Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
58892_SWIBER, MATHEWS & MARTHA_20111003
F-sL ❑ CAMA / ❑ DREDGE & FILL i �e GENERAL PERMIT Previous permit# ❑New ❑Modification ❑Complete Reissue El Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC i ❑ Rules attached. Applicant Name Project Location: County Address P Street Address/ State Road/ Lot #(s) City StateZIP Phone # O Fax # ( ) Subdivision Authorized Agent City ZIP Affected ElCw ElEW ElPTA ElES ❑ PTS Phone # ( River Basin AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A Adj. Wtr. Body (nat /man /unkn) ❑ PWS: ❑ FC: ORW: yes / no PNA yes / no Crit.Hab. yes / no Closest Maj. Wtr. Body ■■■■■■it■■�■■■■■■■■■ro�i■■■■■■■a■®■■■ ■■■■■■■■■■■I/ul��'■■■■■■■■■■®■■■■■■■■■■■ ■■■■■■■■■■■■�►.%�i!■LEI■■■■■■■■■■■■■■■■■■■■■ ::.. • iR■■■■■■■■M►JM■■■■■■N■■■■■■■■■■■■MEMO ]E■■OMEMRaMMM■ NOON MERM■WINO :■MEEO■�iM■!■■■■,�.��:■■■■■■MM■■■� �a■ I�iM■il►�Jh1iiM■ME■MMrMrIEMMNMO�7i19prOWNUUMMtlr MM■■M ■'i■■■O■■■N■!1■■Ill'r'�■■M■■Sri�1�l■f�M■■■I�l@yilM■■■■ �'.a� ��e !■ a■ ® Mro�NM■®r ug■y en■■■EOM■N ��■�����I����,��;,���'■MMv■■mil■N■E�:■MNMMM �� ��1.40 .. M�■MM■MML!/15dN�ill,'Rli�ilr'���!'it�s70 q����M■�M■■■ ■■�1 .■■t.aU�liil�i■LIMN■rE .OI�.� �. ■_�:MOON ■ir�ill�ll�4 MEMENEM MM'1�1/IIOrdm1M1� WFAI11i'rl■ill:�!9OOEi6 lid►"No MO■NE ■■NI90E�■.■. ■EEEM■■�■E■■aE■E ■r�I NOWSHO ■■ �:r�i�■era■■■■■ Ii■+■■■OE■Wc■M■MI-AE■®■■ Esc �����■ ■■■■+�i�■■�■EN■■If�EE■wNEr� WMIMIRM ■MWOOVIRGH ■■�ru��wtic [�"OHNOWN ■ r�i�t�►■®E■MOM■■NEE 9� 1MIL i■E■iM�i■■i■�i■OiM■■ Agent or Applicant Printed Signature Please read compliance statement on back of permit Application Fee(s) Check # i Permit Officer's Signature Issuing Date T444 Expiration Date Local Planningjurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian Iandowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Morehead City Headquarters Mailing Address: 400 Commerce Ave 1638 Mail Service Center Morehead City, NC 28557 Raleigh, NC 27699-1638 252-808-2808/ 1-888ARCOAST Location: Fax: 252-247-3330 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax:910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 SHORELINE PIERS & BOAT LIFTS, INC. DBA SHORELINE MARINE CONSTRUCTION 580 PEARSON CIR 252-393-7934 NEWPORT, NC 28570 PAY TO THE ORDER OF DATE O �/ 1307 66-30/531 341 $460,� DOLLARS First Citizens Bank FOR II000 L 30 ?o i:0 5 3 L❑0 3001:❑❑ 34 L 2 30890 2u' SEP-05-2011 05:46 PH SHORELIh-aE Mi1RIHE CONST. 1+252+3973+; 934 P.07� r ��wr� rr■ 1-1vly v1 vrrr,%V IPlr A AGENT AUTHORIZATION FORM Date ! ` r r Name of Property Owner Applying for Permit: M6�\-e� fmco�-�-r 8��6v— Mailin Address: I certify that I have authorized (agent)4�04Vl�0 b 5 to act on my behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to install or coastruct (activity) at (my property located at) This certification is valid thru (date) f I- .? " + Property Owner Signature Date lei W lei A .1j ko PROPOSED WADI- ALICLM" o-r R" ip p►3-p Pl.flcEr::l C ToE of WALL 6,,4vc& No qowu.- — . m t � f re:? A,-j r JUL-20-2011 10:33 AM PRESTIGE LAND SURVEYING 252 393 3075 P.02 . k///iTF OfIX R/vE.¢ N 49 V- y (J✓fRA,6w0 L�cC�e/L - 4,?w& Lf arb,eY. e,c/cAt WOOD F�Ak 6 ors P,taa�try O �0.63 G E6En/D «t• w•... . . RnKe .a.v .1/k/ / I&Ar7- ar Ao'4V rc ce.vrS.B 41A10, —O— oVFR?WPAO P.m. ibn/E,c 'POLE iJa/re �,r ,t SO&W D V/t;IN/7'Y MAP .vo7Fs+ /.J,4,cdA� S./S.9C.eEs eJcc osuecR /�/qOo D'r 3�JR�FFiQc.VC6� AN.4./Y� PG. 'VV rVAS it.ir /s 541JU&T T+ ALc 6 e-"m"rV"r/ .@/6NTS OF A.NW/ A,vd .A4,e'ft�7EA/7s � RKgC� 77W-T Pe,r r. 051, Zv� Ri, wi feeaow[+y 41 .._. sU,IV ly FpQ �AiP711V �1Z/�orV5 /tAl 5C17W1 N , herQby CQrt jfy that this ma .am6p 0, prep¢red according to th ��!, Practice for Land Surve `ua-�%, ,{ �/� / ��/VG L/w/�sCL//W/V Carolina, and that eT= the property 12YInCT �e nero@(1��7enis GU F OAS St/8L�/V/S/P.