Loading...
HomeMy WebLinkAbout59634_SEGAL TRUST_20120319❑ CAMA / ❑ DREDGE & FILL F GENERAL PERMIT Previous permit# ❑New ❑Modification ❑Complete Reissue El Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC s ❑Rules attached. Applicant Name Project Location: County Address Street Address/ State Road/ Lot #(s) City State ZIP Phone # O Fax # Subdivision Authorized Agent i c'a s_ ? City ZIP Affected ❑ CW ❑ EW ❑ PTA []ES ❑ PTS Phone # ( ) River Basin'<..!,�.!'a AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A Adj. Wtr. Body (nat /man /unkn) ❑ PWS: ❑FC: ORW: yes / no PNA yes / no Crit.Hab. yes / no Closest Maj. Wtr. Body Type of Project/ Activity _.■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■ . • . - :.. • ■■�i■■■■■■■■■■■■■■■�i■■■■■■■■■■■■■■■■■■■■■■ SEEM MEN MMANAUMMMEM MEN ■■■■■■■■■■■r.1cI.�lrei■■■/�CJ1il�!! 'a■Lt�.��'�■■■■■■■■ ■■®■■■■ ►1I"■0■l■Ill goLv%■■■M■■M.■■■■■■ ■■■■■ ■■■■■®■■■■■■■■■■■■■■■■■■■®■■■■■■■■■■■ ■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■ ■ ■■■■■■■■■■■■■■■■■■■■■■■■■ ■■ ■■■�■■■■■■■■■■■■■■®■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ • M■■■■E■■■■■�■■■■■■E■■■■■■■■■■■■■■■�■■■■EM ■■■■■M■■■■■■■■■■■■■■■■W■■ ■■■ ONE■■■■■■■■■� fib.. •j _ Agent or Applicant Printed Name Permit Officer's Signature Signature ** Please read compliance statement on back of permit Application Fee(s) Check # Issuing Date Local Planningjurisdiction i Expiration Date Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax: 919-733-1495 Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888ARCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax: 252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 ELKS DECKS N' DOCKS CONSTRUCTION, LLC z. N--- 1483 CRUMP FARM RD. OCKS NEW BERN, NC 28562 (252) 637-1595 DL 8929001 Construction, LLC �J PAY TO E ORDER OF • f 1� 20J- 8288 66-112/531 4 ��•imunu.n COLLARS •« BRANCH BANKING AND TRUST COMPANY 800-BANK-BBT bbt.com FOR �GC"? C 1' ✓ G��.�a��� nm 11@008 28811' 1:0 5 3 LO L L 2 0:000 5 L9 56 26 296i1' JIf BUFFER AUTHORjZATION CERTi =ICATE FOR PIER ND DOCKING FACILITIES ACCESS WAY A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico & +Meuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0233 & .0259. The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical alternatives" determination per those regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per violation. 1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way. This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the conditions listed a ove and verify that all information provided is complete and accurate. ���en or Zrt Printed Name Permit Officer' Signature 06J-e*or Applicant Signature Issue Oate CAMA GENERAL PERMIT #: �06_3' I C Washington Office Morehead City Office 943 Washington Square Mall 400 Commerce Avenue Washington, NC 27889 Morehead City, NC 28557 Phone252-946-6481 Phone252-808-2808 An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper Version 5, 09/2009 Feb 23 12 07:50a Jon Segal 949 489-3826 p.1 N.C. DIVISION OF COASTAL MANAGEMENT AGENT AUTHORIZATION FORM Date Name of Property Owner Applying for Permit: !!5--- -�4 1 k""Jdca 4K IfaS t7,oN i,l d �CS, i rd s�-e-L Mailing Address: lc'oL44-t 191- la � Gr77 I certify that I have authorized (agent) _L�S4�5 S asap' t to act on my behalf for the purpose of applying for and obtaining all CANU Permits necessary to install or construct (activity) _ /L q d L 0 � at (my property located at) -- Y f a j P��„� NGw .SxF�+ (jG This certification is valid thru (date) O—C c 3 r 2 0 i Z Property wnerSignature 1/ I Utz - Date Connell, Brad From: Jason & Miranda Hill [decksndocks@embarqmail.com] Sent: Thursday, March 15, 2012 3:00 PM To: Connell, Brad Cc: