HomeMy WebLinkAbout30573_NC DOT_20020212�CAMA / ❑ DREDGE & FILL 0573
GENERAL PERMIT Previous Permit#
❑flew ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued �
i
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC z -
❑ Rules attached.
Applicant Name JtiT Project Location: County Cr ;Z
Address tto , Street Address/ State Road/ Lot #(s)
City State ZIP i.
+� `` f `Fax # k. 0 1 1:✓F !'
Phone # ( ) r ( ) Subdivision
Authorized Agent _ ", City ZIP
Affected ❑ cw EW PTA ❑ ES" 2PTS Phone # ( ) j River Basin -
AEC(s): EloEA ElHHF ❑ IH ElUBA El N/A Adj. Wtr. Body i ? \ (nat /man /unkn)
❑ PWS: ❑ FC:
ORW: yes/ no PNA -yea:J no Crit. Hab. yes ! no
Closest Maj. Wtr. Body
Type of Project/ Activity
Pier (dock) length
Platform(s)
Finger pier(s)
Groin length
number
Bulkhead/ Riprap length_
avg distance offshore_
max distance offshore
Basin, channel
cubic yards
Boat ramp
Boathouse/ Boatlift
Beach Bulldozing
Other
Shoreline Length
SAM not sure yes no
Sandbags: not sure yes no --
Moratorium: n/a yes no
Photos: yes i no
Waiver Attached: yes no
A building permit may be required by:
Notes/ Special Conditions
Agent or Applicant Printed Name
t ,
Signature Please read compliance statement on back of permit
Application Fee(s) Check #
(Scale: )
See note on back regarding River Basin rules.
Permit Officer's Signature
Issuin Date Expiration Date
1
Local Planning Jurisdiction Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certifythat this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-395-3900) for more information on how to comply with thesebuffer rules.
Division of Coastal Management Offices
Central Office Elizabeth City District
Mailing Address: 1367 U.S. 17 South
1638 Mail Service Center Elizabeth City, NC 27909
Raleigh, NC 27699-1638 252-264-3901
Location: Fax: 252-264-3723
Parker -Lincoln Building
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293 / 1-888-411COAST
Fax:919-733-1495
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Morehead City District
151-13 Hwy. 24
Hestron Plaza II
Morehead City, NC 28557
202-808-2808
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-395-3900
Fax:910-350-2004
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 10/05/01
STATE OF NOR-TI ' " ' r
DEPARTMENT OF TRANSPORTATION
DIVISION 02 OFFICE
P. O. BOX 1587
GREENVILLE, NC 27835
Pay
Pay N.C.D.E.N.R.
to the *
Drder of GREENVILLE, NC 27835
WARRANT NO. 944 0
DATE 02/11/2002
66-1059 STATE TREASURER, RALEIGH, NORTH CAROLINA
531 PAYABLE AT PAR THROUGH FEDERAL RESERVE SYSTEM
Ile0000944011' I:0 5 3 1 10 594': ci"'00011164 2►'■
ootu��i.��-ia-��►-yaw-� o NE' 2CR0-;2ER01ER100+2ER0-�2ER0
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
Micheal Easley DIVISION OF HIGHWAYS Lyndo Tippett
GOVERNOR SECRETARY
FEB 2,3 ?Ca?
February 6, 2002
MEMORANDUM TO: Sandy SfRi PEAR,
FROM: Jay B. Johnson, Division Environmental Officer
SUBJECT:
Permit application fee request
I need one $100.00- peek payable to N.C. DENR
This is for a CAMA General Permit on SR 1161 in Carteret County for a pipe
replacement.
Division Two * P.O. Box 1587 • Greenville, N.C. 27835
Foam DCM-MP-5
BRIDGES AND
CULVERTS
Attach this form to Joint Application for CAMA Major
Perm t, VOrm DCM-MP-1. Be sure to complete all other
sections of the Joint Application that relate to this
proposed project.
1. BRIDGES N/A
a. Public Private
b. Type of bridge (construction material)
c. Water body to be crossed by bridge
d. Water depth at the proposed crossing at MLW or
NWL
e. Will proposed bridge replace an existing bridge?
