Loading...
HomeMy WebLinkAbout30573_NC DOT_20020212�CAMA / ❑ DREDGE & FILL 0573 GENERAL PERMIT Previous Permit# ❑flew ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued � i As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC z - ❑ Rules attached. Applicant Name JtiT Project Location: County Cr ;Z Address tto , Street Address/ State Road/ Lot #(s) City State ZIP i. +� `` f `Fax # k. 0 1 1:✓F !' Phone # ( ) r ( ) Subdivision Authorized Agent _ ", City ZIP Affected ❑ cw EW PTA ❑ ES" 2PTS Phone # ( ) j River Basin - AEC(s): EloEA ElHHF ❑ IH ElUBA El N/A Adj. Wtr. Body i ? \ (nat /man /unkn) ❑ PWS: ❑ FC: ORW: yes/ no PNA -yea:J no Crit. Hab. yes ! no Closest Maj. Wtr. Body Type of Project/ Activity Pier (dock) length Platform(s) Finger pier(s) Groin length number Bulkhead/ Riprap length_ avg distance offshore_ max distance offshore Basin, channel cubic yards Boat ramp Boathouse/ Boatlift Beach Bulldozing Other Shoreline Length SAM not sure yes no Sandbags: not sure yes no -- Moratorium: n/a yes no Photos: yes i no Waiver Attached: yes no A building permit may be required by: Notes/ Special Conditions Agent or Applicant Printed Name t , Signature Please read compliance statement on back of permit Application Fee(s) Check # (Scale: ) See note on back regarding River Basin rules. Permit Officer's Signature Issuin Date Expiration Date 1 Local Planning Jurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certifythat this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-395-3900) for more information on how to comply with thesebuffer rules. Division of Coastal Management Offices Central Office Elizabeth City District Mailing Address: 1367 U.S. 17 South 1638 Mail Service Center Elizabeth City, NC 27909 Raleigh, NC 27699-1638 252-264-3901 Location: Fax: 252-264-3723 Parker -Lincoln Building 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 / 1-888-411COAST Fax:919-733-1495 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Morehead City District 151-13 Hwy. 24 Hestron Plaza II Morehead City, NC 28557 202-808-2808 Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-395-3900 Fax:910-350-2004 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 10/05/01 STATE OF NOR-TI ' " ' r DEPARTMENT OF TRANSPORTATION DIVISION 02 OFFICE P. O. BOX 1587 GREENVILLE, NC 27835 Pay Pay N.C.D.E.N.R. to the * Drder of GREENVILLE, NC 27835 WARRANT NO. 944 0 DATE 02/11/2002 66-1059 STATE TREASURER, RALEIGH, NORTH CAROLINA 531 PAYABLE AT PAR THROUGH FEDERAL RESERVE SYSTEM Ile0000944011' I:0 5 3 1 10 594': ci"'00011164 2►'■ ootu��i.��-ia-��►-yaw-� o NE' 2CR0-;2ER01ER100+2ER0-�2ER0 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Micheal Easley DIVISION OF HIGHWAYS Lyndo Tippett GOVERNOR SECRETARY FEB 2,3 ?Ca? February 6, 2002 MEMORANDUM TO: Sandy SfRi PEAR, FROM: Jay B. Johnson, Division Environmental Officer SUBJECT: Permit application fee request I need one $100.00- peek payable to N.C. DENR This is for a CAMA General Permit on SR 1161 in Carteret County for a pipe replacement. Division Two * P.O. Box 1587 • Greenville, N.C. 27835 Foam DCM-MP-5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major Perm t, VOrm DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. 1. BRIDGES N/A a. Public Private b. Type of bridge (construction material) c. Water body to be crossed by bridge d. Water depth at the proposed crossing at MLW or NWL e. Will proposed bridge replace an existing bridge? _ Yes No If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain). f. Will proposed bridge replace an existing culvert(s)? Yes No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) g. Length of proposed bridge h. Width of proposed bridge L Height of proposed bridge above wetlands j. Will the proposed bridge affect existing water flow? _ _Yes No If yes, explain k. Navigation clearance underneath proposed bridge Will the proposed bridge affect navigation by reducing or increasing the existing navigable °lasing? Yes _ eta If yes, explain in. Will the proposed bridge cross wetlands containing no navigable waters? Yes No If yes, explain n. Have you contacted the U.S. Coast Guard concerning their approval? Yes No If yes, please provide record of their action. 