Loading...
HomeMy WebLinkAbout30554_THE TOWN OF PINE KNOLL SHORES_20020513CAMA / DREDGE & FILL ^� � 30554 GENERAL PERMIT `t# Previous permit # New Modification Complete Reissue Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC Rules attached. Applicant Name Project Location: County Address CityState _ ZIP Phone # ( ) - `l-" Fax # ( ) Authorized Agent Affected CW EW [ l PTA R ES ❑ PTS AEC(s): OEA HHF ❑ IH ❑ UBA N/A PW S: ❑ FC: ORW: yes / no PNA yes / no. Crit. Hab. yes / no Type of Project/ Activity Pier (dock) length Platform(s) Finger pier(s) Groin length number Bulkhead/ Riprap length avg distance offshore max distance offshore Basin, channel cubic yards Boat ramp _ Boathouse/ Boatlift Beach Bulldozing Other Shoreline Length SAV: not sure yes no Sandbags: not sure yes no Moratorium: n/a yes no Photos: yes: no Waiver Attached: yes no A building permit may be required by: Notes/ Special Conditions Agent or Applicant Printed Name ,-- % `, Signature/ Please read compliance statement on back of permit Application Fee(s) Check # Street Address/ State Road/ Lot #(s) K Subdivision City Phone # ( )_ Adj. Wtr. Body Closest Maj. Wtr. Body ZIP_ River Basin (nat /man /unkn) (Scale: ) See note on back regarding River Basin rules. Permit Officer's Signature IssAng Date i Y Local Planning Jurisdiction Expiration Date Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certifythatthis project is consistentwith the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-395-3900) for more information on how to comply with thesebuffer rules. Division of Coastal Management Offices Central Office Elizabeth City District Mailing Address: 1367 U.S. 17 South 1638 Mail Service Center Elizabeth City, NC 27909 Raleigh, NC 27699-1638 252-264-3901 Location: Parker -Lincoln Building 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 / 1-888-4RCOAST Fax:919-733-1495 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Morehead City District 151-13 Hwy. 24 Hestron Plaza II Morehead City, NC 28557 202-808-2808 Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-395-3900 Fax:910-350-2004 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 10/05/01 NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary May 13, 2002 Town of Pine Knoll Shores ATTN: Chris Jones 100 Municipal Circle Pine Knoll Shores, NC 28512 Dear Mr. Jones: Attached is General Permit #C-30554 to replace the existing bridge # 46, which is 120' x 25' with a new 120' x 39' bridge adjacent to Bogue Sound on Oakleaf Drive at the crossing of McNeils Inlet, Pine Knoll Shores, Carteret County. In order to validate this permit, please sign all three (3) copies as indicated. Retain the white copy for your files and return the signed yellow and pink copies to us in the enclosed, self- addressed envelope. We appreciate your early attention to this matter. Sincerely, Bill Arrington D.O.T. Field Representative BA/srk Enclosures 151-B Hwy. 24, Hestron Plaza II, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper A� r NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary May 13, 2002 Town of Pine Knoll Shores ATTN: Chris Jones 100 Municipal Circle Pine Knoll Shores, NC 28512 Dear Mr. Jones: Attached is General Permit #C-30554 to replace the existing bridge # 46, which is 120' x 25' with a new 120' x 39' bridge adjacent to Bogue Sound on Oakleaf Drive at the crossing of McNeils Inlet, Pine Knoll Shores, Carteret County. In order to validate this permit, please sign all three (3) copies as indicated. Retain the white copy for your files and return the signed yellow and pink copies to us in the enclosed, self- addressed envelope. We appreciate your early attention to this matter. Sincerely, S/� �-? lt4�� Bill Arrington D.O.T. Field Representative BA/srk Enclosures 151-B Hwy. 24, Hestron Plaza II, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper 'ACAMA/ XDREDGE & FILL NO 30554 GENERAL PERMIT r - Previous permit # _New ❑Modification Complete Reissue Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC G?7% , Z 3 c 6 I ❑ Rules attached. Applicant Name- ['J p f"t.� AlAe Kv"o l SkocPS Project Location: County Ccke-fV rlk-'� Address—/ CC M.%KV\ c: �� �; rC Q- Street Address/ State Road/ Lot #(s) C)rc k )42c b rt�V('__ City _P --� F-.-6k ( S [itfe State iW ZIP 2-UlZ mi- CC5 S ; I.., &? 1 nlc k7o llS Phone # (;z�54 zq7- y3B Fax # ( ) Lq7y36 5 Subdivision Authorized Agent C.h ri5 0s s City P1 �� �S 1`6rP ZIP mot'Z�1 Affected ElCW >C EW � ';PTA ('ES X PTS Phone # ( ) River Basin Lo h t -k cn, k ❑ OEA ❑ HHF ^' IH ^' UBA C' N/A n AEC(s): Adj. Wtr. Body +JUf LLk_ 5 Clty\- na- Lman_/unkn) ❑ PWS: E. FC: l /� - ORW: yes / o PNA yes / no Crit. Hab. yes / no Closest Maj. Wtr. Body A- i&i2 ✓ c-r ! v\ t LI-C, Type of Project/ Activity !-�^ , 4{ C' Q r e-17 la Pier (dock) length Platform(s) Finger pier(s) Groin length number Bulkhead/ Riprap length avg distance offshore max distance offshore Basin, channel cubic yards Boat ramp Boathouse/ Boatlift Beach Buulplldozin Other (' l Ili r Ctcer4vc (Scale:-5e e � r r ; o',y 4"4 c�C i S �f � U n i �� %c , V 6 t,-k 5 l 2.0' L X 2 r� i tJ � -kL w 4-1 C�' ton � 0,6 v' re pare -cc &014A S - Li - o z,���� ���ecS?/�� OCM 30810z, CtvJrCI CI.S i.)e-l( CtS IQg9 I r��t CQFkr`c (t' '/Y11 Shoreline Length $AM g�es no Sandbags: not sure yes 0. Moratorium: n/a yes no Photos: 6D no Waiver Attached: yes no A building permit may be required by: i J rLk /`h�� /1 ;) ('/ Cl-tli .S n Notes/ Special Conditions 1 r� S+- Gt S Q- / / 1 / C. /)C) j AI- A- - j -IL -­,' . � Agent or Applicant Printed Name Signature Please read compli nce statement on back of permit" )LI Application Fee(s) Check # -E b 'In 4-P r- S See note on back regarding River Basin rules. issung uate /Expirafion Date fk-S xOVJDI''A Local Planning Jurisdiction Rover File Name TOWN OF PINE KNOLL SHORES 100 MUNICIPAL CIRCLE PINE KNOLL SHORES, N.C. 28512 (252) 247-4353 FIRST CITIZENS BANK & TRUST COMPANY MOREHEAD CITY, NC 28557 No. 029024 3-15-2002 29024 $100.00 66-030 531 r�"Y EXACTLY ***100 DOLLARS AND NO CENTS THIS DISBURSEMENT HAS BEEN APPROVED AS REQUIRED BY PAY DEHNR THE LOCAL GOVERNMENT BUDGET AND FISCAL CONTROL ACT. TO THE 151-B HWY 24 JJ ORDER HESTRON PLAZA II OF MOREHEAD CITY, NC 28557 I � i 1150 290 2L,", i:0 5 3 L00 3001: L 3 L 50 L860 Suv elm / r t 1101 Haynes Street Suite 101 Raleigh, NC 27604 Telephone: 919.828.3433 Fax: 919.828.3518 EcoScience MAR 1 8 2002 March 15, 2002 Mr. Bill Arrington m��CMCH L' E N.C. Division of Coastal Management Morehead City District 151-B Highway 24, Hestron Plaza II Morehead City, North Carolina 28557 RE: Proposed Bridge Replacement on Oakleaf Drive over McNeils 01-077 Inlet (B-4335), Pine Knoll Shores, Carteret County Dear Bill: The purpose of this letter and attachments is to notify the N.C. Division of Coastal