_ Yes No
If yes,
(1) Length of existing bridge
(2) Width of existing bridge
(3) Navigation clearance underneath existing
bridge
(4) Will all, or a part of, the existing bridge be
removed? (Explain).
f. Will proposed bridge replace an existing culvert(s)?
Yes No
If yes,
(1) Length of existing culvert
(2) Width of existing culvert
(3) Height of the top of the existing culvert above
the MHW or NWL
(4) Will all, or a part of, the existing culvert be
removed? (Explain)
g. Length of proposed bridge
h. Width of proposed bridge
L Height of proposed bridge above wetlands
j. Will the proposed bridge affect existing water flow?
_ _Yes No
If yes, explain
k. Navigation clearance underneath proposed bridge
Will the proposed bridge affect navigation by
reducing or increasing the existing navigable
°lasing? Yes _ eta
If yes, explain
in. Will the proposed bridge cross wetlands containing
no navigable waters? Yes No
If yes, explain
n. Have you contacted the U.S. Coast Guard
concerning their approval?
Yes No
If yes, please provide record of their action.
2. CULVERTS
a. Water body in which culvert is to be placed
Tributary to Adam's Creek
b. Number of culverts proposed 2 @a 55" x 73" x 60'
c. Type of culvert (construction material, style)
Aluminum
d. Will proposed culvert replace an existing bridge?
Yes X No
If yes,
(1) Length of existing bridge
(2) Width of existing bridge_
(3) Navigation clearance underneath existing
bridge
(4) Will all, or a part of, the existing bridge be
removed? (Explain)
Form DCM-MP-5
e. Will proposed culvert replace an existing culvert?
X ^Yes No
If yes,
(1) Length of existing culvert 1= 30', 2=32',
3=32'
(2) Width of existing culvert1=24", 2=24"
3=18"
(3) Height of the top of the existing Culvert above
the MHW or NWL_ 1=1'. 2=.5', 3=17'
(4) Will all, or a part of, the existing culvert be
removed? (Explain)Yes, The existing culvert
will be removed and re laced with the new
culvert.
f Length of proposed culvert 2 @ 60'
g. Width of proposed culvert 73"ea.
h. Height of the top of the proposed culvert above the
MHW or NWL 1.0 ft.
I. Will the proposed culvert affect existing water flow?
Yes _-X_No
If yes, explain _
j. Will the proposed culvert affect existing navigation
potential? Yes X No
If yes, explain
3. EXCAVATION AND FILL
a. Will the placement of the proposed bridge or culvert
require any excavation below the MHW or NWL?
X _Yes _ No
If yes,
(1) Length of area to be excavated 66'
(2) Width of area to be excavated 16'
(3) Depth of area to be excavated 2'
(4) Amount of material to be excavated in —cubic
yards 80 cuyd.
b. Will the placement of the proposed bridge or culvert
require any excavation within:
X Coastal Wetlands SAVs Other
Wetlands
If yes
(1) Length of area to be excavated 66'
(2) Width of area to be excavated 16'
(3) Amount of material to be excavated in cubic
yards 80 cu yds_
c. Will the placement of the proposed bridge or culvert
require any highground excavation?
X Yes No
If yes,
(1) Length of area to be excavated 50'
(2) Width of area to be excavated 25'
(3) Amount of material to be excavated in cubic
yards 100
d. If the placement of the bridge or culvert involves any
excavation, please complete the following:
(1) Location of the spoil disposal area
Temporary spoil area is exists Ad bed
(2) Dimensions of spoil disposal area
20' g 30' at pine crossing
(3) Do you claim title to the disposal area?
X Yes No
If no, attach a letter granting permission from
the owner.
(4) Will the disposal area be available for firture
maintenance? X Yes No
(5) Does the disposal area include any coastal
wetlands (marsh), SAVs, or other wetlands?
Yes X No
If yes, give dimensions if different from (2)
above.
