Loading...
HomeMy WebLinkAbout58378_NC DOT_20120207❑CAMA / ❑ DREDGE & FILL GENERAL PERMIT Previous permit# ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC [-]Rules attached. Applicant Name_ Address_ City Phone # O_ Authorized Agent Affected ❑ Cw AEC(s): ❑ OEA ❑ PWS ORW: yes / no State Fax # ( ) ❑ EW ❑ PTA ❑ HHF ❑ IH ❑ FC: PNA yes / no ZIP ❑ ES ❑ PTS ❑ UBA ❑ N/A Crit.Hab. yes / no Ui Project Location: County Street Address/ State Road/ Lot #(s) T �! a Subdivision City ZIP Phone # (i) River Basin Adj. Wtr. Body (nat /man /unkn) Closest Maj. Wtr. Body Type of Project/ Activity (Scale: ) Pier (dock) length Platform(s) Finger pier(s) j Groin length number Bulkhead/ Riprap length avg distance offshore max distance offshore Basin, channel cubic yards Boat ramp Boathouse/ Boatlift Beach Bulldozing Other - c r i a i i I i j I 0 Shoreline Length SAV: not sure yes no Sandbags: not sure yes no Moratorium: n/a yes no Photos: yes no i Waiver Attached: yes no A building permit may be required by: ❑ See note on back regarding River Basin rules. Notes/ Special Conditions Agent or Applicant Printed Name Permit Officer's Signature Signature ** Please read compliance statement on back of permit Issuing Date Expiration Date Application Fee(s) Check # Local Planning Jurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888ARCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax:910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 Applicant: P-0-7— Date: a—% — 1 Z Gas-"P3-1,P Describe below the HABITAT disturbances for the application. All values should rnatch the name, and units of measurement found in your Habitat code sheet. Habitat Flame DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or impacts) FILIAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or tamp impacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount U-T) CL V-1 " Dredge ❑ Fill ❑ Both ❑ Other p" —tamp Dredge ❑ Fill [Both ❑ Other ❑ 4S j J / u r bredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ , Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other Cl k '4252- ,Wr•a a3 .. 'i•',,133r,;'1C0A3T +.nv:+r.n� _... ,.o. •,•:.�,:4::-A,r �'r',a;arr h� i 7•i .fps;<•;•., t"+'1'r]1f b]+.'�aT'i •^', iY «_naf �X * NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue Braxton C. Davis Governor Director February 7, 2012 NCDOT c/o Clay Willis 113 Airport Dr., Suite 100 Edenton, N.C. 27932 Dear Mr. Willis: Dee Freeman Secretary Attached is General Permit #58378 C to construct a 25' X 55' bridge to replace the existing 25' X 34' bridge over Middleton Creek, Edenton, North Carolina. In order to validate this permit, please sign the permit as indicated. Retain the white copy for your files and return the signed yellow and pink copies to us in the enclosed, self-addressed envelope. If the signed permit copies are not returned to this office before the initiation of development, you will be working without authorization and will be subject to a Notice of Violation and subsequent civil penalties. We appreciate your early attention to this matter. Sincerely, Stephen Lane Coastal Management Representative rcb Enclosures 400 Commerce Ave., Morehead City, NC 28557 Phone: 252-808-28081 FAX: 252-247-3330 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer NorthCarolina Naturally SCAT[ STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Beverly E. Purdue GOVERNOR January 19, 2012 Stephen Lane NC Division of Coastal Management 400 Commerce Ave. Morehead City, NC 28557 Dear Mr. Lane, RECEIVED JAN 2 3 2012 DCM-AIHD CITY Gene Conti SECRETARY The NCDOT request the issuance of a General Permit .2300 for the