HomeMy WebLinkAbout59634_SEGAL TRUST_20120319❑ CAMA / ❑ DREDGE & FILL F
GENERAL PERMIT Previous permit#
❑New ❑Modification ❑Complete Reissue El Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC
s ❑Rules attached.
Applicant Name Project Location: County
Address Street Address/ State Road/ Lot #(s)
City State ZIP
Phone # O Fax # Subdivision
Authorized Agent i c'a s_ ? City ZIP
Affected ❑ CW ❑ EW ❑ PTA []ES ❑ PTS Phone # ( ) River Basin'<..!,�.!'a
AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A Adj. Wtr. Body (nat /man /unkn)
❑ PWS: ❑FC:
ORW: yes / no PNA yes / no Crit.Hab. yes / no Closest Maj. Wtr. Body
Type of Project/ Activity
_.■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■■■■■■■■
. • . -
:..
•
■■�i■■■■■■■■■■■■■■■�i■■■■■■■■■■■■■■■■■■■■■■
SEEM
MEN
MMANAUMMMEM
MEN
■■■■■■■■■■■r.1cI.�lrei■■■/�CJ1il�!!
'a■Lt�.��'�■■■■■■■■
■■®■■■■
►1I"■0■l■Ill
goLv%■■■M■■M.■■■■■■
■■■■■
■■■■■®■■■■■■■■■■■■■■■■■■■®■■■■■■■■■■■
■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
■■
■
■■■■■■■■■■■■■■■■■■■■■■■■■
■■
■■■�■■■■■■■■■■■■■■®■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
• M■■■■E■■■■■�■■■■■■E■■■■■■■■■■■■■■■�■■■■EM
■■■■■M■■■■■■■■■■■■■■■■W■■
■■■
ONE■■■■■■■■■�
fib..
•j _
Agent or Applicant Printed Name Permit Officer's Signature
Signature ** Please read compliance statement on back of permit
Application Fee(s)
Check #
Issuing Date
Local Planningjurisdiction
i Expiration Date
Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office
Mailing Address:
1638 Mail Service Center
Raleigh, NC 27699-1638
Location:
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax: 919-733-1495
Morehead City Headquarters
400 Commerce Ave
Morehead City, NC 28557
252-808-2808/ 1-888ARCOAST
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax: 910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 08/09/06
ELKS DECKS N' DOCKS CONSTRUCTION, LLC
z.
N--- 1483 CRUMP FARM RD.
OCKS NEW BERN, NC 28562
(252) 637-1595 DL 8929001
Construction, LLC �J
PAY TO E ORDER OF
• f
1� 20J-
8288
66-112/531
4
��•imunu.n
COLLARS •«
BRANCH BANKING AND TRUST COMPANY
800-BANK-BBT bbt.com
FOR �GC"? C 1' ✓ G��.�a��� nm
11@008 28811' 1:0 5 3 LO L L 2 0:000 5 L9 56 26 296i1'
JIf
BUFFER AUTHORjZATION CERTi =ICATE
FOR PIER ND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico &
+Meuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0233 & .0259.
The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of
Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies
with the aforementioned regulations, and made a "no practical alternatives" determination per those
regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer
Authorization as long as the project is constructed in a manner that continues to meet all of the conditions
listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party
(contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per
violation.
1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM.
The alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of
pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules
to the maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way.
This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the conditions listed a ove and
verify that all information provided is complete and accurate.
���en
or Zrt Printed Name Permit Officer' Signature
06J-e*or Applicant Signature Issue Oate
CAMA GENERAL PERMIT #: �06_3' I C
Washington Office Morehead City Office
943 Washington Square Mall 400 Commerce Avenue
Washington, NC 27889 Morehead City, NC 28557
Phone252-946-6481 Phone252-808-2808
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper
Version 5, 09/2009
Feb 23 12 07:50a Jon Segal 949 489-3826 p.1
N.C. DIVISION OF COASTAL MANAGEMENT
AGENT AUTHORIZATION FORM
Date
Name of Property Owner Applying for Permit:
!!5--- -�4 1 k""Jdca 4K IfaS t7,oN i,l d �CS, i rd s�-e-L
Mailing Address:
lc'oL44-t 191- la �
Gr77
I certify that I have authorized (agent) _L�S4�5 S asap' t to act on my
behalf for the purpose of applying for and obtaining all CANU Permits necessary to
install or construct (activity) _ /L q d L 0 �
at (my property located at) -- Y f a j P��„�
NGw .SxF�+ (jG
This certification is valid thru (date) O—C c 3 r 2 0 i Z
Property wnerSignature
1/ I Utz -
Date
Connell, Brad
From: Jason & Miranda Hill [decksndocks@embarqmail.com]
Sent: Thursday, March 15, 2012 3:00 PM
To: Connell, Brad
Cc: ham.ks4o@gmail.com; rw@liggettdesigngroup.com; jonsegal@rocketmail.com
Subject: Re: Permits in Riverbend
Sounds good ... meet Jason at 10am Monday at the little Riverbend store parking lot. He'll take
you to the first place.