�/ COUNTY C/TY TO MNSH/P on snid survey are ¢x sh n.)JC�nt1L CAA?7�FR 7 CEOIQ fb/A/i (/N/T6 9,4& TXIS P ' FORS,RENC62 s --sYi . �� : SCALE/. / 6 IUTd iYfA,Qc,U .-Sn . rlwl? PROJECT No. gtnnm Qgistore�rveyor F�1Tt �'1 0. UR L'YCD BY f1Af6 """" Engineering and Land Surveying, P.A. RBH �/ /irtW�GN /A9.� 101 ,n®tee Street- Cape Carteret � nRAWIV 6Y PWD BOOK sSwanaboro, North Carolina 29684 PACE s�.eG ..moo. 919-393-2129 (Fax1019-va.q-sins SEPY 1 4-2 01 1 1 2 : 42 PM SHORELINE MARINE CONST . 1 +252+3y3+ + ; 34 NEWPORT, NC 28570 ...,. P. 01 mobile 252 646 3212 office 1 fax 252 393 7934 email: abrooksl@ec.rr.com FAX COVER SHEET TO. 0.,e cr�L r DA ET I - /I.I FAX 741- 3 3 -50 FROM., A--$ � )-ey # PA ES SENT : i .9L (including this cover) $.TE JE: (V i ar� SEP-14-2011 12:42 PM SHORELINE MARINE COMET. 1+252+393+7934 P.92 N.C. DIVISION OF COASTAL MANAGEMENT AGENT AUTHORIZATION FORM Date q l Name of Property Owner Applying for Permit: Mailing Address: V (�ec�c� poikn± (' �j (, I certify that I have authorized (agent) kYes( i 0 ,>6 to act on my behalf, for the purpose of applying for and obtaining all CA -MA Permits necessary to install or construct (activity) at (my property located at) This certification is valid thru (date) [ /' V - + Property Owner Signature Date 21LIZ CA? A pf %'2 1 11 C -Ao4 ���\ z i? J W 1� 0 I 61ri(-6c pile a. -2 -yc (o Iry citq wAt'Fe JL I�p r Meo^ 'IN 10, TV,/ 315 SEP-14-2011 12:43 FM SHORELINE MARINE CONST. 1+252+393+7934 P.04 DIVISION OF 1 MANAGEMENT ADJACgNT,$lPARJA P. f 011l(,NER Nt1TIFICATION FORM CERTIFIED MAIL - R- (URN RECEIPT REQUESTED hereby certify that l own property adjacent to Q I' mov eg -t 3 w I Lq r „ (Name of Property owner) property located at 0 4—I 0 Q • o+► dress, Lrot, 81ock, Ro d, etc.} f - N.C. on (Waterbody) (City/Town and/or County) Agent's Name #: p * Mailing Address: 17 44 Po q tsAti C i (dc— -& Agent's phone #: 25 2 - G q If ! o~ N 'e w e �C. zr,5D He/She has described to me as shown below the development he/she is proposing at that location, and I have no objections to the proposal. ---»-------------------------------------------- ------------- ---- -------- DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (individual proposing development must fill In description below or attach a site drawing) , 0. pip K you have objections to what Is being proposed, you must notHjr the Division of Coastal ManagemOn" C (DCM) in writing within 10 days of receipt of this notice. Contact information for 0CM ofl9cas is b available at www.nccoastaimangwn "t neticontaci dcm.htm or by calling 1.888-4RCOAST. No re once is considered the same as no oblection If yoghave been notified by Cer~ Mail. (Propftrty ovAner Inf9pwe,q4pr►) sigrratuar- print or Type Name n I EA .0 Mailing AXddress rty/Ststelzip Telephone Number Date (Riparian Property Owner Informs on) Sig ture AI CA —AI A- _cl3 O 0 Al rrnt or Type Name Mailing Address G1tylstate21p -�%— _,P�af�g3-- 89 Telhone Number . -. s, Dete ■ CorrViEft Rom 1. 2. and 3. Also Oampiete item 4 if Pmb icted Dd w y is dasileti. ■ Parbat your name and address on the reverse so that we can mw m the rant to you. ■ Attach this card to 1ho back of V* rna9V*ce, or on the hoO 9 space permits. 