replacement of Low Impact Project - Bridge # 01 in Chowan County. The bridge is located on SR 1100 approximately 1.07 miles east of the intersection of SR 1102. The bridge spans Middleton Creek, which is a tributary to the Yeopim River. Middleton Creek is classified by DWQ as class "C, Sw" waters. Bridge # 01 is currently a wooden structure with a concrete deck that is 34 ft. long by 25 ft. wide. This structure will be removed using NCDOT's guidelines for bridge removal. The proposed bridge will be replaced on its existing alignment. The new bridge structure will be 55' in length by 25' wide and built with precast cored slab concrete deck, concrete piles and concrete end bents. An off -site detour will be utilized during construction. There are no coastal wetlands associated with this project. This bridge is following the Low Impact Bridge Process established by FHWA, NCDOT and Regulatory Agencies. Included with this letter are the location map, permit drawings, MP-1 form and Low Impact Data Sheet. If you have questions please call me at (252) 482-7977. The permit fee can be charged to WBS # 45347.1.BDI Sincerely, Jerry Jennings Division One Engineer Clay Willis al� 6;1, Division One Environmental Officer 113 Airport Dr., Suite 100, Edenton, NC 27932 — Phone: (252) 482-7977 Fax: (252) 482-8722 kec,c �D Bridge Replacement # 1 on SR 1100 (Drumonds Point Rd.) I k/ IAI7n (' I inhi 0 0.5 1 2 Miles L I I I I I I I I - t- `r f rtt k. ♦ a i ot5='4 ON MP-1 APPLICATION for //cry �. Major Development Permit 2 ,y 1�;2 (last revised 12127106) 1) _ North Carolina DIVISION OF c:' A TAL MANAGEMENT 1. Primary Applicant/ Landowner Information Project Name (if applicable) Business Name LOW IMPACT Bridge # 01 on SR 1100 N.C. Department Of Transportation (Drummond's Point Road) Applicant 1: First Name MI Last Name Clay Willis Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State 113 Airport Road, Suite 100 Edenton NC ZIP Country Phone No. FAX No. 27932 252 - 482 - 7977 ext. 252 - 482 - 8722 Street Address (if different from above) City State ZIP Email 2. Agent/Contractor Information Business Name Agent/ Contractor 1: First Name MI Last Name Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State ZIP Phone No. 1 - - ext. Phone No. 2 - - ext. FAX No. Contractor # Street Address (if different from above) City State ZIP Email <Form continues on back> Form DCM MP-1 (Page 2 of 5) s, RECEIVED APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address DC,1r State Rd. # Chowan SR 1100 i 1.05 miles east of the intersection wATffi='SR,4i SR 1100 Subdivision Name City State Zip Edenton (Yeopim Area) NC 27932 - Phone No. Lot No.(s) (if many, attach additional page with list) - - ext. I I I , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Pasquotank Middleton Creek c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Yeopim River e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ❑Yes ®No work falls within. 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 120' 24000 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) (If many lot sizes, please attach additional page with a list) 2-3 feet ❑NHW or ®NWL e. Vegetation on tract Various roadside grasses on the maintained road shoulder. The adjacent wetland contains freshwater riverine wetland species,such as Taxodium distichum, Nyssa aquatica, Carex spp., Polygonum spp., Saururus cernuus, Impatiens capensis and other species associated with riverine wetlands. f. Man-made features and uses now on tract SR 1100 Drummonds Point Road g. Identify and describe the existing land uses adiacent to the proposed project site. Adjacent land use is primarily in woodland, row crop agriculture and rural residential. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? NIA (Attach zoning compliance certificate, if applicable) ❑Yes ❑No ®NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> m. (i) Are there wetlands on the site? ®Yes ❑No (ii) Are there coastal wetlands on the site? ❑Yes ®No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ®Yes ❑No (Attach documentation, if available) 5 - - 0 . 1- 8-4i T ,. wwwnccoasta Imanagernent,net s Form DCM MP-1 (Page 3 of 5) APPLICATION for Major Development Permit n. Describe existing wastewater treatment facilities. None '1A AV 2 3 z�12 o. Describe existing drinking water supply source. 0CAf 11RDCI None 7i' p. Describe existing storm water management or treatment systems. None 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ®Public/Government ❑Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. This project will provide safe transportation along SR 1100 by replacing an existing bridge crossing over Middleton Creek. Once the bridge is replaced the roadway facility will continue to provide connectivity and safe access for the traveling public living and traveling through this area of Chowan County. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. The bridge will be replaced using top down construction techniques utilizing precast concrete structures (piles,caps,deck). The new bridge will be replaced on its existing alignment, with additional width to allow for current design standards and safety improvements. The bridge will be constructed using a crane, excavator, dumptrucks, pavers and various other types of construction equipment. d. List all development activities you propose. The existing 34' long x 25' wide bridge will be entirely removed using NCDOT guidelines for bridge removal. The new bridge will increase the horizontal floodway by extention to a 55' long x 25' wide bridge. The new bridge will consist of 1 concrete span supported by concrete end bents and girders. This bridge will be replaced on the existing alignment, causing a temporary road closure. Traffic will be detoured along available routes. Wetland Impacts have been avoided and minimized to the maximum extent practicable. The resulting impacts are 5.1 sq. feet of permanent suface water impacts and 253 sq. feet of temporary wetland impacts associated with hand clearing for erosion control device maintenance area. The removal of bridge approach fill will restore flood lain elevations as shown in the bride profile drawing. e. Are the proposed activities maintenance of an existing project, new work, or both? Maintenance of an existing bridge. f. What is the approximate total disturbed land area resulting from the proposed project? 20000 ®Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. Surface runoff from the paved roadway of SR 1100. i. Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA j. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. <Form continues on back> 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. 52-808- .a 1w8 =4 A T — ww-nccoa talmanage►rsent,net Form DCM MP-1 (Page 4 of 5) APPLICATION for Major Development Permit b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Joseph Campen Webb Phone No. r Address 249 Drummond's Point Road Edenton, NC 27932 4N Name Margaret Ann Campen Shaver ��?�% Phone No. �cti� cITY Address 143 Gumberry Road Ayden, N.C. 28513 Name Black Swan Investments LLC Phone No. Address 306 Drummond's Point Road Edenton, N.C. 27932 g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. None h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. 