HomeMy WebLinkAbout59615_RUINKE, JOHN_20111222❑CAMA / [:]DREDGE & FILL
GENERAL PERMIT
El New ❑Modification ❑Complete Reissue El Partial Reissue
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC
Previous permit #
Date previous permit issued
❑ Rules attached.
Applicant Name Project Location: County
Address Street Address/ State Road/ Lot #(s)
City State ZIP�,�'
Phone # O Fax # ( ii
Authorized Agent
Affected ❑ CW ❑ EW ❑ PTA ❑ ES ❑ PTS
AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A
❑ PWS: ❑FC:
ORW: yes / no PNA yes / no Crit.Hab. yes / no
Subdivision
City ZIP
Phone # () River Basin
Adj. Wtr. Body (nat /man /unkn)
Closest Maj. Wtr. Body
Type of Project/ Activity
(Scale: `; )
Pier (dock) length
Platform(s)
Finger pier(s)
Groin length `
number
Bulkhead/ Riprap length
avg distance offshore
max distance offshore
Basin, channel
cubic yards
Boat ramp
Boathouse/ Boatlift
Bulldozing- Beach
Other
i
Shoreline Length
SAV: not sure yes no
Sandbags: not sure yes no
Moratorium: n/a yes no
Photos: yes no
Waiver Attached: yes no
A building permit may be required
Notes/ Special Conditions
l
�:
+
_ _'
4-
'
- - - --1
-
- i
-
-
— -
,
-
-
-
-
--
�
I
-
l_
#1
by:
❑ See
note
on back regarding
River Basin
rules.
Agent or Applicant Printed Name
Signature ** Please read compliance statement on back of permit
Permit Officer's Signature
r a
Issuing Date
Expiration Date
Application Fee(s) Check # Local Planningjurisdiction Rover File Name
41
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office Morehead City Headquarters
Mailing Address: 400 Commerce Ave
1638 Mail Service Center Morehead City, NC 28557
Raleigh, NC 27699-1638 252-808-2808/ 1-888-4RCOAST
Location: Fax: 252-247-3330
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax:919-733-1495
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax:252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax:910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 08/09/06
Agent or Applicant Signature
CAMA GENERAL PERMIT #: :14AL
Washington Office Morehead City Office
943 Washington Square Mall 400 Commerce Avenue
Washington, NC 27889 Morehead City, NC 28557
Phone 252-946-6481 Phone 252-808-2808
A��
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Beverly Eaves Perdue James H. Gregson Dee Freeman
Governor Director Secretary
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico &
Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0233 & .0259.
The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of
Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies
with the aforementioned regulations, and made a "no practical alternatives" determination per those
regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer
Authorization as long as the project is constructed in a manner that continues to meet all of the conditions
listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party
(contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per
violation.
1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM.
The alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of
pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules
to the maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way.
This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the conditions listed above and
verify that all information provided is complete and accurate.
Permit Officer's Signature
f�
Issue Dale
An Equal Opportunity/Affirmative Action Employer — 50% Recycledl10% Post Consumer Paper
Version 5, 0912009
Awf'A&
ACDENR
North C c-rolina Department of Environment :Ind Natural Resources
Division of Coastal Manac, ement
F I G son nirec' or i)ee Freeman, Secretary
Beverly Eaves Perdue, Gov�r:ior James . reg ,
Date
Applicant Nama —
j cc,.
Mailing Address
l certify that I have authorized (agent) _�,'a�r 4
_ to act on mty
behalf, for the ipurl3c'se of applying fq ttnd obtaining a,1, CAMA Permits necessary to
install or construct (activity)7
1C, ti
at (location)G
C", -e c, -
This certifi
Signature
cati.o �r `l tI`'r% ( te)
400 Commerce Aveni ie, Morehead City, North Carolin2i 28557
Phone: 252.808-28C8 \ FAX; 252.247-3330 \ Intern t: www.nccoa:3talmanagement.net
An Fq jat Opportunity 1 Affirmative A ction Employer — 50% f :acycfed \ 10% Post 'onsumer Paper
C
J c
a
I
s
Cr e
I
IAV
ConnectGIS
Page I of 1
1:100 feet
http://carteret.connectgis.com/MapIPrintW indow.aspx?Map=http:Hcarteret.connectgis.co... 12/22/2011