1. ArtiGe Addressed to: 1Aa4wr,K 360o W000(MaJ"8tvt x-/ wm�-WA eee r, ilk D. h dr y address **nx t from ftn 17 ❑ yes 0 WFS, afltw ddh ery adds beimw ❑ tdo a serer Type Ceff*W RW ❑ Express Mail Remised ❑ Rattan Receipt for f wrhandse ❑ insured hWI © CAD. 4_ Restrk%ed Deirery? Prue FeO ❑ Yes 2. Article Ntnnber fTrat w *CM service ra(ae9 7 D 11 3110 O G 01 0426 3968 Ps Foam 3811, Febnxuy 2oo4 Doormtic Ream Receipt Li t It 14 IMSWWWAW Styron, Heather M. From: Guthrie, Barry Sent: Wednesday, September 14, 2011 1:52 PM To: Styron, Heather M. Subject: FW: Objection to proposed development at 200 Bluff Road From: John Mackowiak [mailto:jmackowiak@c-o-r.org] Sent: Tuesday, September 13, 2011 11:07 AM To: Guthrie, Barry Subject: Objection to proposed development at 200 Bluff Road I own the property at 186 Bluff Road. My new neighbor at 200 Bluff Road proposes to build a sea wall along our property line (perpendicular to the shoreline) that would deflect energy, especially when wind and waves are coming from the northwest. As you know, this is a frequent wind direction with storms. This part of the White Oak River does experience some high energy conditions with storm surge. This deflected energy off or the sea wall would cause further erosion of our property. The past evidence of this accelerated erosion is clearly visible on our property. The previous owner brought in a large quantity of fill material (600 truck loads) and hardened his newly made steep bank with rip rap and concrete. While it preserved his land, the deflected energy continued to erode our property and numerous trees has fallen into the river from our property. The newly proposed vertical vinyl wall parallel and perpendicular to the shoreline is expected to deflect more energy at my unprotected shore than the existing rip rap wall on an angled slope parallel to the shoreline. Therefore I object to the addition of this wall because of the damage it will cause to the property and the coastal environment. Please call me to let me know: a) that you did receive this email and b) how I should proceed, so that additional damage is not done to the shoreline. John Mackowiak PhD jmackowiak a(7.c-o-r.org 919-942-9903 office 919-619-3838 cell Brownlow, Roy From: John Mackowiak Omackowiak@c-o-r.org] Sent: Friday, September 30, 2011 9:43 AM To: Brownlow, Roy; Styron, Heather M. Subject: FW: 200 Bluff Road Attachments: 2 swiber propsals.pdf I think I misunderstood the swiber proposal drawn on paper. Here is my email to him asking for clarification. A letter he sent to me stated that he is requesting a permit to build a wall that causes damage to our property in effort to protect his, but he would not extend that wall to minimize damage to our property while he protects his. Is that what he explained to you also? John Mackowiak PhD 4mackowiak(oc-o-r.org Center for Outcomes Research Nashville TN www.c-o-r.org 919-942-9903 office 919-619-3838 cell From: John Mackowiak [mailto:jmackowiak@)c-o-r.orgl Sent: 2011-09-30 09:31 AM To: 'Matthew Swiber' Subject: RE: 200 Bluff Road Just to clarify or letter to CAMA, we are opposed to any structures that will increase erosion on our property. I assume you would be opposed to the same. By turning your wall and facing your wall toward our property, all experts agree that wave action and currents would be created that accelerate the erosion of our property in an attempt to save your property. If you wanted to turn the wall back 30-40 feet away from our property line and cause the localized damage to your own property, we would not be able to stop you from doing so. But we oppose damage being cause on our property as we would expect you to oppose it if we did damage to you. I did see the two proposals that you offered on the attached pdf, but maybe you can explain them better because the drawing you provided is not consistent with the letter you just sent. In one proposed option in the pdf you are facing a sea wall at our property which we oppose because you would be causing damage to our shoreline in attempt to save yours. In the other option, you drew the extension of the wall on to our property. Please explain how far you would pay for that extension. The drawing shows no clear ending point, so please be specific in your proposed options. You last letter says you