2. CULVERTS a. Water body in which culvert is to be placed Tributary to Adam's Creek b. Number of culverts proposed 2 @a 55" x 73" x 60' c. Type of culvert (construction material, style) Aluminum d. Will proposed culvert replace an existing bridge? Yes X No If yes, (1) Length of existing bridge (2) Width of existing bridge_ (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) Form DCM-MP-5 e. Will proposed culvert replace an existing culvert? X ^Yes No If yes, (1) Length of existing culvert 1= 30', 2=32', 3=32' (2) Width of existing culvert1=24", 2=24" 3=18" (3) Height of the top of the existing Culvert above the MHW or NWL_ 1=1'. 2=.5', 3=17' (4) Will all, or a part of, the existing culvert be removed? (Explain)Yes, The existing culvert will be removed and re laced with the new culvert. f Length of proposed culvert 2 @ 60' g. Width of proposed culvert 73"ea. h. Height of the top of the proposed culvert above the MHW or NWL 1.0 ft. I. Will the proposed culvert affect existing water flow? Yes _-X_No If yes, explain _ j. Will the proposed culvert affect existing navigation potential? Yes X No If yes, explain 3. EXCAVATION AND FILL a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? X _Yes _ No If yes, (1) Length of area to be excavated 66' (2) Width of area to be excavated 16' (3) Depth of area to be excavated 2' (4) Amount of material to be excavated in —cubic yards 80 cuyd. b. Will the placement of the proposed bridge or culvert require any excavation within: X Coastal Wetlands SAVs Other Wetlands If yes (1) Length of area to be excavated 66' (2) Width of area to be excavated 16' (3) Amount of material to be excavated in cubic yards 80 cu yds_ c. Will the placement of the proposed bridge or culvert require any highground excavation? X Yes No If yes, (1) Length of area to be excavated 50' (2) Width of area to be excavated 25' (3) Amount of material to be excavated in cubic yards 100 d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area Temporary spoil area is exists Ad bed (2) Dimensions of spoil disposal area 20' g 30' at pine crossing (3) Do you claim title to the disposal area? X Yes No If no, attach a letter granting permission from the owner. (4) Will the disposal area be available for firture maintenance? X Yes No (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes X No If yes, give dimensions if different from (2) above. (6) Does the disposal area include any area below the MHW or NWL? Yes X No If yes, give dimension if different from No. 2 above. e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed below MHW or NWL? X Yes No If yes, — — (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill place rip -rap slope protection at ends of pipe f Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: X_Coastal Wetlands SAVs Other Wetlands If yes, (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill rip -rap slope protection at ends of pipe Form DCM-MP-5 g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? Yes X No If yes, (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill 4. GENERAL a. Will the proposed project involve any mitigation? Yes X No If yes, explain in detail b. Will the proposed project require the relocation of any existing utility lines? Yes X No If yes, explain in detail c. Will the proposed project require the construction of any temporary detour structures? Yes X No If yes, explain in detail d. Will the proposed project require any work channels? Yes X No If yes, complete Form DCM-MP-2 e. How will excavated or fill material be kept on site and erosion controlled? Silt fence f What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? Typical Bridge construction equipment g. Will wetlands be crossed in transporting equipment to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? Yac X No NCDOT-Carteret SR 1161 (Tuttle's Grove Rd.) Applicant or Project Name Signature Feb. 8, 2002 Date I I �'Z�/o"�r�Nr aLp,�s ��lovEo S iR/�«d, r✓/, c �5 x �3' �fflN �edllf Go}lLrt� lJ a- 1 l..l. :, fig II 0 All --L�At,C I I � 1 � I f v O'd rLi I or 00 f, EM-MM® Form DCM-MP-5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. 1. BRIDGES N/A a. Public Private b. Type of bridge (construction material) c. Water body to be crossed by bridge d. Water depth at the proposed crossing at MLW or NWL e. Will proposed bridge replace an existing bridge? _ _Yes No If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain). f Will proposed bridge replace an existing culvert(s)? Yes No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) g. Length of proposed bridge j. Will the proposed bridge affect existing water flow? _ _Yes No If yes, explain k. Navigation clearance underneath proposed bridge 1. Will the proposed bridge affect navigation by reducing or increasing the existing navigable apening? Yes _ No If yes, explain in. Will the proposed bridge cross wetlands containing no navigable waters? Yes No If yes, explain n. Have you contacted the U.S. Coast Guard concerning their approval? Yes No If yes, please provide record of their action. 