Loading...
HomeMy WebLinkAbout59615_RUINKE, JOHN_20111222❑CAMA / [:]DREDGE & FILL GENERAL PERMIT El New ❑Modification ❑Complete Reissue El Partial Reissue As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC Previous permit # Date previous permit issued ❑ Rules attached. Applicant Name Project Location: County Address Street Address/ State Road/ Lot #(s) City State ZIP�,�' Phone # O Fax # ( ii Authorized Agent Affected ❑ CW ❑ EW ❑ PTA ❑ ES ❑ PTS AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A ❑ PWS: ❑FC: ORW: yes / no PNA yes / no Crit.Hab. yes / no Subdivision City ZIP Phone # () River Basin Adj. Wtr. Body (nat /man /unkn) Closest Maj. Wtr. Body Type of Project/ Activity (Scale: `; ) Pier (dock) length Platform(s) Finger pier(s) Groin length ` number Bulkhead/ Riprap length avg distance offshore max distance offshore Basin, channel cubic yards Boat ramp Boathouse/ Boatlift Bulldozing- Beach Other i Shoreline Length SAV: not sure yes no Sandbags: not sure yes no Moratorium: n/a yes no Photos: yes no Waiver Attached: yes no A building permit may be required Notes/ Special Conditions l �: + _ _' 4- ' - - - --1 - - i - - — - , - - - - -- � I - l_ #1 by: ❑ See note on back regarding River Basin rules. Agent or Applicant Printed Name Signature ** Please read compliance statement on back of permit Permit Officer's Signature r a Issuing Date Expiration Date Application Fee(s) Check # Local Planningjurisdiction Rover File Name 41 Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Morehead City Headquarters Mailing Address: 400 Commerce Ave 1638 Mail Service Center Morehead City, NC 28557 Raleigh, NC 27699-1638 252-808-2808/ 1-888-4RCOAST Location: Fax: 252-247-3330 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax:910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 Agent or Applicant Signature CAMA GENERAL PERMIT #: :14AL Washington Office Morehead City Office 943 Washington Square Mall 400 Commerce Avenue Washington, NC 27889 Morehead City, NC 28557 Phone 252-946-6481 Phone 252-808-2808 A�� NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue James H. Gregson Dee Freeman Governor Director Secretary BUFFER AUTHORIZATION CERTIFICATE FOR PIER AND DOCKING FACILITIES ACCESS WAY A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico & Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0233 & .0259. The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical alternatives" determination per those regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per violation. 1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way. This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the conditions listed above and verify that all information provided is complete and accurate. Permit Officer's Signature f� Issue Dale An Equal Opportunity/Affirmative Action Employer — 50% Recycledl10% Post Consumer Paper Version 5, 0912009 Awf'A& ACDENR North C c-rolina Department of Environment :Ind Natural Resources Division of Coastal Manac, ement F I G son nirec' or i)ee Freeman, Secretary Beverly Eaves Perdue, Gov�r:ior James . reg , Date Applicant Nama — j cc,. Mailing Address l certify that I have authorized (agent) _�,'a�r 4 _ to act on mty behalf, for the ipurl3c'se of applying fq ttnd obtaining a,1, CAMA Permits necessary to install or construct (activity)7 1C, ti at (location)G C", -e c, - This certifi Signature cati.o �r `l tI`'r% ( te) 400 Commerce Aveni ie, Morehead City, North Carolin2i 28557 Phone: 252.808-28C8 \ FAX; 252.247-3330 \ Intern t: www.nccoa:3talmanagement.net An Fq jat Opportunity 1 Affirmative A ction Employer — 50% f :acycfed \ 10% Post 'onsumer Paper C J c a I s Cr e I IAV ConnectGIS Page I of 1 1:100 feet http://carteret.connectgis.com/MapIPrintW indow.aspx?Map=http:Hcarteret.connectgis.co... 12/22/2011