(6) Does the disposal area include any area below
the MHW or NWL? Yes X No
If yes, give dimension if different from No. 2
above.
e. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed below MHW
or NWL? X Yes No
If yes, — —
(1) Length of area to be filled
(2) Width of area to be filled
(3) Purpose of fill place rip -rap
slope protection at ends of pipe
f Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed within:
X_Coastal Wetlands SAVs Other
Wetlands If yes,
(1) Length of area to be filled
(2) Width of area to be filled
(3) Purpose of fill rip -rap
slope protection at ends of pipe
Form DCM-MP-5
g. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed on
highground? Yes X No
If yes,
(1) Length of area to be filled
(2) Width of area to be filled
(3) Purpose of fill
4. GENERAL
a. Will the proposed project involve any mitigation?
Yes X No
If yes, explain in detail
b. Will the proposed project require the relocation of
any existing utility lines? Yes X No
If yes, explain in detail
c. Will the proposed project require the construction of
any temporary detour structures?
Yes X No
If yes, explain in detail
d. Will the proposed project require any work channels?
Yes X No
If yes, complete Form DCM-MP-2
e. How will excavated or fill material be kept on site
and erosion controlled? Silt fence
f What type of construction equipment will be used
(for example, dragline, backhoe or hydraulic
dredge)? Typical Bridge construction equipment
g. Will wetlands be crossed in transporting equipment
to project site? Yes X No
If yes, explain steps that will be taken to lessen
environmental impacts.
h. Will the placement of the proposed bridge or culvert
require any shoreline stabilization?
Yac X No
NCDOT-Carteret SR 1161 (Tuttle's Grove Rd.)
Applicant or Project Name
Signature
Feb. 8, 2002
Date
I
I
�'Z�/o"�r�Nr aLp,�s
��lovEo S iR/�«d, r✓/,
c �5 x �3' �fflN �edllf
Go}lLrt� lJ a-
1 l..l.
:, fig
II
0
All
--L�At,C
I
I
�
1
�
I
f
v
O'd
rLi
I
or
00
f,
EM-MM®
Form DCM-MP-5
BRIDGES AND
CULVERTS
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-1. Be sure to complete all other
sections of the Joint Application that relate to this
proposed project.
1. BRIDGES N/A
a. Public Private
b. Type of bridge (construction material)
c. Water body to be crossed by bridge
d. Water depth at the proposed crossing at MLW or
NWL
e. Will proposed bridge replace an existing bridge?
_ _Yes No
If yes,
(1) Length of existing bridge
(2) Width of existing bridge
(3) Navigation clearance underneath existing
bridge
(4) Will all, or a part of, the existing bridge be
removed? (Explain).
f Will proposed bridge replace an existing culvert(s)?
Yes No
If yes,
(1) Length of existing culvert
(2) Width of existing culvert
(3) Height of the top of the existing culvert above
the MHW or NWL
(4) Will all, or a part of, the existing culvert be
removed? (Explain)
g. Length of proposed bridge
j. Will the proposed bridge affect existing water flow?
_ _Yes No
If yes, explain
k. Navigation clearance underneath proposed bridge
1. Will the proposed bridge affect navigation by
reducing or increasing the existing navigable
apening? Yes _ No
If yes, explain
in. Will the proposed bridge cross wetlands containing
no navigable waters? Yes No
If yes, explain
n. Have you contacted the U.S. Coast Guard
concerning their approval?
Yes No
If yes, please provide record of their action.
2. CULVERTS
a. Water body in which culvert is to be placed
Tributary to Adam's Creek
b. Number of culverts proposed 2 @ 55" x 73" x 60'
c. Type of culvert (construction material, style)
Aluminum
d. Will proposed culvert replace an existing bridge?
Yes X No
If yes,
(1)
(2)
(3)
Length of existing bridge.
Width of existing bridge_
Navigation clearance
underneath existing
h. Width of proposed bridge the existing bride be
i. Height of proposed bridge above wetlands (4) Will all, or a part of, g g
p p g removed? (Explain)
Form DCM-MP-5
e.
Will proposed culvert replace an existing culvert?
c. Will the placement of the proposed bridge or culvert
X Yes ` No
require any highground excavation?