Management (DCM) of proposed impacts to estuarine waters associated with replacement of Bridge No. 46 on Oakleaf Drive over McNeils Inlet in Pine Knoll Shores. The proposed project calls for replacement at the existing location with an off -site detour. The activity will result in the removal of existing wood and concrete piles and the insertion of new concrete piles in estuarine public trust waters. Total jurisdictional area impacts are limited to the insertion of eight 20-inch diameter concrete piles into an estuarine water bed. Proposed impacts are requested to be authorized under a Coastal Area Management Act (CAMA) general permit. No vegetated wetlands will be impacted by the project. No compensatory mitigation is proposed for project impacts. Bridge No. 46 is a two-lane structure with an overall span of 120 feet and a deck width of 25 feet. The bridge spans a man-made canal know as McNeils Inlet, which is approximately 96 feet wide and is bounded on each side by a plastic and wooden bulkhead. Land in the four quadrants of the crossing is high ground (approximately 10 to 15 feet above sea level), developed and maintained as residential lots and a community park. The primary vegetation cover in the bridge vicinity is maintained grasses and herbs. The McNeils Inlet canal is characterized by an unconsolidated bottom with no submersed aquatic vegetation varying in depth from sea level along the outer fringes of the channel to 4 feet deep (at mean low tide) at mid -channel. The distance from water surface to the bottom of bridge is a minimum of 8 feet (at mean high tide). This permit application includes 1) information attached to this letter and 2) information to be delivered by the Town of Pine Knoll Sh.,:es. 1 he Town of Pine Knoll Shores (in the person of Mr. Chris Jones) is going to provide you with evidence of project notification to the adjacent landowners (green return cards from certified mail) and a check covering the permit fee ($250.00). EcoScienc: Corporation _, ' u-.6i -"L--w Mr. Bill Arrington MO R i 8 ZQ02 March 15, 2002 Page 2 cogs ra EAD r- Please find attached the following information: • a completed and signed application form DCM-MP- I • a completed and signed Bridges and Culverts Form DCM-MP-5 • a location map (Figure 1) • a land -use aerial photograph (Figure 2) • a letter to the Town of Pine Knoll Shores from the U.S. Coast Guard dated July 8, 2001 • copies of project notification letters to adjacent landowners dated March 14, 2002 • plan views, cross -sections, and typical sections of the proposed bridge replacement The bridge replacement project is proposed by the Town of Pine Knoll Shores. The contact with the Town is Mr. Chris Jones, Director of Inspections and Public Property. The permittee should be designated as The Town of Pine Knoll Shores and the contact address and phone number are as follows The Town of Pine Knoll Shores 100 Municipal Circle Pine Knoll Shores, North Carolina 28512 phone: 252-247-4353 fax: 252-247-4355 Thank you for your assistance on this project. If you have any questions concerning this information, please do not hesitate to give me a call. Yours truly, ECOSCIENCE CORPORATION r Alexander P. (Sandy) Smith Senior Scientist Attachments CC: Mr. Ed Wetherill, Wetherill Engineering Mr. Chris Jones, The Town of Pine Knoll Shores Form DCM-MP-1 APPLICATI (To be completed by all applicants) MAk 18 2002 COASTAL MI MANAG b. Ci , town, un OF�m i.dF_LL :S D777 1. APPLICANT nn a. Landowner: 1��- �/9�� Inw �� f/?� N c57A Name L//Xi5 c1oNC-s -2 R0l0R IF Alb-ZI 1 pd-ri j ,'uH' vl (�'N� Kivo SffoRr .f Address /nc G city l IV E Ati o�Z S-116 ff s State Zip <f'�S^/� Day Phone ,�67-� - 4 411 5�35.3 Fax b. Authorized Agent: Name Address City State Zip Fax Day Phone c. Project name (if any) NOTE. Perrrdt %W be issued in nano of kutdowner(s), and/or project name. 2. LOCATION OF PROPOSED PROJECT a. County C fl /' / E AE T c. Street address or secondary road number C�Ft�L��F �iLf o�Fi /lGi✓E��S �,✓1F7 d. Is proposed work within city limits or planning jurisdiction? X Yes No e. Name of body of water pearest promo eqt (e.g. river, creek, sound, bay) O CA L i L s T po -u 6 SCU,V 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. hidc— c I Xc /9 V RT w bE Lim TFo Ta hL/y% nIf ��Es" b. Is the proposed activity maintenance of an"existing project, new work, or both? R K r E � T U� ftti r-X1sT,r� t2; A C-E. c. Will the project be for public, private or commercial use? C t i h Z i c. d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed please attach additional pagescc�/1 ffX►S%iNG hRI d c- �`N /� /tES, dElvTi'l9L dcvELoo1nr71vT P9,D61-- w,LL _7-,4'AN-ten o RT i4u%,nv/�i,CF' f>`N� 7- C C 17E 0i �E s Lt) I✓ l F L �M1r' HL b L Q Lu r V1 rlll-- Revised 03/95 Form DCM-MP-1 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract n • %s b. Size of individual lot(s) . Alil c. Approximate elevation of tract above MHW or NWL // T'c /41 r- d. Soil type(s) and texture(s) of tract i E t� e. Vegetation on tract /%����'i�rr_n c-g'�-»Es fhcy br--- -5 on, gored S�oui,D�RS f. Man-made features now on tract t,� RX % tic- ry R, tpZ,,JCfel NT - g. What is the CAMA Land Use Plan land classification of the site? (Consult the local land use plan.) Conservation Transitional _�L_ Developed Community Rural Other h. How is the tract zoned by local government? Is the proposed project consistent with the applicable zoning? Yes No (Attach Zoning compliance certificate, if applicable) j. Has a professional archaeological assessment been done for the tract? Yes _X_ No If yes, by whom? k. Is the project located in. a National Registered Historic District or does it involve a National Register listed or eligible property? Yes_ No 1. Are there wetlands on the site? Yes No Coastal (marsh) Other If yes, has a delineation been conducted? (Anach documentation, if available) W m. Describe existing wastewater treatment facilities. /,fi n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges.) .S eiRFr�ci RGN o�=F c t< o. Describe existing drinking water supply source. Al /9 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: • A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrumentVunder which the owner claims title, plus written permission from the owner to carry out the project. • An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale in black ink on an S 1/2" by 11" white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue -line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the Form DCM•MP-1 site. include highway or secondary road (SR) numbers, landmarks, and the lire. • A Stormwater• Certification, if one is necessary. • A list of the names and aasthpkte addrtessm of the adjacent waterfront (riparian) huuh7w=n and signed return reoelpts as proof tlhat such Owners have received a copy of the application and plats by certined mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant f a-thcr certifies that such notice has bent provided. Name Address Phone Name fc/ ^IS Address 19s 0rAlerµf DX,kj i�Z;H�k4 SOC-4i Phone -.4 / - Name %t t. /1i5JAi1 ,`�—[ail.4 Address tn2 D� L.r��F>c= ��� Phone • A list of pmvious state or federal permits issued for work on the project tract. Include permit numbers, ptanittee, and issuing dates. • A check for $250 made payable to the Dept of Environment, Health, and Natural Resotucea (DEHNR) to cover the costs of processing the application. • A signed AEC hazard -twice for projects in oceanfront and islet areas. • A statenuot of compliance with the N.C. Eavirortmerttal Policy Ad (N.C.G.5. 