HomeMy WebLinkAbout60111_SERRA, TOMMASO_20120508❑GAMA / El DREDGE & FILL WMS NO. 60111
GENERAL PERMIT Previous permit#
❑New C7Modification ElComplete Reissue C1Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
❑ Rules attached.
Applicant Name Project Location: County
Address Street Address/ State Road/ Lot #(s)
City State ZIP
Phone # (__—) Fax # (----)—
Authorized Agent
❑ CW ❑ EW -B PTA
Affected
AEC(s):
❑ OEA ❑ HHF ❑ IH
—
PWS: ❑ FC:
ORW:
yes / no PNA yes / no
Type of Project/ Activity
L; ES i] PTS
❑ UBA N/A
Crit.Hab. yes / no
Pier (dock) length Qc
Platform(s) %� /( Cev6j)
Finger pier(s) /1.2
Groin length
number
Bulkhead/ Riprap length
avg distance offshore
max distance offshore
Basin. channel
cubic yards_
Boat ramp
Boathouse/ Boatlift
Beach Bulldozing
Other
O- S
_JJ;eAi�.;n_0.
Shoreline Length
Subdivision
City ZIP
Phone # (_ _ } River Basin
Adj. Wtr. Body (nat /man /unkn)
Closest Maj. Wtr. Body
T6�5 �el -�
(Scale: )
SAV: not sure yes no
Sandbags: not sure yes no —
Moratorium: n/a yes no —
_.-, —
Photos: no
Waiver Attached: no
A building permit may be required by: ❑ See note on back regarding River Basin rules.
Notes/ Special Conditions
Agent or Applicant Printed Name
Signature ** Please read compliance statement on back of permit **
Application Fee(s)
Check #
PermitOfficer's Signature
Issuing Date
Local Planning Jurisdiction
Expiration Date
Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ T!0
ar- Pamlico River Basin Buffer Rl ues ❑Othc-1
er: -
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office Morehead City Headquarters
Mailing Address: 400 Commerce Ave
1638 Mail Service Center Morehead City, NC 28557
Raleigh, NC 27699-1638 252-808-2808/ 1-888-4RCOAST
Location: Fax: 252-247-3330
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax:919-733-1495
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax:252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax: 910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River inlet- and
Pender Counties)
IFOCKS
LKS DECKS N' DOCKS CONSTRUCTION, LLC
vN.,. NEW BERN, NC 28562D
(252) 637-1595 DL 8929001
Construction, LLC
PAY TO THE � jt' � i()�}� 1
ORDER OF (�11
J�?
BRANCH BANKING AND TRUST COMPANY
Boo-BANK-BBT bbt.com 1
I
FR��
li'0083?I,V j:053101120:0005195626296i1'
8374
20 l / / 66-112/531
RS �Ma�
M
Aja
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Beverly Eaves Perdue James H. Gregson Dee Freeman
Governor Director Secretary
BUFFER AUTHORIZATION CERTIFiCATE
n PIER AND DOCKING FACILMES ACCESS WAY
A riparian buffer authorization is required for'pier and docking facilities access ways through the Tar -Pamlico &
Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0233 & .0259.
The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of
Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies
with the aforementioned regulations, and made a "no practical alternatives" determination per those
regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer
Authorization as long as the project is constructed in a manner that continues to meet all of the conditions
listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party
(contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per
violation.
1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM.
The alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of
pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules
to the maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way.
This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting
verify that all information provided is complete and accurate.
ge or pFicant Printed Name
g n or Applicant Signature
CAMA GENERAL PERMIT #: _ 0 � / � C_
Washington Office
943 Washington Square Mall
Washington, NC 27889
Phone 252-946-6481
Morehead City Office
400 Commerce Avenue
Morehead City, NC 28557
Phone 252-808-2808
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
Version 5, 09/2009
A
ANYA
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Govemor James H. Gregson, Director William G. Ross Jr., Secretary
Date
Applicant Name 4 ELL - �( !�-
Mailing Address t� 1D(LEG-I f lE Ol—I vE
I certify that I have authorized (agent) f .� N Of K`o'� 1AC • to act on my
behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to
install or construct (activity) 2--
at (location) Ift
This certification is valid thru (date)
+Signature
400 Commerce Avenue, Morehead City, North Carolina 28557
Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastalmanagement.net
An Equal Opportunity 1 AtTmetiNe Action Employer - 50% Recycled 110% Post Consumer Paper
ADJACENT RIPARIAN PROPERTY COWNER STATEMENT
(FOR A PIER/MOORING PILINGSBOA2 'LIFTIBOATHOUSE)
4
I hereby certify that I own property adjacent to ( ww is
(Name of Properly Owner)
property located at �(D�El,1NE 12121AE
(Lot, Block, Road, et(c.)
n
on ��- 1�-1 Vt� , in Cry. c�iJVn/7�% , N.C.