If yes,
X Yes No
(1) Length of existing culvert 1= 30', 2=32'1
If yes,
3=32'
(1) Length of area to be excavated 50'
(2) Width of existing culvert 1=24 , 2=24",
(2) Width of area to be excavated 25'
3=18"
(3) Amount of material to be excavated in cubic
(3) Height of the top of the existing culvert above
yards 100
the MHW or NWL 1=1', 2=.5', 3=37'
d. If the placement of the bridge or culvert involves any
(4) Will all, or a part of, the existing culvert be
excavation, please complete the following:
removed? (Explain)Yes, The existing culvert
(1) Location of the spoil disposal area
will be removed and replaced with the new
Temporary spoil area is existing road bed
culvert.
(2) Dimensions of spoil disposal area
f
Length of proposed culvert 2 @ 60'
20' x 30' at pipe crossing
g.
Width of proposed culvert 73"ea.
(3) Do you claim title to the disposal area?
h.
Height of the top of the proposed culvert above the
X Yes No
MHW or NWL 1.0 ft.
If no, attach a letter granting permission from
the owner.
i.
Will the proposed culvert affect existing water flow?
(4) Will the disposal area be available for future
Yes X No
maintenance? X Yes No
If yes, explain
(5) Does the disposal area include any coastal
wetlands (marsh), SAVs, or other wetlands?
Yes X No
j.
Will the proposed culvert affect existing navigation
If yes, give dimensions if different from (2)
potential? Yes X No
above.
If yes, explain
(6) Does the disposal area include any area below
the MHW or NWL? Yes X No
If yes, give dimension if different from No. 2
3.
EXCAVATION AND FILL
above.
Will the placement of the proposed bridge or culvert
require any excavation below the MHW or NWL?
X Yes — _ No
If yes,_
(1) Length of area to be excavated 66'
(2) Width of area to be excavated 16'
(3) Depth of area to be excavated 2'
(4) Amount of material to be excavated in cubic
yards 80 cuyd.
b. Will the placement of the proposed bridge or culvert
require any excavation within:
X Coastal Wetlands SAVs Other
Wetlands
If yes
(1) Length of area to be excavated 66'
(2) Width of area to be excavated 16'
(3) Amount of material to be excavated in cubic
yards 80 cu yds_
Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed below MHW
or NWL? X Yes _ _No
If yes,
(1) Length of area to be filled
(2) Width of area to be filled
(3) Purpose of fill place rip -rap
slope protection at ends of pipe
f Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed within:
x Coastal Wetlands SAVs Other
Wetlands If yes,
(1) Length of area to be filled
(2) Width of area to be filled
(3) Purpose of fill rip -rap
slope protection at ends of pipe
.. Form DCM-MP-5
g. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed on
highground? Yes X_ No
If yes,
(1) Length of area to be filled
(2) Width of area to be filled
(3) Purpose of fill
4. GENERAL
a. Will the proposed project involve any mitigation?
Yes X No
If yes, explain in detail
b. Will the proposed project require the relocation of
any existing utility lines? Yes X No
If yes, explain in detail
c. Will the proposed project require the construction of
any temporary detour structures?
Yes X No
If yes, explain in detail
d. Will the proposed project require any work channels?
Yes X No
If yes, complete Form DCM-MP-2
e. How will excavated or fill material be kept on site
and erosion controlled? Silt fence
f. What type of construction equipment will be used
(for example, dragline, backhoe or hydraulic
dredge)? Typical Bridge construction equipment
g. Will wetlands be crossed in transporting equipment
to project site? Yes X No
If yes, explain steps that will be taken to lessen
environmental impacts.
h. Will the placement of the proposed bridge or culvert
require any shoreline stabilization?
YPc X No
NCDOT-Carteret SR 1161 (Tuttle's Grove Rd.)
Applicant or Project Name
Signature
Feb. 8, 2002
Date
SIAP
II �, /✓ RE�IvEt� g I n
:)F
�, ( lFr !✓I r Gd vr1 �
� �% 'yid �� >rSx �3!�f
�HtRfia��'M