1113A • 1 to 10) If the project Lovoives lbe etpemliture of public funds or use of public lu4s, attach a statemnt documenting compliance with the North Caroiiaa Eavirorstuental Policy Act. Rzvi ed 03195 MAR 18 2002 6. CER' TO ENTER ON LAND I uadcrstatsd that any permit issued in response to this application will allow only the development described m the application. 'The project will be subject to conditions and restrictions contained ;n the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Progratn and will be conducted in a manner consist= with such pmgram- I certify that I ate authorized to gram, and do in fact. grant pertuission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project - I further certify that the informatkm provided in this Application is truthful to the beat of my knowledge. I N NA4czk--i1 Z cc z This is the _�t_J day of 19 Print Name - Xl Rl S Signature Pleat indicate auachnteata pertaining to your proposed project. DCM M7-2 Excavation and Fill Information .� DCM MP-3 Upland Development _ DCM MP-4 Suucaires Information X DCM MP-5 Bridges and Culverts _ DCM MP-6 Marina Developmattt NOTE: Pleats sign and date each attadmnl In the space provided ar die bottom of each form. Form DCM-MP-5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. 1. BRIDGES a. Public X Private b. Type of bridge (construction material) 0- WC RC- rE c. Water body to be crossed by bridge, 9 `/N E,LS .rVLET N5,�'4 u e( t'UirH 5"UNO. d. Water depth at the proposed crossing at MLW or NWL i- n 4f-�P 1�,r /�I /, t,-, e. Will proposed bridge replace an existing bridge? �_ Yes No If yes, (1) Length of existing bridge /3?C 1'�-4T (2) Width of existing bridge a5 Fier T (3) Navigation clearance underneath existing bridge -,P /%f 7- (4) Will all, or a part of, the existing bridge be removed? (Explain) 7A-- 11AT WF f. Will proposed bridge replace an existing culvert(s)? Yes X No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL MAK 16 Z09Z (4) Will all, or a part of, the existing culvert be removed? (Explain) g. Length of proposed bridge h. Width of proposed bridge i. Height of proposed bridge above wetlands Al ✓fc-ET 7r1) e-l-, ti p5 CGccIo( ui�",) GcCAA/�N" F- Tv 7/nE ltW/�'r' A 5UR/=��� /fir G/1 Ti:bF j. Will the propos bridge affect existing water flow? _x____ Yes No If yes, explain tz)c B C'ngTs' to, 6 � Gf11,9A's/=L P44-4 :Tc )qk',' )L-KE k. Navigation clearance underneath proposed bridge e 7- Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? �_ Yes No If yes, explain T#E T w' d �'c� �n f��ti i s tt114L AE .SEi,,',P177-,--6 try -47� /rfF7' /�r m. Will the proposed bridge cross wetlands containing no navigable waters? Yes X No If yes, explain // `A/,- / 4 5 LL CN5 ('d F1'1E6 /" N',9V,IGr¢/7,1r--- ,r 4V Th/E CU S C G _ n. Have you contacted the U.S. Coast Guard concerning their approval? _�L— Yes No If yes, please prov�J}de record of their action. EE, /gTr/fcf`ED L r- TT—,E/Q 0 Revised 03195 Form DCM-MP-5 2. CULVERTS a. Water body in which culvert is to be placed b. Number of culverts proposed c. Type of culvert (construction material, style) d. Will proposed culvert replace an existing bridge? Yes No e. If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) Will proposed culvert replace an existing culvert? Yes No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) f. Length of proposed culvert g. Width of proposed culvert h. ' Height of the top of the proposed culvert above the MHW or NWL Will the proposed culvert affect existing water flow? Yes No If yes, explain j. Will the proposed culvert affect existing navigation potential? Yes No If yes, explain 3. EXCAVATION AND FILL a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? Yes _ No If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Depth of area to be excavated (4) Amount of material to be excavated in cubic yards b. Will the placement of the proposed bridge or culvert require any excavation within: 1j[ Coastal Wetlands I/ SAVs A Other Wetlands If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Amount of material to be excavated in cubic yards c. Will the placement of the proposed bridge or culvert require any high ound excavation? Yes No If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Amount of material to be excavated in cubic yards d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area (2) Dimensions of spoil disposal area (3) Do you claim title to the disposal area? Yes No If no, attach a letter granting permission from the owner. Revised 03195 Forth ACM-MP-5 (4) Will the disimsal area be available for future maintenance? Yes No (5) Does the disposal area include any coastal wetlands (marsh), SAVs,,or other wetlands? Yes No If yea, give dimensions if different from (2) above. (6) goes the disposal area indude. any area below the MHW or NWL? Yes No If yes, give dimension if different from No. 2 above. e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated nwcrial described in Item d. above) to be placed below MHW or. NWL? _X Yes No (I) Length of area to be filled (2) Width of area to be filled (3) purpose of fill I 1 � 6 T A � c( ax, cri s ci � 0 7 Nl' 7'HE - f. will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. shove) to be planed within: Coastal Wetlands ,jC�- SAVs Other Wetlands If yea, (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill g_ Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highgrouud? _ X Yes No If yes, (I) Length of area to be filled S 3 r« 7 (2) Width of area to be,filled W Fc--: E T (3) Purpose of fill R 6 r .5 c 4, R r}Q C f fi,� r LY_ �- H f'r' fi'!'tl •_" /fir u . 