Thanks!
Miranda
On Thursday, March 15, 2012, at 01:49 PM, Connell, Brad wrote:
> How is Monday morning at 10am ?
> B
> -----Original Message -----
> From: Jason & Miranda Hill[mailto:decksndocks(@embargmail.com]
> Sent: Thursday, March 15, 2012 12:24 PM
> To: Connell, Brad
> Cc: ham.ks4o(@gmail.com; rw(@liggettdesigngroup.com;
> ionsegalprocketmail.com
> Subject: Permits in Riverbend
> Brad:
> I have (2) places for you to go to in Riverbend. The first one is at
> 418 Gatewood Drive and the other one is at 214 Gangplank Road. I left
> you a message this morning but I know it's easier to contact you by
> email. Let me know what your schedule is ... the sooner the better.
> Thanks!
> Miranda
> Decks N' Docks Construction, Inc.
1
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
(FOR A PIER/MOORING PILINGSBOATLIFTBOATHOUSE)
I hereby certify that I own property adjacent to J U l-4 ``���-� J t'Z i is
(Name of Property Owner)
property located at ` f �' &,7AT Gl,'' C C l vE
r? (Lot, Block, Road, etc.)
on V , in 6 0- A V & , N.C.
(Waterbody) yy� (Town and/or County)
Applicant's phone #: ���" d J"`�/C ' ailing Address:K—
L/iC�u,NA ^067vc-L CA qP&-7'7
He has described to me, as shown below, the development he is proposing at that location, and, I
have no objections to his proposal. I understand that a pier/mooring pilings / boatlift / boathouse
must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless
waived by me. (If you wish to waive the setback, you must initial the appropriate blank
below.)
I N iTiR�.,
I do not wish to waive
I do wish to waive that setback requirement.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT:
(To be filled in by individual proposing development)
1X6 AIIX4ED tWWIK�7
(11 n4i0n inr Brup" 0*10 r A
for lvr✓'t�tilftlz
11-1 Of�ELtN Op-1 V
Mailing Address
NEW _2-1,j
City/State/Zip
Telephone Number
PAf—fl N OEEW AU-)
e
N',Ale
(Riparian Property Owner Information)
o_ �k� Z��
61 'Sigfiature
D ,
Print or Type Name
Are
e
Telephone Number
�Jrj�I?i
Date
C u e7AT-C I uwr? OV I VE)
4
Distance across river 300' on left side
325' on right side no dock/pier exists on
on left side to establish existing pier headline
18'-0"
14'-0"
27'-4"
o"
- -
- - - - - ro"
Craven County does NOT warrant the information shown on this map
and should be used ONLY for tax assessment purposes.
1 inch equals 234 feet
A
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
(FOR A PIER/MOORING PILINGSIBOATLIFTBOATHOUSE)
I hereby certify that I own property adjacent to .—k I-� I7E&7A Z.'
(Name of Property Owner)
I
property located at 67A7-GW0-0 I? PP I V ,
(Lot, Block, Road, etc.)
on �Q-t=l�'� �l�i'� , in �/�� L���I�J , N.C.
(Waterbody) (Town and/3/or County)
Applicant's phone ALPH J�( `-'WD Mailing Address: �I 190C its f?EAV--
1laUrJA N(67UCZ&A 677-fr77
He has described to me, as shown below, the development he is proposing at that location, and, I
have no objections to his proposal. I understand that a pier/mooring pilings / boatlift / boathouse
must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless
waived by me. (If you wish to waive the setback, you must initial the appropriate blank
below.)
ltvlTFYI�
I do not wish to waive
I do wish to waive that setback requirement.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT:
(To be filled in by individual proposing development)
l71AZT% DI�rW 1�1L 1
fbi
L n—
Mailing Address
NW (%h�r�j w-i 2Q)50Z
City/State/Zip
i0
Telephone Number
Ly('t�UokLokrQ
(Riparian Property Owner Information)
Signature
Print or Type Name
Lp*ru-1
Telephone Number
-3 / / lx_—
Date
Distance across river 300' on left side
325' on right side no dock/pier exists on
on left side to establish existing pier headline
27'-4"
7.
1 zpa
-----------------------
07
15
u
N
::;_ ,
Craven County does NOT warrant the information shown on this map 1 inch equals 234 feet
and should be used ONLY for tax assessment purposes.