would not pay, which means you're your dotted line should be removed if I understand your letter. Please clarify the 2 options you are proposing. I also added dimensions to your drawing if it is done to scale. If it is not drawn to scale, please include dimensions so everyone concerned understands your proposed options for your construction permit. John Mackowiak PhD 0mackowiak(aDc-o-r.orq Center for Outcomes Research Nashville TN www.c-o-r.org 919-942-9903 office 919-619-3838 cell From: Matthew Swiber Finailto:admin@swiber.net] Sent: 2011-09-30 08:46 AM To: imackowiak@c-o-r.org Subject: 200 Bluff Road Please see attached letter regarding our proposed bulkhead. m a h z 0 U w z a E w z J w x 0 z 0) 0 cir v 044K pl j c REwc. WA-LL RIP S t � O all, RECENED SEP 29 2011 , J ' PbsS 181,E W 4L. DCM-MHD CITY ` l 200 SLUFF Qom t'1 MRc-<OW IAK PRop, t; 91 Brownlow, Roy From: admin@swiber.net Sent: Wednesday, September 28, 2011 2:39 PM To: Brownlow, Roy Subject: Re: Documents Thank you. Martha Sent from my HTC on the Now Network from Sprint! ----- Reply message ----- From: "Brownlow, Roy" <roy.brownlowkncdenr.gov> Date: Wed, Sep 28, 2011 12:30 pm Subject: Documents To: "marthakswiber.net" <marthagswiber.net> Cc: "matthew gswiber.net" <matthewgswiber.net> Ms. Swiber, Hope this finds you doing well. Please find attached the public documents you requested: • Drawing submitted by your authorized agent (contractor) Ashley Brooks to DCM on 9/29/2011 of proposed shoreline stabilization project — specifically the east end adjacent to Mackowiak property. • Mr. Mackowiak's email message with subject: "Objection to proposed development at 200 Bluff Road." If you need further assistance, please feel free to contact me. Regards, Roy Brownlow Acting District Manager, Morehead City District Office & Compliance Coordinator NCDENR NC Division of Coastal Management 400 Commerce Ave Morehead City, NC 28557 (252) 808-2808 Extension 217 Roy. Brownlowt7a ncdenrgov E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Brownlow, Roy From: John Mackowiak Omackowiak@c-o-r.org] Sent: Thursday, September 29, 2011 10:31 AM To: Brownlow, Roy Subject: RE: 200 Bluff Rd, Cedar Point I am on a plane now landing in TN in a few minutes. I have an idea that may work. I will call you at 1, or please start calling me on my cell when you and Heather are available. John Mackowiak PhD 0mackowiak(cDc-o-r.org Center for Outcomes Research Nashville TN www.c-o-r.org 919-942-9903 office 919-619-3838 cell From: Brownlow, Roy[maiIto: roy.brownlow(atncdenr.gov1 Sent: 2011-09-28 02:18 PM To: imackowiak@c-o-r.org Cc: matthew@swiber.net; martha(abswiber.net; Styron, Heather M. Subject: 200 Bluff Rd, Cedar Point Mr. Mackowiak, Hope this message finds you doing well. Thank you for briefly discussing the Swiber's proposed shoreline stabilization project with us this afternoon by telephone. understand you were departing on an airplane and you had to discontinue use of your cell phone during our conversation. Please find attached to this message a drawing submitted by the Swiber's contractor (Mr. Ashley Brooks) to DCM which was received on 9/28/2011. He and Mr. Matt Swiber met with Heather and me on 9/27/2011 on the property. I conveyed your concerns to the Swiber's and Mr. Brooks. Based upon that site visit and conversation, Mr. Brooks has submitted two options on the attached drawing. Please call me tomorrow to resume discussion on the Swiber's proposed shoreline stabilization and your concerns. I will be available in the office from 8:00 to 9:00 and will then be available from 1:00 to 5:00 pm. Thank you, Roy Brownlow Acting District Manager, Morehead City District Office & Compliance Coordinator NCDENR NC Division of Coastal Management 400 Commerce Ave Morehead City, NC 28557 (252) 808-2808 Extension 217 Roy. B rown low(.ncden r.gov E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. i f �--- � AtU RECEIVED SEP,` ?