4. GENERAL a. Will the proposed project involve any mitigation? Yes X No If yes, explain in detail Revised ON95 b. Will the proposed any existing utility If yes, explain in d MAR 18 2002 I ct requi�EM of A- ! No M HEAD�`�,� Will the proposed proj= require the construction of any temporary detour structures? Yes X No If yes, explain in detail d. Will the proposed project require any work channels? Yes _ a__.. No If yes, complete Form DCM-MP-2 e. How will excavated or fill material be kept on site and erosion controlled? `kf_-,gin' 1+7,1 Tiff CfJNN: tle-.A- ->�[7CE,v0Ca ;�rjillE ti7 r1 f_ i�vV'cr� Tr. /jams N i%7� 1 Cam_ . f. What type of construction equipment will be used (for ldrglie, bakhoe or - hydraulic c dredge? OA4P If -4r f1 it h'� l r' �c'; fit' I [ �l rr o h'm g. Will wetlands be crossed in transtporting Cquipmen to project site? Yes No If yes, explain steps that will be taken to lessen environmental impacts- h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? Yea A No If yes, explain in derail /-- fQ i r /�^ E L . r �-�j33SMcfv�ls i,�r-� � t �c� Ll`►Dn Town cXn�d���h0l2es gr Prq; sty �k r ;'1 r B-4335 CHF, iJ r E" MORE cffy -a �.�,,,�/ ✓i/ Yam. {' : PitlSi•A \ - c POP. 7,628 t Y � r - cx�� CARTERET .. • UaCU6 socam COUNTY w- f ; e - f j Havelock OIN t i' rw. hero CROAAN GAME LA "D i ... ,y.t' '.;. — { -� - PINE KNOLL 5`iORES.8ROGE 946, CARTERET COUNTY. REPLACE \. BRIDGE ON OAKLEAF DRIVE ) _ YtV OVER MCNEIL INLET. - FOREST Ilk j� w t "PIN ... —_— \ F .. ''a-....._�.. ,'�„•?�� // _J -�' �_ Ve'g/Yy� r :-i � �•4 Crnb Pear AN t.w\ GAN1E LAnD :1. i /r all NF r C, _ Morehead.. r r v ,. t .. j City - �'_ ' �Z'r" p I ;f![�'x3i! AJ05e.Y i!' - :• _ f��(�(Y ... ,.-S?r:Y' u ~ P .-.. _.. 88 n k — Salver STato-N3Weti ir¢-�x�'.--- v e. Ano:l x. f :a,fw.a •. IA. .. nC MAR i ?OOZ � sogu Ind— ask % COASTAL MANAGEMENT C EcoScience Corporation 1101 Haynes $fleet. Suite 101 Raiegh, NOM Caro,- 27604 919 828 3433 Fax 919 828 3518 Dwn by. ES FIGURE Ckd by: S.S Date: APR 2001 Project: 01-077 N Loc,_v • Ai Bridg V 4"Ji L p I Or ape J�- - �V low .1 It J4 I,V' aif n 46 7% *A, , o. T.Tr VA'SU. -1 1 AWNV Tw l Wi; Al' Jon of No. 46 0 e. "M :gj VIP% VW, W_- i4,06 T^ Z r?7 vyi.q AO 1_4 it -WSW it OTC- *7 IWAW ;v7, r IF --fiki -F _K WNW 4+, Ar 57!.. .w al 4,T3 I f, 77 wzzl i a k �gl. t 4 .t.+ �? "''�� { • 2 IMF 4k ir 11 THE TOWN OF PINE KNOLL SHORES e-mail:admin@townofpks.com website.www.townofpks.com 100 Municipal Circle, Pine Knoll Shores, North Carolina 28512 (252) 247-4353 - Fax (252) 247-4355 March 14, 2002 Ms. Barbara J. Evans ° ° 8�(� oft 195 Oakleaf Drive Pine Knoll Shores, N_ C. 28512 . - . A, .atiaG M Reference: Replacement Bridge for McNeil Inlet Dear Ms. Evans: We are now in the process of finalizing the permits that are required for the bridge replacement project. According to the Division of Coastal Management "Approval Procedures" 15ANCAC07H.2302, we are required to notify you of the bridge replacement project that will commence in the near future. Your comments should be directed to the Division of Coastal Management, 151-B Highway 24, Hestron Plaza IL Morehead City, N_ C. 28557 within 10 days of receipt of this letter. No response shall be interpreted as no objection. Sincerely, 09rvvlo Chris Jones Director of Inspections and Public Property CJ/lb �J//Jtc-S _ THE TOWN OF PINE KNOLL SHORES e-mail:admin(a townofpks_com website:www.townofpks_com 100 Municipal Circle, Pine Knoll Shores, North Carolina 28512 (252) 247-4353 • Fax (252) 247-4355 March 14, 2002 Mr. Antoine Malouf 201 Fern Court Pine Knoll Shores, N. C_ 28512 Reference: Replacement Bridge for McNeil Inlet Dear Mr. Maloof_ We are now in the process of finalizing the permits that are required for the bridge replacement project. According to the Division of Coastal Management "Approval Procedures" 15ANCAC07H_2302, we are required to notify you of the bridge replacemern project that will commence in the near future. Your comments should be directed to the Division of Coastal Management, 151-13 Highway 24, Hestron Plaza 11, Morehead City, N. C. 28557 within 10 days of receipt of this letter. No response shall be interpreted as no objection. Sincerely, Chris Jones Director of Inspections and Public Property CJAb THE TOWN OF PINE KNOLL SHORES e-maH:admin(L52townofpks.com website:www.townofpks.com 100 Municipal Circle, Pine Knoll Shores, North Carolina 28512 (252) 247-4353 • Fax (252) 247-4355 March 14, 2002 Mr. Larry Kacmarcik PIKSCO Corporation 104 Fern Court Pine Knoll Shores, N_ C. 28512 Reference: Replacement Bridge for McNeil Inlet Dear Mr. Kacmarcik: MAR 18 20OZ MOREH We are now in the process of finalizing the permits that are required for the bridge replacement project. According to the Division of Coastal Management "Approval Procedures" 15ANCAC07H.2302, we are required to notify you of the bridge replacement project that wi11 commence in the near future_ Your comments should be directed to the Division of Coastal Management, 151-B Highway 24, Hestron Plaza IL Morehead City, N. C_ 28557 within 10 days of receipt of this letter. No response shall be interpreted as no objection. Sincerely, Chris Jones Director of Inspections and Public Property CJIIb of, p ine 1 0 THE TOWN OF PINE KNOLL SHORES U. F: e-mail:admin@townofpks.com website:www.townofpks.com 100 Municipal Circle, Pine Knoll Shores, North Carolina 28512 (252) 247-4353 • Fax (252) 247-4355 \\°�h Cat��`�� March 14, 2002 Mr. Richard C. Seale �OQ� 202 dakleaf Drive Pine Knoll Shores, N_ C. 28512 Reference_ Replacement Bridge for McNeil Inlet Dear Mr. Seale. - We are now in the process of finalizing the permits that are required for the bridge replacement project. According to the Division of Coastal Management "Approval Procedures" 15ANCAC07H.2302, we are required to notify you of the bridge replacement project that will commence in the near future. Your comments should be directed to the Division of Coastal Management, 151-B Highway 24, Hestron Plaza 11, Morehead City, N. C_ 28557 within 10 days of receipt of this letter. No response shall be interpreted as no objection. Sincerely, Chris Jones Director of Inspections and Public Property CJ/1b TOTAL P.O7 From vvetr+en� Enginecnnq, ft To: Nathan Benson Date 'liDJO; rime 1 18 56 PM Page 3 & 3 COMMANDER ATLANTIC AREA AOW U.S. Orpbrtmarit of Tronaporftt►0rt UWtod StOm Covert Guard - 7573996334 um d Stat" Court Cuard Asatft Am Mr, dim Hunter, Commissioner To" of Pine Knolls Sborea 100 Municipal Cirvle Finc Knoll Shores, North Carolitut 28$12 Dear Mr. Hunter: 07110JOI 10:15 Lt:02/02 No:162 431 Crswara :S;W..t Dortsma/tM, VaL 2VU-SM4 SW 3ymbaLA Wb phOM: M5r)30 4C= RA*JQ (757) 16590 W ivL.y_01 Thin is in rcgwd to tho proposed mlaom m of = existing bridge ,acmes McNeil lnicL :nbutary of Bogue Sound, in Pine Knolls Shore, Nortb Carolina, Since NcNcil Inle, tributary of Rogue Soused, is tidal it is considered legMly navigable for Bridge Adminismition pw poses. 7t also meem the critaia ror advante a9prvval waterways outlined in Title 33, Codte of ]Federal Regukotions, Section 115.^0 at the bridge site. Advance approval waterways art those that art navigable in law, but not actually nurigated by onset dltan small boas. 