Loading...
HomeMy WebLinkAboutGeneral Permits (2577)10 CERTIFICATION OF EXEMPTION FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203. ` i Applicant Name L f( l5 4 s t. f r: Phone Number 74�- - Address L,. City Project Location (County, State Road, Water Body, etc.) r State zip _ 7 G. 0 . A Type and Dimensions of Project The proposed project to be located and constructed as described above is hereby certified as exempt from the CAMA permit re- quirement pursuant to 15 NCAC 7K .0203. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal, or Local authorization. This certification of exemption from requiring a CAMA permit is valid for 90 days from the date of issuance. Following expiration, a re-examination of the project and project site may be necessary to continue this certification. SKETCH 1 i 6�r1 C a: (SCALE: ) tic - ,, r i Any person who proceeds with a development without the con- sent of a CAMA official under the mistaken assumption that the development is exempted, will be in violation of the CAMA if there is a subsequent determination that a permit was required for the development. The applicant certifies by signing this exemption that (1) the ap- plicant has read and will abide by the conditions of this exemp- tion, and (2) a written statement has been obtained from adjacent landowners certifying that they have no objections to the proposed work. Applicant's signature CAMA Official's signature Issuing date Expiration date Attachment: 15 North Carolina Administrative Code 7K .0203 Rules for Beach Bulldozing Beach bulldozing is a common method of erosion management that moves sand, usually to repair storm damage to an existing dune or to create a protective berm if the dune system has been completely washed away. Beach bulldozing may be permitted if you follow the general rules for development within an ocean hazard area of environmental concern, and BUkH UEEMI G TO RESTORE DUNES you follow these specific ■ If you are bulldozing under a aid W,A Ay9w*1tskzr rz8cr rt;°�' general permit, you must j' ��'•,-, OCEAN confine sand movement to landward of the normal high ERODED DUNE j water line. Moving sand that kka is seaward of the low water ; line requires a CAMA major - - permit and a state Dredge and Fill permit. ■ In order to minimize adverse impacts ■ to nesting sea turtles, no work shall occur after BEACH BUI OZING TO RESTORE DUNES October 18, 2003, without -- 3nda ¢cfxct be k00% prior approval from the L ei 1'W Wce 6%t Division of Coastal `ME1 We;t —mk;NWIffiv Management, in ,:; ``'`'" coordination with the N.C. a'�� -. OCEAN Wildlife Resources Commission, U.S. Fish and ova WAJIS 4E-Z � Wildlife Service and U.S. H sire h *:�" kX Army Corps of Engineers. _ �Wv; pe z'-, ■ The project should maintain a slope similar to normal conditions. The slope, or grade, of the project must not be so steep that it endangers the public or interferes with public use of the beach. ■ Bulldozer blades may not be lowered more than one foot as measured from the existing surface elevation. ■ Never bulldoze below mean low water. ■ General Permits limit the movement of sand from above mean high water only. ■ Beach bulldozing must not extend past the lateral boundary of your property, unless you have permission from the neighboring landowner. ■ This permit is to allow the creation of a protective berm or repair an eroded dune. It is not for the backfilling of undermined or damaged septic systems. Before covering a septic system, contact your local Health Department and Building Inspector to determine the extent of the damage, and whether a permit will be required to replace or relocate the system. ■ Remove debris, as it is uncovered. Do not bury or cover debris. • Make sure a copy of this authorization is on site during work.