_011 ,7 DCh4 NIHD CITY 20o 9 Lu F)F: ftAo jk It li 4,k gft.o I p a( r ,I t. • I., , 1 I i ;'I�i: , 1p 1 ��1 it t` 1 t ' y r �. r.Ad , I 11 r i ' 1 `'• � �' y i1 `1 � � i ,, y If. %'t I!I�` it � t ! : a 11 1 4q 1 Ilr t ' l l 1 1 i• 1 � 111 � �• I 1 I 1 r 1 , ; i ,t 1 i 1 I I i I 1 :I I. ,1• ' ill V�,�il: 1 Ili � .:� ' .•1 � - ' , ' . 1. '.''. ' _. 1 : � L I• � � 4:1 �.1.� �i .. _ >, � �. Brownlow, Roy From: Brownlow, Roy Sent: Wednesday, September 28, 2011 2:18 PM To: 'jmackowiak@c-o-r.org' Cc: 'matthew@swiber.net'; 'martha@swiber.net'; Styron, Heather M. Subject: 200 Bluff Rd, Cedar Point Attachments: swiber.pdf Mr. Mackowiak, Hope this message finds you doing well. Thank you for briefly discussing the Swiber's proposed shoreline stabilization project with us this afternoon by telephone. understand you were departing on an airplane and you had to discontinue use of your cell phone during our conversation. Please find attached to this message a drawing submitted by the Swiber's contractor (Mr. Ashley Brooks) to DCM which was received on 9/28/2011. He and Mr. Matt Swiber met with Heather and me on 9/27/2011 on the property. I conveyed your concerns to the Swiber's and Mr. Brooks. Based upon that site visit and conversation, Mr. Brooks has submitted two options on the attached drawing. Please call me tomorrow to resume discussion on the Swiber's proposed shoreline stabilization and your concerns. I will be available in the office from 8:00 to 9:00 and will then be available from 1:00 to 5:00 pm. Thank you, Roy Brownlow Acting District Manager, Morehead City District Office & Compliance Coordinator NCDENR NC Division of Coastal Management 400 Commerce Ave Morehead City, NC 28557 (252) 808-2808 Extension 217 Roy.Brownlow ncdenr iov E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 71 o Zr 5 SECTION .1100 - GENERAL PERMIT FOR CONSTRUCTION OF BULKHEADS AND RIRAP REVETMENTS FOR SHORELINE PROTECTION IN ESTUARINE AND PUBLIC TRUST WATERS AND OCEAN HAZARD AREAS 2,,,, 1SA NCAC 0711.1101 PURPOSE A permit under this Section shall allow the construction of bulkheads and riprap revetments for shoreline protection in the public trust waters and estuarine waters AECs according to authority provided in Subchapter 07J .I 100 and according to the Rules in this Section. This permit shall not apply to shoreline protection along the oceanfront or to waters and shorelines adjacent to the Ocean Hazard AEC with the exception of those shorelines that feature characteristics of the Estuarine Shoreline AEC. Such features include the presence of wetland vegetation, lower wave energy and lower erosion rates than the adjoining Ocean Erodible Area. History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124; Eff. March 1, 1984; Amended Eff. July 1, 2009; April 1, 2003. I SA NCAC 07H .1102 APPROVAL PROCEDURES (a) An applicant for a General Permit under this Subchapter shall contact the Division of Coastal Management and request approval for development. The applicant shall provide information on site location, dimensions of the project area, and the applicant's name and address. (b) The applicant shall provide: (1) confirmation that a written statement has been obtained signed by the adjacent riparian property owners indicating that they have no objections to the proposed work; or 2) confirmation that the adjacent riparian property owners have been notified by certified mail of the proposed work. The notice shall instruct adjacent property owners to provide written comments on the proposed development to the Division of Coastal Management within 10 days of receipt of the notice, and, indicate