'The Commandant oftbe Coast Guard hm given ius advance approval to the constitution of bridges acroge such waterways, to an individual bridge permit will not be required for the construction of a new bridge =oss McNeil inlet. The fact that a Cojmt Guard perm t is not required doer dot reiievc yot, of the resporwibility for cornplian" with the requimments of any other Federal, State, or local ag=cy who msy have j euiacbction over any aspect of the project. GILL1AM;5sc:9A,TL 0I:Avwb:Y=', Sincerely, ANN A D.EATCN Chief Bridge Ad nLni5tranlon Section By direction of the Commander Fifth Coast Guard District 2 AAMcNeil islet: kQine� y O 4 �8nered��� March 14, 2002 THE TOWN OF PINE KNOLL SHORES e-mail:admin@townofpks.com website:www.townofpks.com Mr. Richard C. Seale 100 Municipal Circle, Pine Knoll Shores, North Carolina 28512 (252) 247-4353 • Fax (252) 247-4355 202 Oakleaf Drive Pine Knoll Shores, N. C. 28512 Reference: Replacement Bridge for McNeil Inlet Dear Mr. Seale: We are now in the process of finalizing the permits that are required for the bridge replacement project. According to the Division of Coastal Management "Approval Procedures" 15ANCAC07H.2302, we are required to notify you of the bridge replacement project that will commence in the near future. Your comments should be directed to the Division of Coastal Management, 151-13 Highway 24, Hestron Plaza H, Morehead City, N. C. 28557 within 10 days of receipt of this letter. No response shall be interpreted as no objection. Sincerely, 6u---f C� Chris Jones Director of Inspections and Public Property CJ/lb {pine\ y � O \o enered 't6 Cato>> March 14, 2002 THE TOWN OF PINE KNOLL SHORES e-mail:admin@townofpks_com website:www.townofpks_com 100 Municipal Circle, Pine Knoll Shores, North Carolina 28512 (252) 247-4353 • Fax (252) 247-4355 MAR 21 2002 Mr. Larry Kacmarcik PIKSCO Corporation 104 Fern Court Pine Knoll Shores, N. C. 28512 Reference: Replacement Bridge for McNeil Inlet Dear Mr. Kacmarcik: We are now in the process of finalizing the permits that are required for the bridge replacement project. According to the Division of Coastal Management "Approval Procedures" 15ANCAC07H.2302, we are required to notify you of the bridge replacement project that will commence in the near future. Your comments should be directed to the Division of Coastal Management, 151-B Highway 24, Hestron Plaza 11, Morehead City, N. C. 28557 within 10 days of receipt of this letter. No response shall be interpreted as no objection. Sincerely, om;� C--�--- Chris Jones Director of Inspections and Public Property CJ/lb , Qine �\ 4 �°-th emdCaro,'°� March 14, 2002 THE TOWN OF PINE KNOLL SHORES e-maiI:admin@townofpks.com webs ite:www.town ofpks.com 100 Municipal Circle, Pine Knoll Shores, North Carolina 28512 (252) 247-4353 • Fax (252) 247-4355 Ms. Barbara J. Evans 195 Oakleaf Drive Pine Knoll Shores, N. C. 28512 Reference: Replacement Bridge for McNeil Inlet Dear Ms. Evans: We are now in the process of finalizing the permits that are required for the bridge replacement project. According to the Division of Coastal Management "Approval Procedures" 15ANCAC07H.2302, we are required to notify you of the bridge replacement project that will commence in the near future. Your comments should be directed to the Division of Coastal Management, 151-B Highway 24, Hestron Plaza H, Morehead City, N. C. 28557 within 10 days of receipt of this letter. No response shall be interpreted as no objection. Sincerely, Chris Jones Director of Inspections and Public Property CJ/lb /0 pine \ y � O \\Orth Caro>>�a/ March 14, 2002 THE TOWN OF PINE KNOLL SHORES e-mail:admin@townofpks.com website:www.townofpks.com 100 Municipal Circle, Pine Knoll Shores, North Carolina 28512 (252) 247-4353 • Fax (252) 247-4355 Mr. Antoine Malouf 201 Fern Court Pine Knoll Shores, N. C. 28512 Reference: Replacement Bridge for McNeil Inlet Dear Mr. Malouf. We are now in the process of finalizing the permits that are required for the bridge replacement project. According to the Division of Coastal Management "Approval Procedures" 15ANCAC07H.2302, we are required to notify you of the bridge replacement project that will commence in the near future. Your comments should be directed to the Division of Coastal Management, 151-B Highway 24, Hestron Plaza II, Morehead City, N. C. 28557 within 10 days of receipt of this letter. No response shall be interpreted as no objection. Sincerely, Chris Jones Director of Inspections and Public Property CJ/lb ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. { ■ Attach this card to the back of the mailpiece, ! or on the front if space permits. 1. Article Addressed to: .�6a- C�aklcQ� 17r. Shores Jac, ;L9612- A. Received by (Please Print Clearly) I B. Date of Delivery C. Is deliv If YES, 3. MAR 2 1 2002 I aZ- Agentt Registered 0 Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number (Copy from service label) 1 -'oqc PS Form 3811, July 1999 Domestic Return Receipt 102595-99-M-1789 saw _ UNITED STATES POSTAL SERVICF� First Class l'Jla'il Postage & Fees Paid USPS Permit No. G-10 •Sender: Please print your name, address, and ZIP+4 in this box rr• Iy -I r," /"j {1Cki TOWN of DINE KNOLL SHORES 100 Municipal Circle PMe Knoll Shores, NC 28512 CS2 11111111111111111111111I1I1I1fill III III tiff 111111111111111I'll ■ Complete items 1, 2, and 3. Also complete A. Received by ( le se Print item 4 if Restricted Delivery is desired.C� ■ Print your name and address on the reverse so that we can return the card to you. C. S' n ure ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: ! ►r �iV, I Gmari PfksL,u Corp, nc �85t `a- 2. Article Number (Copy from service label) PS Form 3811, July 1999 B. Date of Delivery 3 ` ( �_C4_ ❑ Agent D. Is delive4 address different from item 12 Q Yes If YES, enter deliVE d s o I MAR 2 1 2002 � 3. Serv' Type COAS,MANAGEMENT ified Mail ❑ ExpresTAL EHEAD pr'R'egistered a urn e ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes Domestic Return Receipt 102595-99-M-1789 UNITED STATES POSTAL SERVICE First -Class Nail Postage & Fees Paid USPS Permit No. G-10 • Sender: Please print your name, address, and ZIP+4 in this box • AtAv )_i 1)6Get TOWN of PINE KNOLL SHORES 100 Municipal Circle Pine Knoll Shores, NC 28512 q2 1's!IIIII111IIIiIIIIIIIII11dIIII ! III Ii!!!i!11111111111!11!!Ilt f Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, l or on the front if space permits. 1. Article Addressed to: j r bu r�r TF v(3As Q5 Qc.ac l eat' � kno61 mhore-s A �� t 2- 1 2. from service label) A. Received by (Please Print Clearly) I B Dat of Delivery ? C. Sigrat X r Agent ❑ Addressee ! D. Is delivery address different from W _ ❑ Yes If YFgw: r1; O No 21 2002. 3. ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes PS Form 3811, July 1999 Domestic Return Receipt 102595-99-M-1789 ? UNITED STATES POSTAL SERVICI '\ ; First -Class Mail Postage & Fees Paid USPS Permit No. G-10 • Sender: Please print your name, address, and ZIP+4 in this box • fi/-, : L; /) dq TOWN of PPE KNOLL SHORES 100 Municipal Circle Pine Knott Shores, NC 28512 1r)t11111ilill )III llllilt filllllitilflilltlli}fililliFllifiliilli ■ Complete items 1, 2, and 3. Also complete j item 4 if Restricted Delivery is desired. f ■ Print your name and address on the reverse ( so that we can return the card to you. ■ Attach this card to the back of the mailpiece or on the front if space permits. 1 1. Article Addressed to: j flr) - i i ne- Ma's OU -11.)1 Oakliea .1cVr, &,�5)2-- A. Received by (Please Print Clearly) B. Date of Delivery l � C. ig ture � X ❑ Agent ❑ Addressee D. Is delivery address different from 1? ❑Yes If YES, enter delivery ad dr _. Q No 3. Mail ❑ InsAed Mil tav 4. Restricted Delivery? (Extra Fee) 2. Article Number (Copy from service label) is �9 3 Sao 00of1 ❑ Yes j PS Form 3811, July 1999 Domestic Return Receipt 102595-99-M-1789 l i UNITED STATES POSTAL SERVICE First -Class Maif- Postage & Fees Paid USPS Permit No. G-10 • Sender: Please print your name, address, and ZIP+4 in this box • 'GOWN of PINE KNOLL SHORES 100 Municipal Circle PIN Knia►i Shares, NC 28512 `+�'.�i�.. "t'+Z•WC..)i Ilild,,I ii i is i!! 1! 1111 i l i i 11ii lll:i° lelli HI 11.,"11 i 11111111 Postal Service U.S.Postal CERTIFIEDMAIL RECEIPT CERTIFIED MAIL RECEIPT .I Only;- (DomesticOnly; L7 ru Article Sent 16e-(narC.►k 1ks�� O Article i,J' ar C. �a Ln rr. `o Postage $ J -0 Postage $ 3 0 m LFI m Certified Fee r 14/ Lrl M Certified Fee / Postmar - Return Receipt Fee (Endorsement Required) re g � O Return Receipt Fee (Endorsement Required) q no (. � Restricted Delivery Fee (Endorsement Required) Restricted Delivery Fee (Endorsement Required) 1 N� M� rf. 0 Total Postage &Fees $ , Z��2 Total Postage s Fees $ 3 S m Name (Please Print Clearly) (to 6e mp telMy mailer) m Name (Please Print Clearly) (to be compd bOIJPrl l eN.T f7' ---- - ----- BEM----------- --- Street, Apt. No.; or PO Box No. �µ�P0 Er ------ ---- ------ Street, Apt No.; or ISO Box No. ------------------------------------ o---------------- GoACJ�NL� -------------- City, State, ZIP+4 --•----------------------------- o -C--: ry, -State,State--ZIP+4 --- --------------------------------------------------------------------- 17— m a Article LrI Ln ►�.. c� i V� Yip c� M $ 3 MPostageLrI fTl M Certified F08 f, / V CO 1---3 Return Receipt Fee (Endorsement Required) I f, 5 CJ C3 O 0 Restricted Delivery Fee (Endorsement Required) Total Postage & Fees $ M m Name (Please Print Clearly) (to be c 0— Street, Apt. No.; or PO Box IVo E— O-------------------- --- Cary, State, ZIP+4 17�- Postmark Here ru rrl Lrl LrI $ fTl Postage `rl I"rl Certified Fee 0 �p Return Receipt Fee O p (Endorsement Required) t E:3 Restricted Delivery Fee (Endorsement Required) p Total Postage & Fees $ S M N e (Please Print Clearly) !in t�w'c b) ar_F1�� tr- --- --- Street, Apt. No.; or PO Box No. Er ---- .,a Z -•----- --------------- N City, State, ZIP+4 --- N DATUM DESCRIPTION THE LEGALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT IS BASED 04 THE STATE PLANE COORDINATES ESTARREVISHED BY IIL'DOT FOR NCNIMENT 'VERRAZZA' WITH NAD 83 STATE PLANE GRID COORDINATES OF AORTHIAG, 351255.aMl EASTIAG 2Gi462idW0 THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT (GROUND TO WID) IS- 099991314I THE ND. LAMWN GRID BEAR116 LOCALIZED HORIZONTAL MIND DISTANCE FROM VERRAZZA' TO -TREY- STATION 10+00E0 IS N 62' 45'(Ai5' E 5916205 (f0 Aft LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES VERTICALWV9 USED IS AWO 29 EJX.AR IWEWGTON -TREY- POT Sta- /O+OO.00 LYN TOH -Lf GLENAdACFADOEN 14 11 -.7N I 1 - POT Sta 15+10.52 OFF 40 I N R1ClURD A. CUSTAFSON WY AL LANGDOII .r wti ART" R J. MEIN aDA�I GUSTAFSON wRmrAr" tw nevr w t.>�aei�teKi�+w r ntur w W w ow NEU NNW �LLnn#Alm w rw m r. 'an ME m a.ttr ul w nc +ai sle 1— BEGIN- /4+ -L—J U G - BEGIN C & CONSTRUCT/ON m W ALL BOGUE SOUND TON o OF FKSCO CORPORATION PICy0OLL1l qq SHORES SkAm ET PARN' w wsLL w 11 . R rot wwa •y prom G sEAIE L7 -BL- POT Sta. 28.T3 uDA �SEALE -LREV-a POT St+E.62 �^.w OFF 14.08 : now .� oC lw m.wl. aoo = /6+25.00 \ 29.7/' -LREV- /5-108W1 .30 lEXISTR/ BEGIN BRIDGE /6+45A0 /6+45.00 LREV- /5+06..j0 42Ad 42A0 END RETAINING (STD. B4202 A +2 31 I -LREV- /4+96' 0 40 l I I EG/N ETA/N/NG _ wT o� 1 �b00 118 I b ALL (ST1»B42A2' lREV- /6+2B3 ii I V 0 \ PS 0 1 l i 'END BR/LSE v 1 T PoST 1 £xlsr. ftiw , I _I E r. R/w 6I me B I \ F c_lv, 76' DR. F _ If R-6 F — -- — i I _ Exlsr. R/W / EXIST. R/W O I o O I xe, (D wa I I I . � /4+/8 3 -[Rtl - PC Sfa A6+N7� LREV- /4+0230 (E RIW) SKETCH ENO BRIDOE / ADAn N RELA7011SHP BEGIN C & G 14+�18ry23 W 40 Jl R NAGLE i s RLLUY_C. BAILEY M CARROLL1F TOLER.Jt. Y4WGARET HAGS E a Y JABAILEY ,JA1E GHO=SON ETAL �a wRKe i non K. FREO BORN- Toa eanw Ter. t� W wf ML � IY q�jLT'�p.IIII. 11(ylUl utw. waw �L- POT Sta. 6+T3.84 tw ^.•..r. �e / MAR i 8 2002 -LREV- POT Sta. a+58Z -BL- POT Sta 1+0901 OFF DA -LREV- POT Sta. 14+93.3Z OFF 8.40 n J ETHERIL .1 ENGINEERING... °o 0 (EXISTR/W) I 15+00 46-W 3 l4 50 U0 w l5+ 897 a sa 3 30 4' wr (EXl R/W) NORGAN S.FOIJU O r B�1eeEjjjjTTYFOULK x I./�t VwTw Z_ wt IJm K tL / u to ttu n. tt� ao -LREV- PC S7o.16+4/JI )a / ) ROBOT J. EVANS e./ wle MRBARA EVAHS ei 0(K� .� cwr wea ale..w ArsK ■ �. oa owa/t 4FT X 20F7 PERMANENT SOIL REINFORCEMENT MATTING (SEE DETAIL-_) -LREV- IG END C & ��� IlART1N KFJ�IR/N ROOe/e erc+w LAYI 00 /7+27 ELXi Mr—Alm -BL- POT Sto -LREV- POT S OFF 12.30 ;,off l n ,L = T 50 272' (RT) D = P /5' DOA' L = /47.9' T = 73.64' R = 4,583.W SE = NC 76 \ i 0 O\ I l ®. 00 PROJECT REFERENCE NO. SHEET NO. B-4335 4 R,W SHEET NO. tOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOMPLETE PLANS w NOT UBR FOR R/i Acoum oN INCOMPLETE PLANS 1M NdT U6R ROR R/F ACVUffiITION -BL- POT Stu. R 4A2 -LREV- POT Sta 24.70 OFF 8Rl all I �►� :�t�,f) OOa• O O 29.85' (EXIST.R/W) i,IBETiL1 L BELC7Qt 1 0 1 YPS IN.7ER RND. JL .�- II `I � Vim IW ME 1frm1 L.� ALBERT VA70SQDELFT1 SAL VA TORE LOOM -LREV- /7f0330 ETLOf -LREV- PT SIa.17+88�8 ��%►:� SRusnr END C & G K'��+^e ��� w n.w n to nnnr r. w w tx Ma ao �. r ter wu twte 4FT X 20FT PERMANENT SOIL REINFORCEMENT MATTING (SEE DETAIL TBM #1 TBM #2 IN POWER POLE IN 36" HARDWOOD -LREV- STA. 14+21.70 LT. -LREV- STA. 17+13.96 RT. OFF. 32.11 RT EL. = 12.01 _ °' OFF 51.73 LT EL. = 11.06 ----------- Mill mm - �m I. .r.11l dr -" EII.