2. CULVERTS a. Water body in which culvert is to be placed Tributary to Adam's Creek b. Number of culverts proposed 2 @ 55" x 73" x 60' c. Type of culvert (construction material, style) Aluminum d. Will proposed culvert replace an existing bridge? Yes X No If yes, (1) (2) (3) Length of existing bridge. Width of existing bridge_ Navigation clearance underneath existing h. Width of proposed bridge the existing bride be i. Height of proposed bridge above wetlands (4) Will all, or a part of, g g p p g removed? (Explain) Form DCM-MP-5 e. Will proposed culvert replace an existing culvert? c. Will the placement of the proposed bridge or culvert X Yes ` No require any highground excavation? If yes, X Yes No (1) Length of existing culvert 1= 30', 2=32'1 If yes, 3=32' (1) Length of area to be excavated 50' (2) Width of existing culvert 1=24 , 2=24", (2) Width of area to be excavated 25' 3=18" (3) Amount of material to be excavated in cubic (3) Height of the top of the existing culvert above yards 100 the MHW or NWL 1=1', 2=.5', 3=37' d. If the placement of the bridge or culvert involves any (4) Will all, or a part of, the existing culvert be excavation, please complete the following: removed? (Explain)Yes, The existing culvert (1) Location of the spoil disposal area will be removed and replaced with the new Temporary spoil area is existing road bed culvert. (2) Dimensions of spoil disposal area f Length of proposed culvert 2 @ 60' 20' x 30' at pipe crossing g. Width of proposed culvert 73"ea. (3) Do you claim title to the disposal area? h. Height of the top of the proposed culvert above the X Yes No MHW or NWL 1.0 ft. If no, attach a letter granting permission from the owner. i. Will the proposed culvert affect existing water flow? (4) Will the disposal area be available for future Yes X No maintenance? X Yes No If yes, explain (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes X No j. Will the proposed culvert affect existing navigation If yes, give dimensions if different from (2) potential? Yes X No above. If yes, explain (6) Does the disposal area include any area below the MHW or NWL? Yes X No If yes, give dimension if different from No. 2 3. EXCAVATION AND FILL above. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? X Yes — _ No If yes,_ (1) Length of area to be excavated 66' (2) Width of area to be excavated 16' (3) Depth of area to be excavated 2' (4) Amount of material to be excavated in cubic yards 80 cuyd. b. Will the placement of the proposed bridge or culvert require any excavation within: X Coastal Wetlands SAVs Other Wetlands If yes (1) Length of area to be excavated 66' (2) Width of area to be excavated 16' (3) Amount of material to be excavated in cubic yards 80 cu yds_ Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed below MHW or NWL? X Yes _ _No If yes, (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill place rip -rap slope protection at ends of pipe f Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: x Coastal Wetlands SAVs Other Wetlands If yes, (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill rip -rap slope protection at ends of pipe .. Form DCM-MP-5 g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? Yes X_ No If yes, (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill 4. GENERAL a. Will the proposed project involve any mitigation? Yes X No If yes, explain in detail b. Will the proposed project require the relocation of any existing utility lines? Yes X No If yes, explain in detail c. Will the proposed project require the construction of any temporary detour structures? Yes X No If yes, explain in detail d. Will the proposed project require any work channels? Yes X No If yes, complete Form DCM-MP-2 e. How will excavated or fill material be kept on site and erosion controlled? Silt fence f. What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? Typical Bridge construction equipment g. Will wetlands be crossed in transporting equipment to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? YPc X No NCDOT-Carteret SR 1161 (Tuttle's Grove Rd.) Applicant or Project Name Signature Feb. 8, 2002 Date SIAP II �, /✓ RE�IvEt� g I n :)F �, ( lFr !✓I r Gd vr1 � � �% 'yid �� >rSx �3!�f �HtRfia��'M