that no response shall be interpreted as no objection. The Division of Coastal Management shall review all comments and determine, based on their relevance to the potential impacts of the proposed project, if the proposed project can be approved by a General Permit. If the Division of Coastal Management detennines that the project exceeds the guidelines established by the General Permit Process, DCM shall notify the applicant that an application for a major development permit shall be required, (c) No work shall begin until an on -site meeting is held with the applicant and a Division of Coastal Management ` resentative so that the proposed alignment may be marked. Written authorization to proceed with the proposed development shall be issued if the Division representative finds that the application meets all the requirements of this Subchapter. Construction of the bulkhead or riprap revetment shall be completed within 120 days of the issuance of the general authorization or the authorization shall expire and it shall be necessary to re-examine the alignment to determine if the general authorization may be reissued. History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124, Eff. March 1, 1984; Amended Eff. July 1, 2009; October 1, 2007; September 1, 2006; January 1, 1990; December 1, 1987. 15A NCAC 07H .1103 PERMIT FEE �/ The applicant shall pay a permit fee of two hundred dollars ($200.00) fo riprap reve ents sited at or above normal high water or normal water level, or a permit fee of four hundred doll ($400.00) r riprap revetments sited below normal high water or nonnal water level. The applicant shall pay a pe it fee our hundred dollars ($400.00) for bulkheads. Permit fees shall be paid by check or money order payable to the Department. History Note: Authority G.S. 113A-107; 113A-113(b); 113A-118.1; 113A-119; 113-119.1; 113A-124; Eff. March 1, 1984; Amended Eff. October S, 2009; September 1, 2006; August 1, 2000; March 1, 1991. I5A NCAC 07H .1104 GENERAL CONDITIONS (a) This permit authorizes only the construction of bulkheads and riprap revetments conforming to the standards herein. (b) Individuals shall allow authorized representatives of the Department of Environment and Natural Resources to make periodic inspections at any time deemed necessary in order to ensure that the activity being performed under authority of this general permit is in accordance with the terms and conditions prescribed herein. 47 c) There shall be no interference with the use of the waters by the public by the existence of the bulkhead & the mprap revetment authorized herein. Bulkheads and riprap revetments authorized in this Rule shall not interfere with the established or traditional rights of navigation of the waters by the public. (d) This permit shall not be applicable to proposed construction where the Division of Coastal Management has determined, based on an initial review of the application, that notice and review pursuant to G.S. 113A-119 is necessary 4 because there are unresolved questions concerning the proposed activity's impact on adjoining properties or on water quality; air quality; coastal wetlands; cultural or historic sites; wildlife; fisheries resources; or public trust rights. (e) This permit shall not eliminate the need to obtain any other required state, local, or federal authorization. (f) Development carried out under this permit shall be consistent with all local requirements, AEC rules, and local land use plans current at the time of authorization. I History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124; Eff. March 1, 1984; Amended Eff May 1, 1990; December 1, 1987; f� LOS RRC Objection due to ambiguity Eff. May 19, 1994; ntigtr o���s Amended Eff. July], 2009; August], 1998; July