�C •..... JIB •�. R� 'b , i1 11 . • : Ilr EL 1 emm .... ,.. : , Now BRIDGE HYDRAULIC DATA DESIGN DISCHARGE - NA CFS DESIGN FREQUENCY - NA YRS DESM HN ELEVATION - NA FT BASE DISCHARGE - NA CFS BASE FREQUENCY - 000 YRS BASE FAY ELEVATION - 73 FT OVERTOPPING DISCHARGE - NA CFS OVERTOPPING FREQUENCY +500YRS OVERTOPPING ELEVATION - 9.5 FT - FT DATE OF SURVEY - 04/25/DI WS.ELEVAFOV AT - DATE OF SURVEY _Os TO +per T OK1 an 1 10 11 12 13 14 15 16 17 18 19 20 21 22 1 I -LREV- /4+96' 0 40 l I I EG/N ETA/N/NG _ wT o� 1 �b00 118 I b ALL (ST1»B42A2' lREV- /6+2B3 ii I V 0 \ PS 0 1 l i 'END BR/LSE v 1 T PoST 1 £xlsr. ftiw , I _I E r. R/w 6I me B I \ F c_lv, 76' DR. F _ If R-6 F — -- — i I _ Exlsr. R/W / EXIST. R/W O I o O I xe, (D wa I I I . � /4+/8 3 -[Rtl - PC Sfa A6+N7� LREV- /4+0230 (E RIW) SKETCH ENO BRIDOE / ADAn N RELA7011SHP BEGIN C & G 14+�18ry23 W 40 Jl R NAGLE i s RLLUY_C. BAILEY M CARROLL1F TOLER.Jt. Y4WGARET HAGS E a Y JABAILEY ,JA1E GHO=SON ETAL �a wRKe i non K. FREO BORN- Toa eanw Ter. t� W wf ML � IY q�jLT'�p.IIII. 11(ylUl utw. waw �L- POT Sta. 6+T3.84 tw ^.•..r. �e / MAR i 8 2002 -LREV- POT Sta. a+58Z -BL- POT Sta 1+0901 OFF DA -LREV- POT Sta. 14+93.3Z OFF 8.40 n J ETHERIL .1 ENGINEERING... °o 0 (EXISTR/W) I 15+00 46-W 3 l4 50 U0 w l5+ 897 a sa 3 30 4' wr (EXl R/W) NORGAN S.FOIJU O r B�1eeEjjjjTTYFOULK x I./�t VwTw Z_ wt IJm K tL / u to ttu n. tt� ao -LREV- PC S7o.16+4/JI )a / ) ROBOT J. EVANS e./ wle MRBARA EVAHS ei 0(K� .� cwr wea ale..w ArsK ■ �. oa owa/t 4FT X 20F7 PERMANENT SOIL REINFORCEMENT MATTING (SEE DETAIL-_) -LREV- IG END C & ��� IlART1N KFJ�IR/N ROOe/e erc+w LAYI 00 /7+27 ELXi Mr—Alm -BL- POT Sto -LREV- POT S OFF 12.30 ;,off l n ,L = T 50 272' (RT) D = P /5' DOA' L = /47.9' T = 73.64' R = 4,583.W SE = NC 76 \ i 0 O\ I l ®. 00 PROJECT REFERENCE NO. SHEET NO. B-4335 4 R,W SHEET NO. tOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOMPLETE PLANS w NOT UBR FOR R/i Acoum oN INCOMPLETE PLANS 1M NdT U6R ROR R/F ACVUffiITION -BL- POT Stu. R 4A2 -LREV- POT Sta 24.70 OFF 8Rl all I �►� :�t�,f) OOa• O O 29.85' (EXIST.R/W) i,IBETiL1 L BELC7Qt 1 0 1 YPS IN.7ER RND. JL .�- II `I � Vim IW ME 1frm1 L.� ALBERT VA70SQDELFT1 SAL VA TORE LOOM -LREV- /7f0330 ETLOf -LREV- PT SIa.17+88�8 ��%►:� SRusnr END C & G K'��+^e ��� w n.w n to nnnr r. w w tx Ma ao �. r ter wu twte 4FT X 20FT PERMANENT SOIL REINFORCEMENT MATTING (SEE DETAIL TBM #1 TBM #2 IN POWER POLE IN 36" HARDWOOD -LREV- STA. 14+21.70 LT. -LREV- STA. 17+13.96 RT. OFF. 32.11 RT EL. = 12.01 _ °' OFF 51.73 LT EL. = 11.06 ----------- Mill mm - �m I. .r.11l dr -" EII.�C •..... JIB •�. R� 'b , i1 11 . • : Ilr EL 1 emm .... ,.. : , Now BRIDGE HYDRAULIC DATA DESIGN DISCHARGE - NA CFS DESIGN FREQUENCY - NA YRS DESM HN ELEVATION - NA FT BASE DISCHARGE - NA CFS BASE FREQUENCY - 000 YRS BASE FAY ELEVATION - 73 FT OVERTOPPING DISCHARGE - NA CFS OVERTOPPING FREQUENCY +500YRS OVERTOPPING ELEVATION - 9.5 FT - FT DATE OF SURVEY - 04/25/DI WS.ELEVAFOV AT - DATE OF SURVEY _Os TO +per T OK1 an 1 10 11 12 13 14 15 16 17 18 19 20 21 22 1 00 /7+27 ELXi Mr—Alm -BL- POT Sto -LREV- POT S OFF 12.30 ;,off l n ,L = T 50 272' (RT) D = P /5' DOA' L = /47.9' T = 73.64' R = 4,583.W SE = NC 76 \ i 0 O\ I l ®. 00 PROJECT REFERENCE NO. SHEET NO. B-4335 4 R,W SHEET NO. tOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOMPLETE PLANS w NOT UBR FOR R/i Acoum oN INCOMPLETE PLANS 1M NdT U6R ROR R/F ACVUffiITION -BL- POT Stu. R 4A2 -LREV- POT Sta 24.70 OFF 8Rl all I �►� :�t�,f) OOa• O O 29.85' (EXIST.R/W) i,IBETiL1 L BELC7Qt 1 0 1 YPS IN.7ER RND. JL .�- II `I � Vim IW ME 1frm1 L.� ALBERT VA70SQDELFT1 SAL VA TORE LOOM -LREV- /7f0330 ETLOf -LREV- PT SIa.17+88�8 ��%►:� SRusnr END C & G K'��+^e ��� w n.w n to nnnr r. w w tx Ma ao �. r ter wu twte 4FT X 20FT PERMANENT SOIL REINFORCEMENT MATTING (SEE DETAIL TBM #1 TBM #2 IN POWER POLE IN 36" HARDWOOD -LREV- STA. 14+21.70 LT. -LREV- STA. 17+13.96 RT. OFF. 32.11 RT EL. = 12.01 _ °' OFF 51.73 LT EL. = 11.06 ----------- Mill mm - �m I. .r.11l dr -" EII.�C •..... JIB •�. R� 'b , i1 11 . • : Ilr EL 1 emm .... ,.. : , Now BRIDGE HYDRAULIC DATA DESIGN DISCHARGE - NA CFS DESIGN FREQUENCY - NA YRS DESM HN ELEVATION - NA FT BASE DISCHARGE - NA CFS BASE FREQUENCY - 000 YRS BASE FAY ELEVATION - 73 FT OVERTOPPING DISCHARGE - NA CFS OVERTOPPING FREQUENCY +500YRS OVERTOPPING ELEVATION - 9.5 FT - FT DATE OF SURVEY - 04/25/DI WS.ELEVAFOV AT - DATE OF SURVEY _Os TO +per T OK1 an 1 10 11 12 13 14 15 16 17 18 19 20 21 22 1 TBM #1 TBM #2 IN POWER POLE IN 36" HARDWOOD -LREV- STA. 14+21.70 LT. -LREV- STA. 17+13.96 RT. OFF. 32.11 RT EL. = 12.01 _ °' OFF 51.73 LT EL. = 11.06 ----------- Mill mm - �m I. .r.11l dr -" EII.�C •..... JIB •�. R� 'b , i1 11 . • : Ilr EL 1 emm .... ,.. : , Now BRIDGE HYDRAULIC DATA DESIGN DISCHARGE - NA CFS DESIGN FREQUENCY - NA YRS DESM HN ELEVATION - NA FT BASE DISCHARGE - NA CFS BASE FREQUENCY - 000 YRS BASE FAY ELEVATION - 73 FT OVERTOPPING DISCHARGE - NA CFS OVERTOPPING FREQUENCY +500YRS OVERTOPPING ELEVATION - 9.5 FT - FT DATE OF SURVEY - 04/25/DI WS.ELEVAFOV AT - DATE OF SURVEY _Os TO +per T OK1 an 1 10 11 12 13 14 15 16 17 18 19 20 21 22 1 BRIDGE HYDRAULIC DATA DESIGN DISCHARGE - NA CFS DESIGN FREQUENCY - NA YRS DESM HN ELEVATION - NA FT BASE DISCHARGE - NA CFS BASE FREQUENCY - 000 YRS BASE FAY ELEVATION - 73 FT OVERTOPPING DISCHARGE - NA CFS OVERTOPPING FREQUENCY +500YRS OVERTOPPING ELEVATION - 9.5 FT - FT DATE OF SURVEY - 04/25/DI WS.ELEVAFOV AT - DATE OF SURVEY _Os TO +per T OK1 an 1 10 11 12 13 14 15 16 17 18 19 20 21 22 1 an 1 10 11 12 13 14 15 16 17 18 19 20 21 22 1 14+00 tm 15+00 Ell +m 17#W FEDERAL AID PROUEGT NQ 8RZ-0299 (1) �i FILL f CJ END BEN STA 15.0830 rGRADE POINT EL 1599 APPROXIMATE EXISTING GROUND LINE Vo — p; \gyp* \a0R 1A9, �hpr E� \� 12" PRESTRESSED CONCRETE PILES— .. 1 'LL FACE (a END BENT 1 'A 15.06JO -LREV: ow 1 IV"' A MI OSA BLVD. FIX. EXP. EXP lop \p•. 0� gyp. 20" PRESTRESSED CONCRETE PILES FIX. EXP. FJ��FX �HWS 6,0`. (1999) +� SURVEY WS 1.0' t (4.26-01) 1 ( 1.0' TO 17 s TIDAL FLOW) .ap- •''pY gip. �vo 20" PRESTRESSED CONCRETE PILES SECT ION ALONG V -L REV. - (END BENTS AND BENT ON SECTION AT RIGHT ANGLES TO BENTS) �I rnljl 1 gl I ~ ti �IMIII xl Ml �I 1 I•--C BRIDGE $IMI I STA 15-683D -L REV. 1`II I WP_3 I 15.4330 -LREV. STA 15.9330 -LREV: I , BENT 1+1 I BENT 2- 1 I I II 1 I I I I III III I I II I 1 1 R'YPJ I 1 W I I i wl 1 II I ,III I R' 025XY �•4.15987 PV I • 16.78D0 -L REV: FILL FACE (J END BENT 2 EL • 1557 STA 16.2830 L 90'00 GRADE POINT EL 15.69 SAW AWA \y4 v� pY v\pp. `,gyp' `gyp• \p. 12 " PRESTRESSED CONCRETE PILES W.P. 4 FILL FACE 0 END BE STA 16.2830 -LREV: I I � II 15'-0" 50'•0 350 1 l II R I 120'-0" TOTAL LENGTH OF F6E 1_ n (FILL FAC TO FILL A: ti PLAN (PILES NOT SHOWN FOR CLARITY) DRAWN BY, DATE: �'_... N O CHECKED BT, 16-3930 -LREV: C -L REV: ASSUMED LIVE LOAD • HS 20 OR ALTERNATE LOADING. THIS BRIDGE HAS BEEN DESIGNED IN ACCORDANCE WITH THE REQUIREMENTS OF THE STANDARD SPECIFICATIONS FOR SEISMIC DESIGN OF HIGHWAY BRIDGES FOR SEISMIC PERFORMANCE CATEGORY -A-. FOUNDATION TYPE WILL BE DETERMINED AFTER FOUNDATION RECOMMENDATIONS ARE RECEIVED. THIS STRUCTURE CONTAINS THE NECESSARY CORROSION PROTECTION REQUIRED FOR A CORROSIVE SITE. HYDRAULIC DATA DESIGN DISCHARGE N/A FREOUENCY OF DESIGN FLOOD N/A DESIGN HIGH WATER ELEV. N/A DRAINAGE AREA N/A BASIC DISCHARGE (O1OO) N/A BASIC HIGH WATER ELEV. 73' OVERTOPPING FLOOD DATA OVERTOPPING FREOUENCY OF OVERTOPPING FLOOD 500 YRS. OVERTOPPING FLOOD ELEV. 9A' -L REV: HORIZONTAL PI STA • 17- 15.35 • 1 150'-27 " RT. T • 73.64' R • 4583.66' L • 14727' TO NC 58 PROJECT NO........ 8-4335- - - - - - . - PROGRESS DRAWING ....... CARTERET........... COUNTY DO NOT USE FOR �_ CONSTRUCT ION STATION: --i5--- - .30 - - - - - - - 4REV .......... SEAL ` o: 10773 C 2 m ,.I.I,^vo.c ew Av �51 W) D.WWC [CSC) - OS/PS - COKSFI.C)d OWWA1d STATE OF WATM CAA NA DEPARTMENT OF TRANSPORTATION AALVCM PRELIMINARY GENERAL DRAWING FOR BRIDGE ON OAKLEAF DRZVE OVER M.QNEILS INLET BETWEEN WTHORNE DRIVE AND CEDAR ROAL ,IEVISIONS 39'-0 " I+— -L RE I (CLEAR ROADWAY) /2'-0 " 12'-0- 5'-6 " 1 ANCHOR ASSEMBLY (TYPJ OD2 FTJFT. 