(Waterbody) (Town and/or County)
Applicant's phone #: ��h' �" U 1 Mailing Addiress: ?4Q &tb FEI,W E 1�30I VE
IVEI�J P7t�N NG2okw-
He has described to me, as shown below, the development 11\11e is proposing at that location, and, I
have no objections to his proposal. I understand that a pier/ ooring pilings / boatlift / boathouse
must be set back a minimum distance of fifteen feet (15') fr m my area of riparian access unless
waived by me. (If you wish to waive the setback, you mint initial the appropriate blank
below.)
I do not wish to waive
I do wish to waive that setback requirement.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT:
(To be filled in by individual proposing .development)
4191tflED DV-A-W «E1
Mailing Address
Nam+ *,qw-
City/State/Zipip
U �- 1(Je)q-7
Telephone Number
lku-� 0R-i1n(
(Riparian Property Owner Information)
Signature
Print or Type Name
Telephone Number
Date
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
(FOR A PIER/MOORING PILINGSBOATLIFTBOATHOUSE)
I hereby certify that I own property adjacent to -TD-A -k /x-W j is
(Name of Property Owner)
property located at �L� IJE 120 V15
(Lot, Block, Road, etc.) /1� �in C N1, N.C. 9-E\9T
(Waterbb��ody) I' (Town and/or County)
Applicant's phone #:'U��' �'t '� Mailing Address: �
f aO P�yr2�LINE59 4 NC, Z/�IQ l VE
e)6 P
He has described to me, as shown below, the development he is proposing at that location, and, I
have no objections to his proposal. I understand that a pier/mooring pilings / boatlift / boathouse
must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless
waived by me. (If you wish to waive the setback, you must initial the appropriate blank
below.)
I do not wish to waive
I do wish to waive that setback requirement.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT:
(To be filled in by individual proposing development)
GJr� 4oTfVttlEp T)(ZAwiKVa
-------------------------------------------------------------------------------------------------------------------
(Riparian Property Owner Information)
phi® NO�TtWF-
MailingAddressss ,, ( (/+ Signature
' l
City/State/Zip Print 4 Type Name
nn
Telephone Number Telephone Number
ode 4 ,tPP�tri.t� z2
She . i)tte Date
Connell, Brad
From: Jason & Miranda Hill [decksndocks@embargmai1.com]
Sent: Friday, July 27, 2012 1:28 AM
To: Connell, Brad
Subject: Permit - Tommaso Serra
Attachments: Drawing - Serra0001.PDF; APOS - Serra0001.PDF; APOS - Serra0002.PDF
Brad,
Here is the new Adjacent Property Owners Statements that Jason had Mr.
Tommaso Serra's neighbors to sign today. Jason told me to email them to you so you can modify
the permit. We are planning on starting to drive pilings either tomorrow or Monday. Let me
know if you have any questions.
Thanks!
Miranda
RECENED
JUL 2 7 z0ll
nCM-M�m cry
1
R��n✓ED
jtjl 272012
DC��HD��7'Y
Da ,�
.....
--- -
,
,
1 /
,
\ r,
,
,
,
r�
,
EECETVED
Appendix A f UL l ? 2012
Adjacent Riparian Property Owners Statement
(for a bulkhead, dock/mooring pilings) oCM MUD CITY
I hereby certify that I own property adjacent to 7o,m
(Name of property owner)
property located at
(Lot, Block, Road, etc.)
2 on 7ltnt� , in 4/611e-- l,, NC�
(Waterbody) (Town and/or County)
He has described to me, as shown below, the development he is proposing at that
location, and, I have no objections to his proposal. I understand that a dock/mooring
pilings must be set back a minimum distance of fifteen feet (15') from my area of riparian
access unless waived by me.
I do not wish to waive the setback requirement.
�-� I do wish to waive that setback requirement.
Description and drawing of proposed development:
(To be filled in by individual proposing development)
Signature
Print name l
3/2- S� o- Z /in -e
Address
A-2
Date /
�S�' - 636- s-e('
Telephone number
Appendix A
Adjacent Riparian Property Owners Statement
'ncMlxp `' (for a bulkhead, dock/mooring pilings)
I hereby certify that I own property adjacent to o P
(Name of property owner)
property located at D
�.
(Lot, Block, Road, etc.)
on
in le-,J , NC
(Waterbody) (Town and/or County)
He has described to me, as shown below, the development he is proposing at that
location, and, I have no objections to his proposal. I understand that a dock/mooring
pilings must be set back a minimum distance of fifteen feet (15') from my area of riparian
access unless waived by me.
I do not wish to waive t elsetback requirement.
h6'5 I do wish to waive that setback requirement.
4�p
4o-{e Description and drawing of proposed development:
(To be filled in by individual proposing development)
signahafe
1. SP -
Print name
Date
x, e ��
Address Telephone number
A-2