I, 1994.cc� f '> 1 SA NCAC 071-1.1105 SPECIFIC CONDITIONS (a) Along shorelines void of wetland vegetation: (1) New bulkheads shall have an average approximation of normal high water or normal watei�lre>�1,21 he li bulkhead position shall not exceed a distance of five feet waterward of normal high water or nor water level at any point along its aligmment. (2) New bulkheads or riprap revetments on shorelines within manmade upland basins, canals, and ditches, shall be positioned so as not to exceed an average distance of two feet and maximum distance of five feet waterward of nonnal high water or normal water level. (3) When replacing an existing bulkhead, the new alignment shall be positioned so as not to exceed a maximum distance of two feet waterward of the current bulkhead alignment. To tie into a like structure on the adjacent property, replacement bulkhead position shall not exceed a maximum distance of five feet waterward of the current bulkhead alignment. When replacing a bulkhead where lands landward of the bulkhead were lost in the last year, bulkheads shall be positioned a maximum of two feet waterward of the original/existing alignment. (4) Riprap revetments shall be positioned so as not to exceed a maximum distance of 10 feet waterward of the normal high water or normal water level at any point along its alignment. 9ns(b Along shorelines with wetland vegetation, bulkheads and riprap revetments shall be positioned so that all tructionis to be accomplished landward of such vegetation. Bulkheads shall be constructed of vinyl, or steel sheet pile, concrete, stone, timber, or other suitable materials approved by the Division of Coastal Manag m nt. (d) Riprap revetments shall be constructed of granite, marl, concrete without exposed rebar, or other suitable materials ,,�pproved by the Division of Coastal Management. Revetment material shall be free from loose dirt or other pollutants. (fj Revetment material shall be of sufficient size to prevent movement from the site by wave action or currents. (g) Construction design for riprap revetments shall take into consideration the height of the area to be protected (i.e. bulkhead height, escarpment height, water depth) and the alignment shall allow for a slope no flatter than three feet orizontal per one foot vertical and no steeper than 1 '/2 feet horizontal per one foot vertical. (h) All backfill material shall be obtained from an upland source pursuant to 15A NCAC 07H .0208. The bulkhead or riprap revetment shall be constructed prior to any backfilling activities and shall be structurally tight so as to prevent /�eepage of backfill materials through the structure. (i) No excavation, grading or fill shall be permitted except for that which may be required for the construction of the bulkhead or riprap revetment. This permit shall not authorize any excavation waterward of the approved alignment. ✓O) Runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do no enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, sand fence, etc.). 4,(k) If one contiguous acre or more of property is to be excavated or filled, an erosion and sedimentation control plan shall be filed with the Division of Land Resources, Land Quality Section, or appropriate local government having jurisdiction. This plan shall be approved prior to commencing the land -disturbing activity. �'For the purposes of these Rules, the Atlantic Intracoastal Waterway (AIWW) is considered a natural shoreline. c M) Construction authorized by this general permit shall be limited to a maximum shoreline length of 500 feet. History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113.4-124; Eff. March 1, 1984; Amended Eff. July 1, 2009; April 1, 2005; December 1, 1991; January 1, 1989; December 1, 1987 48