28 2 Po8 0 8- 2 6 0 8 s, 1-888-4RCOAST www. ccoastalmana err ent,ne Form DCM MP-1 (Page 5 of 5) APPLICATION for Major Development Permit Date 01/19/2011 Print Name _Clay Willis, Environmental Officer Signature Please indicate application attachments pertaining to your proposed project. ❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development ❑DCM MP-4 Structures Information �cEjvEd ✓41 V 9 4Dc4�D crT�, S Po 8-280 1ra888-4 3AST . www.nccoastaIrnanae t.n t Low/Minimal Impact Bridge Project Data Sheet TIP NO BD4101K WBS 45347.1.BD1 County Chowan County Bridge Number Bridge g01 Description Replacement of Bridge 4 01 on SR-1100 (Drumonds Point Road) over Middleton Creek Stream Basin Pasquotenk Basin 8 digit hucode 03010205 Classification Class "C: SW SIN OWO Index a304-2 Middleton Creek Type Warm I Warts Size channel at the bridge site was •1- 30 feel wile Existing Structure Type Reinforced Conc.floor on tlmberjoist; EBTS & ISTS Timber caps!Timber Plies Size Bridge Is 2 span @ 17' with a dear roadway width of 24 feet Suff. Rating Surr. Rating 73.6 Not Poeted Proposed Structure Type Cored Slab Bridge Size Preliminary; 1 @ 55' Cored Slab, 90 degree skew, 24 R clear roadway; 1.2 fool grade change Stream USACE Impacts (LF) COE Jurisdictional Stream Present do to bridging mere should be no stream Impacts Non 404 Impacts (LF) not a name Wetlands USACE Impacts (AC) wetland Impacts will be within me mreshold far NW3 Permits from the COE Mon 404Impacts (AC) not.ppti-b(. CAMA Impacts (AC) Public Trust Waters I No Came Wetlands I CAMA GP required NC DWO Buffers Impacts (SF) None Buffer Application Required (>40 it) (YIN) No NC DWG StomiWater Permit Required (YIN) Permit Required (YIN) No T&E Habitat (y/n) No habitat present for Bald Eagle (BGPA) Species Present No Habitat Present Bio Conclusion No affect Moratorium Type Anedramous Fish Spawning Area Dates February 15m- June 15m Trout Waters NativelHatchery not applicable Trout Species Present not applicable Trout Conditions (YIN) not aPp-c WRC Reviewer out applicable CAMA AECs Public Trust waters Essential Fish Habitat (yin) No Nev. Opening 1.8 feet vertical clearance from LSEL to WSEL USCG Permit None Historic Properties No survey Regdred - No Properties present I ellectad Archaeological Resources No further survery Required Tribal Lands None 401 Resources None 6(f) [LWCF) Resources None Wild and Scenic River None Forest Service Lands MO1e TVA Area None FEMA Buyout None FEMA Flood Study Redelinated Story USTs Haz Mats None Relocatees NOAe Location LAT ]6.1194 LONG -76.769 Project Comments A Completed by. A 14k /1 Lead Engi r _ / Division Environmental Officer �CD ✓qN 2 2012 lclf-n`IzDctrk 911012011 �o c D L Ci L E a Y_ O L(1 CO t E Q) a- O C c E c c C i O c 0 Ln �o am p�C N�— tid\ See Sheet 1-A For Index of Sheets >7 e Sap BCB 3) ter• ^a� °B -.0 YmP+>n •` � . 1 . ram`. � tiox 1t� o t,Do 1 Po nrW! i1t0 n 6 O C PRE SI R o ®n= 32 S-d, Pb' 0 O X GQ+CO i iS3� SO -dD B5101K VICINITY MAP OFF -SITE DETOUR STATE OF NORTH HIGHWAYS �CAROILIN DIVISION �/�fA� GLI CHO WAN COUNTY LOCATION: BRIDGE NO.1 OVER MIDDLETON CREEK ON SR 1100 (DR UMMOND POINT RD. ) TYPE OF WORK: GRADING, DRAINAGE, PAVING & STRUCTURE WETLAND/'SURFACE WATER PERMIT DRAWINGS 4 - 1 +9 .88 SR 1100 (DRUMMOND POINT RD.) BEGIN NCDOT PROJECT R-5101K p END BRIDGE END NCDOT PROJECT B-5101K - STA -L- STA. 10 + 46.00 . 12 + 57.13 -L- STA. 14 + 16.00 i CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. GRAPHIC SCALES 50 25 0 50 100 PLANS 50 25 0 50 100 PROFILE (HORIZONTAL) 10 5 0 10 20 PROFILE (VERTICAL) DESIGN DATA ADT 2012 = 390 ADT 2032 = 590 DHV = 10 % D = 50 % T = 8 % ' V = 55 MPH * TTST = 3% DUAL 5% FUNC CLASS = LOCAL SUBREGIONAL TIER Prepared jot the North Carolina Department PROJECT LENGTH W/ of Transportation in the Office of. ETHERILL .9 iON6 FAN41N —D ��. 