ham.ks4o@gmail.com; rw@liggettdesigngroup.com; jonsegal@rocketmail.com Subject: Re: Permits in Riverbend Sounds good ... meet Jason at 10am Monday at the little Riverbend store parking lot. He'll take you to the first place. Thanks! Miranda On Thursday, March 15, 2012, at 01:49 PM, Connell, Brad wrote: > How is Monday morning at 10am ? > B > -----Original Message ----- > From: Jason & Miranda Hill[mailto:decksndocks(@embargmail.com] > Sent: Thursday, March 15, 2012 12:24 PM > To: Connell, Brad > Cc: ham.ks4o(@gmail.com; rw(@liggettdesigngroup.com; > ionsegalprocketmail.com > Subject: Permits in Riverbend > Brad: > I have (2) places for you to go to in Riverbend. The first one is at > 418 Gatewood Drive and the other one is at 214 Gangplank Road. I left > you a message this morning but I know it's easier to contact you by > email. Let me know what your schedule is ... the sooner the better. > Thanks! > Miranda > Decks N' Docks Construction, Inc. 1 ADJACENT RIPARIAN PROPERTY OWNER STATEMENT (FOR A PIER/MOORING PILINGSBOATLIFTBOATHOUSE) I hereby certify that I own property adjacent to J U l-4 ``���-� J t'Z i is (Name of Property Owner) property located at ` f �' &,7AT Gl,'' C C l vE r? (Lot, Block, Road, etc.) on V , in 6 0- A V & , N.C. (Waterbody) yy� (Town and/or County) Applicant's phone #: ���" d J"`�/C ' ailing Address:K— L/iC�u,NA ^067vc-L CA qP&-7'7 He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. I understand that a pier/mooring pilings / boatlift / boathouse must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I N iTiR�., I do not wish to waive I do wish to waive that setback requirement. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT: (To be filled in by individual proposing development) 1X6 AIIX4ED tWWIK�7 (11 n4i0n inr Brup" 0*10 r A for lvr✓'t�tilftlz 11-1 Of�ELtN Op-1 V Mailing Address NEW _2-1,j City/State/Zip Telephone Number PAf—fl N OEEW AU-) e N',Ale (Riparian Property Owner Information) o_ �k� Z�� 61 'Sigfiature D , Print or Type Name Are e Telephone Number �Jrj�I?i Date C u e7AT-C I uwr? OV I VE) 4 Distance across river 300' on left side 325' on right side no dock/pier exists on on left side to establish existing pier headline 18'-0" 14'-0" 27'-4" o" - - - - - - - ro" Craven County does NOT warrant the information shown on this map and should be used ONLY for tax assessment purposes. 1 inch equals 234 feet A ADJACENT RIPARIAN PROPERTY OWNER STATEMENT (FOR A PIER/MOORING PILINGSIBOATLIFTBOATHOUSE) I hereby certify that I own property adjacent to .—k I-� I7E&7A Z.' (Name of Property Owner) I property located at 67A7-GW0-0 I? PP I V , (Lot, Block, Road, etc.) on �Q-t=l�'� �l�i'� , in �/�� L���I�J , N.C. (Waterbody) (Town and/3/or County) Applicant's phone ALPH J�( `-'WD Mailing Address: �I 190C its f?EAV-- 1laUrJA N(67UCZ&A 677-fr77 He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. I understand that a pier/mooring pilings / boatlift / boathouse must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) ltvlTFYI� I do not wish to waive I do wish to waive that setback requirement. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT: (To be filled in by individual proposing development) l71AZT% DI�rW 1�1L 1 fbi L n— Mailing Address NW (%h�r�j w-i 2Q)50Z City/State/Zip i0 Telephone Number Ly('t�UokLokrQ (Riparian Property Owner Information) Signature Print or Type Name Lp*ru-1 Telephone Number -3 / / lx_— Date Distance across river 300' on left side 325' on right side no dock/pier exists on on left side to establish existing pier headline 27'-4" 7. 1 zpa ----------------------- 07 15 u N ::;_ , Craven County does NOT warrant the information shown on this map 1 inch equals 234 feet and should be used ONLY for tax assessment purposes.