0D2 FTJFT. 00 00 00 00 100-1-00 oo 00 1 00 00 O 00 00 f I 3'-0" x 1'-9" CORED SLAB UNIT (TYPJ DRAINC�P E I 13-3'-0" x 1'-9" PRESTRESSED CONCRETE CORED SLAB UNITS i MAR 18 2002 [1M Z: NA/L 7N Jb HAKUW000 7J3' L1.Ur S/ A. 1/+ 1.99b. tL 1 1.05 z I V) z Ir T: I I POST I PROPOSED �I $O 'i c �i��y� I Z I 7 POST I $ / I 0/. 1` O ;A POST I I / POST CANO p1) ANOPr'J �—t o T w o► w- w Pos P wz '1s E uHE 1 i — ^ / \ O SIGN \ F T \ \ 1 TELE PED. LEG 1 I� F o I F - F eoz I I 0 I 1 1 LP TANK I / C �1 0 0 / I 1� FOR UTILITY INFORMATION, SEE UTILITY PLANS AND SPECIAL PROVISIONS. LOCATION SKETCH o t w-- OJie-_ a V,� it , �Q (r< S s� PROJECT NO........ B-4M5........ PROGRESS QRoW ING ..... - .CARTERET ........... COUNTY DO NOT USE FOR CONSTRUCTION STATION:. f4464M. -LREV. SHEET 2 OF 2. REPLACES BRIDGE NO. 46 Richard S. Seale 202 Oakleaf Drive Pine Knoll Shores NC 28512 252-726-0930 Fax 252-726-0930 Friday, March 15 Ms.Kathy Vinson LCO 14 Z002 CAMA/NCDENR-Div of CM Hestron Plaza II 151-B Hiway 24 7A� MAAG ME Morehead City, NC 28557 MOREHEAp Dear Ms. Vinson: This letter is sent to your office as directed in a certified letter that we received today, March 15,2001 from the Town of Pine Knoll Shores (PKS). The letter states that PKS is in the process of getting "final permits" required for the McNeil Inlet Bridge on Oakleaf Dr. Some months ago, residents to be impacted by the bridge project met with PKS and contract engineering persons to learn more about the specifics of the bridge project. During that meeting many of the residents on either side of the bridge voiced concerns about what the new bridge increased deck size and access profiles would do to water drainage and driveway access and egress safety. These concerns included drainage of rainwater off of the bridge deck versus the current "through the deck", water accumulations in yards due to the access profiles blocking current water flows, and fears of residential flooding due to these changes. At the conclusion of that meeting, PKS promised the impacted residents that they would be kept advised of the bridge project protocols. I personally have heard nothing since that meeting. PKS promised to have at least another meeting for the impacted residents before anything "final" was decided upon. The wording in the certified letter I just received from PKS clearly states that PKS "is now in the process of finalizing the permits that are required for the bridge replacement project." I feel the NC Division of Coastal Management needs to be made officially aware of the "missing" meetings promised by PKS before anything "final" is done. I do not know what the final Permits entail, but I do not want any horses getting ahead of any carts i trust yotir office will not issue any "final' permits until the above resident concerns have been dealt with. I look forward to your offices written response. I will be out of town Monday and Tuesday, March 18 & 19 but as you can see I have provided my home office phone (with answering machine) and fax numbers in the letterhead above. Sincerel , Richard C Page 1 of 1 �CF WATFR� Michael F. Easley, Governor William G. Ross, Jr., Secretary c North Carolina Department of Environment and Natural Resources � r J p Gregory J. Thorpe, Ph.D., Acting Director Divisi6h of Water Quality Wilmington Regional Office April 24, 2002 CERTIFIED MAIL 97002 0460 0000 4340 3764 RETURN RECEIPT REQUESTED MAY 0 2 2002 Ms. Betty Carr, Town Administrator Town of Pine Knoll Shores 100 Municipal Circle Pine Knoll Shores, NC 28512 Subject: REQUEST FOR STORMWATER MANAGEMENT PERMIT APPLICATION B-4335 McNeils Inlet Bridge Replacement Stormwater Project No. SW8020425 Dear Ms. Carr: Carteret County On April 18, 2002, the Wilmington Regional Office received a copy of a CAMA Application for B-4335 McNeils Inlet Bridge Replacement. The North Carolina Administrative Code requires any project that must receive either Sedimentation and Erosion Control Plan approval and/or a CAMA Major permit to apply for and receive a Stormwater Management Permit by the Division of Water Quality. Any construction on the subject site, prior to receipt of the required permit, will constitute a violation of 15A NCAC 2H.1000 and may result in appropriate enforcement action by this Office. Either a Stormwater Permit Application Package including 2 sets of plans, completed application form, fee, and supporting documentation, or a written response regarding the status of this project and the expected submittal date must be received in this Office no later than May 24, 2002. Failure to respond to this request may result in the initiation of enforcement action, and construction may experience a subsequent delay. The NPDES 010000 Federal Stormwater Permit that accompanies the Erosion Control Plan approval letter must NOT be considered the Coastal Stormwater Management Permit, which will be signed by the Water Quality Supervisor. Please reference the Project Number above on all correspondence. Ifyou have any questions, please call me at (910)-395-3900. Sincerely, Linda Lewis Environmental Engineer RSS/arl: S:\WQS\STORMWAT\STORMSUB\020425.Apr cc: Katrina Marshall, Carteret County Building Inspections CAMA (Morehead) Linda Lewis Central Files 4 N ENR N.C. Division of Water Quality 127 Cardinal Drive Extension Wilmington, N.C. 28405 (910) 395-3900 Fax (910) 350-2004 Customer Service 800-623-7748 Deck drains Subject: Deck drains Date: Wed, 01 May 2002 14:11:24 -0400 From: Linda Lewis <Linda.Lewis@ncmail.net> Organization: NC DENR To: Bill Arrington <Bill.Arrington@ncmail.net> Mr. Arrington: The stormwater rules require DOT to do the best they can do regarding road and bridge projects. Our stance on deck drains is to encourage the elimination of direct discharges to waters of the State. Linda 1 of 1 5/13/02 1:10