2— ENGINEERING wH� 3,� LENGTH ROADWAY STATE PROJECT BD-5101J = 0.059 MILES 'p �;�n r .. nv ssi ewe LENGTH STRUCTURE STATE PROJECT BD-5101J = 0.011 MILES 20%STANDARD SPECIFICATIONS TOTAL LENGTH STATE PROJECT BD-510IJ = 0.070 MILES RIGHT OF WAY DATE: EDWARD G. WETHERILL, PE PROJECT ENGrAMER LETTING DATE: BOB A. MAY PE PROJECT DESIGN ENGINEER 9TAT. 9TAt4 P,1p,4Cr 48v.46Nc4 Np .H88T N0. TOrAL BH961] BD-5101 K Te PRW.Np P.A1RKNp D4BCT..rWN 45347.1.12 BRZ-1100 31 PE -D 40 Q 2 INCOMPLETE PLANS M NOT USE MR R/W ACQUISITION PRELIMINARY PLANS DO NOT USE -R CONSTRUCTION HYDRAULICS ENGINEER ROADWAY DESIGN ENGINEER P.E. DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA o; xo.vrq Tyb C�9 A. o� a t, — 11 57:9TE fIIGHWAY DESIGN ENGINEER J 0 a EXISTING BRIDGE NO.01 PROPOSED BRIDGE 2 @ 17' SPAN, 24' CLEAR WIDTH 1 @ 55' SPAN 21" CORED SLAB RC FLOOR ON TIMBER JOIST 24 —10" CLEAR WIDTH STA. 12 + 28.50 SKEW = 90 CL GRADE ELEV. = 4.45' P1 +42.8i0 10 EL a 329' VC 72' K 49 V 35 MPH Q F (+JO. Ol/. 249 IDRUMMON EDENTON, NC -10 °.m'ETLAND/SUREACE WATER PERMIT DRAWINGS - pi + 12+205 EL - 4.67' VC - 80' K32 (+)1.75807. V 35 MPH (_)0.72857. 0 = --- i WSEL = —0.1 (8-25-11) PI - 13f40.37 VC w K - 96 V - 50 MPH (+)0.32/3% (_)0.0729% _ _ _ _ I ! I I I 11 1Z- 13 14 LLC 15 ENGINEER I ENGINEER INCOMPLE E PLANS DO NOT ump� /• ACQUMrMN PRELIMIN RY PLANS w NOf um mlmNS VCTwm 559 bru. Fm�Jlin Gd SuiM1 1M MoI.VM1. N.C. l]606 ETHERILL �^"^'•��n ENGINEERING a"` clv W N77 F— T9 4 9107 allwr F,Ow arsw cwww ariw ' if.OS . apgrYRaw ameba71O WETLANSURFACE IMPACTS IMPACTS WATER IMPACTS TEMP WETLAND IMPACTS (HAND CLEARING EXISTING CHANNEL IMPACTS SITE 1 0 3.3SF 253SF bLF SITE 2 0 1.7SF 0 31-F NOTE: ALL IMPACTED WETLANDS y ARE COE-404 WETLANDS. c NOTES: !) MODIFIED METHOD it CLEARING (HAND CLEARING) 2) LOCATED IN A CAMA COUNTY 3) PASOUOTANK RIVER BASIN 4) MIDDLETON CREEK IS A BLUE LINE ON THE USGS QUAD MAP 9.m DENOTES IMPACTS 1N SURFACE WATER ENTS LLC ® DENOTES HAND f Rd. CLEARING )' 0' 50, 100, 150' ;RAPHIC SCALE NOTES INSETS AT 300% SCALE EXISTING BRIDGE NO. 01 PROPOSED BRIDGE 2 @ 17' SPAN, 24' CLEAR WIDTH 1 @ 55' SPAN 21" CORED SLAB RC FLOOR ON TIMBER JOIST 24 -10" CLEAR WIDTH STA. 12 + 2 8.50 SKEW = 90 Ct GRADE ELEV. = 4.45' P1 _ // 042.80 10 EL 329' VC = 7r K49 V 35 MPH Ic IM 0 � h Ca.�Jpo'l t 166 WETLAND/SURFACE WATER PERMIT ®RAWINIGS PI - 12f205 EL - 4.67' VC.W K 32 +)1.75807. V 35 MPH WSEL = -0.1 (8-25-11) (—W2V5/ P/ 13 #4037 EC - 3.80' VC for K 96 V 50 MPH l +10.3213% 10 11 12 13 14 Ln 15 249 DRUMMOND'S POINT Rd. EDENTON, NC 27932 Olar-sweJ Av►v► �� 5hav"' 14 3 BLACK SWAN INVESTMENTS LLC 306 DRUMMOND'S POINT Rd. WW SHEET NO. DWAY DESIGN HYDRAUUC ENGINEER ENGINEER INCOMPLE E PLANS RO NOT VN{ 1'Olt /• ACOVmrmN PRBLIMIN 00 NOT " RY PLANS �VCr10N —1 7 ETHERS LL lyw�.�ib. Fo3) ENGINEERING Bi.. 9t9 a51 Bon im: 919 45l 810) fAlwwrOR ^Aftlglmp • MmI alp Oit/9►f aso • 86/0-5 • coIPARO dompnool WETLAND IMPACTS SURFACE WATER IMPACTS TEMP WETLAND IMPACTS (HAND CLEARING EXISTING CHANNEL IMPACTS SITE 1 0 3.3SF 253SF 6LF SITE 2 0 1.7SF 0 31-F NOTE: ALL IMPACTED WETLANDS ARE COE-404 WETLANDS. NU 1 tJ: 1) MODIFIED METHOD II CLEARING (HAND CLEARING) 2) LOCATED IN A LAMA COUNTY 3) PASOUOTANK RIVER BASIN 4) MIDDLETON CREEK IS A BLUE LINE ON THE USGS OUAD MAP DENOTES IMPACTS IN SURFACE WATER BLACK SWAN INVESTMENTS LLC ® DENOTES HAND 306 DRUMMOND'S POINT Rd. CLEARING EDENTON, NC 27932 50' 0' 50' 100, 150, GRAPHIC SCALE NOTEs INSETS AT 300% SCALE