HomeMy WebLinkAbout60284_SNYDER, BARRY_20120717uCAMA / 'DREDGE &FILL
�/' No. 60284
GENERAL PERMIT Previous permit#
-New !Modification —Complete Reissue -]Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
❑ Rules attached.
Applicant Name Project Location: County_
Address Street Address/ State Road/ Lot #(s)
City_ State ZIP
Phone # (-----)--- Fax #
Authorized Agent
Affected F J CW EW _ PTA � ES PTS
AEC(s): —I OEA J HHF l IH UBA 1 N/A
C PWs: FC:
ORW: yes / no PNA yes / no Crit.Hab. yes / no
Type of Project/ Activity
Pier (dock) length _ _
Platform(s) _
Finger pier(s)
Groin length
number
Bulkhead/ Riprap length ' i
avg distance offshore ^—
max distance offshore_
Basin, channel
cubic yards
Boat ramp
Boathouse/ Boatlift
Beach Bulldozing__
Other
011
Shoreline Length_
SAV: not sure yes
Sandbags: not sure yes no
Moratorium: n/a yes no
Photos: yes no
1
Waiver Attached: yes n�
A building permit may be required by:
Notes/ Special Conditions
Agent or Applicant Printed Name
Signature ** Please read compliance statement on back of permit **
Subdivision
City ZIP
Phone # () River Basin
Adj. Wtr. Body (nat /man /unkm
Closest Maj. Wtr. Body
(Scale: .� )
C' See note on back regarding River Basin rules.
Permit Officer's Signature
Issuing Date
Expiration Date
Application Fee(s)
Check #
Local Planning Jurisdiction
Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar- Pamlico River Basin Buffer Rules _� Other:
0 Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office
Morehead City Headquarters
Mailing Address:
400 Commerce Ave
1638 Mail Service Center
Morehead City, NC 28557
Raleigh, NC 27699-1638
252-808-2808/ 1-888-4RCOAST
Location:
Fax: 252-247-3330
2728 Capital Blvd.
(Serves: Carteret, Craven, Onslow -above
Raleigh, NC 27604
New River Inlet- and Pamlico Counties)
919-733-2293
Fax:919-733-1495
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax:252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax:910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
A��
fA
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Beverly Eaves Perdue James H. Gregson Dee Freeman
Governor Director Secretary
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins
per Division of Water Quality (DWQ) regulations 15A NCAC 026.0259 & 0233. The Division of Coastal Management
(DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project
proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical
alternatives" determination per those regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as
long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply
with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor
land clearing to a civil penalty of up to $25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either
the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be
impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the
buffer is a violation of the riparian buffer rules.
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
5. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per
acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re-
established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would
remove understory vegetation is allowed. • Pre -project site conditions: (//
,�z ��/� /�n r
6. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and
construction corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
information is complete and accurate.
c%tnJ( So
Age or Applicant P ' ted N me Permit Offi is S' nature
� 1
gen r pplicant Signature Issue to
CAMA GENERAL PERMIT #: C
Washington Office Morehead City Office
943 Washington Square Mall 400 Commerce Avenue
Washington, NC 27889 Morehead City, NC 28557 One
NorthCaTollria
Phone 252-946-6481 Phone 252-808-2808
An Equal Opportunity/Affirmative Action Employer-50% Recycled/10% Post Consumer Paper vVa&&11�
Version 5, 09/2009
N.C. DIVISION OF COASTAL MANAGEMENT
AGENT AUTHORIZATION FORM
Date J I e
Name of Property Owner Applying for Permit:
Yr �-
Mailing Address:
10 Dvev- I A Cj.
Van�S I2�Lo) MC a�50�)
I certify that I have authorized (agent) ,i j. t'1 GSc� M CIYI Yle )n*y4(6to act on my
behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to
install or construct (activity)
at (my property located at) I M v e Y 0o V—C+
This certification is valid thru (date) l02 o
Property Owner Signature
1'c
�,, J—a2Oi2—
Date
DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION FORM
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
I hereby certify that I own property adjacent to f-A k Ala f LoLt 5ojj c -s
(Name of Property Owner)
property located at
(Address, Lot, Block, Road, etc.)
on ��S—, in &0 On 0 CC), N.C.
(Waterbody) '(City/Town and/or County)
Agents Name #: -1 +LC �' IJU Mailing Address: PO 7�t) Vq7zf
Agent's phone #: ".' 1"I - 0 6 ri e
He/She has described to me as shown below the development he/she is proposing at that location,
and I have no objections to the proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Individual proposing development must fill in description below or attach a site drawing)
."L? .
rC^ .e e V-- fro � y i s4I nf�
c �cs ed
Picg-
ahVA-+�2 - �C--,-
y�r0p��+y 5�yde Rope(-V Q perz-i
if you have objections to what is being proposed, you must notify the Division of Coastal Management
(DCM) in writing within 10 days of receipt of this notice. Contact information for DICK offices is
available at www.nccoastalmangement-nebcontact dcm.htm or by calling 1-888-4RCOAST. No
response is considered the same as no objection if you have been notified by Certified Matt.
(Property Owner Information)
Signature
Print or Typb Name J '
Ibi (NVIA, C4.
Mailing Address
t�xrG /\'C
Wstateop
aso - aya -- A s q
Telephone Number
Date
(Riparian Property Owner Information)
Signature
Print or Type Name
Li t
Marling Address
CitylStawzip
Telephone Number
Date
DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION FORM
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
hereby certify that I own property adjacent to 12re �hjgyy Lou 5ojAft('s
(Name of Property Owner)
property located at
(Address, Lot, Block, Road, etc.)
on �%� ��S c�� P , in16 I c N.C.
(Waterbody) (City/Town and/or County)
Agent's Name #: n f ZL4 4' +5Dn MailingAddress- PO 9�1) Y
Agent's phone #:
He/She has described to me as shown below the development he/she is proposing at that location,
and 1 have no objections to the proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Individual proposing development must fill in description below or attach a site drawing)
Pr
Lxis4ir3
Pi e-VL
` L
e ICI e (-+y
sdip Rap
L-vve
PrvP�rL-�
If you have objections to what is being proposed, you must notify the Division of Coastal Manageme"t
(DCM) in writing within 10 days of receipt of this notice. Contact inlwmation for DCM offkas is
available at www.nccoastalmengement net/contact dcm.htm or by calk 1488-4RCOAST. No
response is considered the same as no objection ff you have bepg notff Cer~ Mail
--�;
(Property Owner Information)
Signature
p�
TYA)r '+
c
Pn-nt or T p Name
I bIq Vv( I ooy-
C4.
Mailing Address
- r� 9
pt
City
teop
Asa -aria-
��
Telephone Number
Date
Orly Owner Information)
Signature /
Print or Type Name
Ma>7ing Address
CityMaftop
1�?z -� - C - jv
Telephone Number
Date -
B PRESCOTT MARINE CONSTRUCTION
PO BOX 874 252-249-0149
ORIENTAL, NC 28571
PAY
TO THE
ORDER OF
. ......... ....... .... ... . .....
3118
66-30.531
DATE 472
/ /*
DOLLARS
First Citizens
Bank
FOR
111003118ll' 1:0531003001:0047120204970