HomeMy WebLinkAbout59682_SCHEBER, THOMAS_20111208nCAMA / ❑ DREDGE & FILL
GENERAL PERMIT
❑New ❑Modification ❑Complete Reissue ❑Partial Reissue
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC
,f [ i
A 1' N ,- P L C
pp scant ame__
Address
City
Phone # ( )
Authorized Agent
Affected ❑ cW
AEC(s): ❑ OEA
❑ PWS:
ORW: yes / no
State ZIP
Fax # ( )
❑ EW ❑ PTA ES ❑ PTS
❑ HHF ❑ IH UBA ❑ N/A
❑ FC:
PNA yes / no Crit.Hab. yes / no
Previous permit #
Date previous permit issued
roiect ocation: ounty
Street Address/ State Road/ Lot #(s)
Subdivision
❑ Rules
City ZIP
Phone # ( ) River Basin
Adj. Wtr. Body nat /man /unkn)
Closest Maj. Wtr. Body
Type of Project/ Activity
(Scale:
Pier (dock) length
Platform(s) i
Finger pier(s)
Groin length
number
If
Bulkhead/ Riprap length i {
avg distance offshore r i
max distance offshore
Basin, channel
cubic yards
Boat ramp
Boathouse/ Boatlift
I
r
I,
'I
--
—
—
Beach Bulldozing
Other
1"
I'•
Shoreline Length
SAV: not sure yes no
Sandbags: not sure yes no
Moratorium: n/a yes no
Photos: yes no
Waiver Attached: yes no
A buildingb
permit may be required y:
Notes/ Special Conditions
I di"
+
1
E:-T-
y
'
�f
's sn
i .
'�
;1
j
'
f
0 See note on back regarding
River Basin
rules.
Agent or Applicant Printed Name
Permit Officer's Signature
Signature ** Please read compliance statement on back of permit **
Issuing Date Expiration Date
Application Fee(s) Check # Local Planning Jurisdiction Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certifythat this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office
Mailing Address:
1638 Mail Service Center
Raleigh, NC 27699-1638
Location:
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax:919-733-1495
Morehead City Headquarters
400 Commerce Ave
Morehead City, NC 28557
252-808-2808/ 1-888ARCOAST
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax:252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax: 910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 08/09/06
CDENR
North Carolina Department of Environment and Natural R.-sources
Division of Coastal Management
Beverly Eaves Perdue Jarnes H. Gregson Dee Freeman
Governor Director r r
------. Secreta, v
BUFFER AUTHORIZA.PON CERT�FICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins
per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0259 & 0233. The Division of Coastal Management
(DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project
proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical
alternatives" determination per those regulations.
Those activities covered by your Coastal Area Management Act (LAMA) permit have received Buffer Authorization as
long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply
with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction &/or
land clearing to a civil penalty of up to $25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either
the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what rnust be
impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the
buffer is a violation of the riparian buffer rules.
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
a. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
5. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per
acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re-
established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would
remove understory vegetation is allowed.
• Pre -project site conditions: LX ,LG✓� f r1q_ r _p �ap ,
Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and
construction corridors. This drawing will be used to aid in Compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
information is complete and accurate.
Agent or pplica rinted Name Permit Officer's Signature
Agent or pplic Signature Issue IYatel
LAMA GENERAL PERMIT #:
Washington Office . Morehead City Office
943 Washington Square Mail 400 Commerce Avenue OneWashington, NC 27889 Morehead City, NC 28557 1VQrthCarolina Phone 252-946-6481 Phone 252-808-2808 ���������
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper
Version 5, 09/2009