RiparianBufferRules.htm may be helpful in the
preparation of the restoration plan.
This Buffer Authorization is not considered approved until the DWQ has received both
this signed form AND the project map.
Submit the requested information to:
Division of Water Quality
Attn: Surface Water/Buffer Program
943 Washington Square Mall
Washington, NC 27889
By your signature below you agree to be held responsible for meeting ALL of the above listed
conditions and verify that all information is complete and accurate. Only the property owner is
responsible for the second condition. Please be aware, violations of the above -listed conditions
are subject to civil penalty assessment of up to twenty-five thousand dollars ($25,000) per
violation per day.
Applicant/Agent's Signature
CAMA General Permit Number:
North Carolina Division of Water Quality Internet: www ncwateroualitkorg
943 Washington Square Mall Phone: 252-946-6481
Washington, NC 27889 FAX 252-946-9215
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper
Date
Nne
orthCarohna
Naturally