Loading...
HomeMy WebLinkAbout59558_STANTFIELD, JOHN_20120409CAMA / ❑ DREDGE & FILL GENERAL PERMIT ❑New ❑Modification ❑Complete Reissue El Partial Reissue As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC 9j� 1 Previous permit # Date previous permit issued ❑ Rules attached. A li—t- Name P ct L f C pp Address CityState ZIP Phone # (_) Fax # ( ) Authorized Agent Affected - Cw EW PTA AEC(s): L_� OEA HHF IH I-- PwS: C FC: ORW: yes / no PNA yes / no ES PTS UBA - N/A Crit.Hab. yes / no role oca ion. ounty Street Address/ State Road/ Lot #(s) Subdivision City ZIP Phone # ( ) River Basin Adj. Wtr. Body (nat /man /unkn) Closest Maj. Wtr. Body Type of Project/ Activity Pier (dock) length` Platform(s) - Finger pier(s) (Scale: , ) Groin length number Bulkhead/ Riprap length ' avg distance offshore max distance offshore Basin, channel cubic yards_ Boat ramp Boathouse/ Boatlift Beach Bulldozing Other 7 I Shoreline Length SAV: not sure yes no-i Sandbags: not sure yes no Moratorium: n/a yes no Photos: yes no Waiver Attached: yes no A building permit may be required by: El See note on back regarding River Basin rules. Notes/ Special Conditions Agent or Applicant Printed Name Signature ** Please read compliance statement on back of permit ** Permit Officer's Signature Issuing Date Expiration Date Application Fee(s) Check # Local Planning Jurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certifythatthis project is consistentwith the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Morehead City Headquarters Washington District Mailing Address: 400 Commerce Ave 943 Washington Square Mail 1638 Mail Service Center Morehead City, NC 28557 Washington, NC 27889 Raleigh, NC 27699-1638 252-808-2808/ I-888-4RCOAST 252-946-6481 Fax: 252-247-3330 Fax: 252-948-0478 Location: (Serves: Carteret, Craven, Onslow -above (Serves: Beaufort, Bertie, Hertford, Hyde, 2728 Capital Blvd. New River Inlet- and Pamlico Counties) Tyrrell and Washington Counties) Raleigh, NC 27604 919-733-2293 Fax: 919-733-1495 Elizabeth City District Wilmington District 1367 U.S. 17 South 127 Cardinal Drive Ext. Elizabeth City, NC 27909 Wilmington, NC 28405-3845 252-264-3901 910-796-7215 Fax:252-264-3723 Fax:910-395-3964 (Serves: Camden, Chowan, Currituck, (Serves: Brunswick, New Hanover, Dare, Gates, Pasquotank and Perquimans Onslow -below New River Inlet- and Counties) Pender Counties) Revised 08/09/06