HomeMy WebLinkAbout55343_PURIFOY, ANDY_20100503❑CAMA % ❑ DREDGE & FILL
GENERAL PERMIT ��
❑New ❑Modification [-]Complete Reissue ❑Partial eissue
1&6
Previous permit #
Date previous permit issued
175343-�:.
3
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC— >�L�
EiRules attached.
Applicant Name h n 61 t mil/ Project Location: County Vo_.n
Address " f 11 13 Street Address/ State Road/ Lot #(s) i 4% rz%
City t :�;' t i*0 IN State ZIP �.
Phone # (�
Authorized Agent
Pax •#
❑ CW ❑ EW ❑ PTA
Affected
AEC(s):
❑ OEA ❑ HHF ❑ IH
❑ PWS: ❑ FC:
ORW:
yes / no PNA yes / no
Cl E-$ XPTS
❑ UBA ❑ N/A
�M.
Crit.Hab. yes / no
Subdivision
City (' i If - t ZIP
Phone # River Basinyi [I'
Adj. Wtr. Body 1 > i / (nat YmaT n /unkn)
Closest Maj. Wtr. Body-�� r Ve
'SOMEONE■■■'1INNEEME No ■■■■■w■
::.......::.
.■�■■■■■■
Elm■:®ME
■:.�■:■■■■■
■■■■■■■®w■®■■®■■■®■■■■■■■
■
■■■■■■
■■■■■■■■■■■■®■■■■■■■■■■■
El
■■::::■i■:■■EEMEMi■iiM-:EEMNE
■
1��
■■■■■!■■■■■
-
■■■■■E■■■®■
/�!
9WL*.ter■�
■.��I■■.1i1■■�
::�::::::::■::
�i■m■■■■:®■■■
MEEM
■■■■■■■■■■■■■■
i!■■■■■■■:■■■W■■■■■■
■■::■■■■■■ NEEMONEComs
I
MENE
::::■::■:::
011MEW:
MENEMEE
ON■w■■■■■..■■■:■..■■■■MMEME
'01PNO
MEEMN
Elm
MEN
11
..
~-C) t
Agent or Applicant Printed Name :' }
Signature "Please read compliance statem nton back of permit"
r 9r�
Application Fee(s) Check #
Permit Off er' Signature
Issuing Date.'
Expiration Date
Local Planning Jurisdiction
Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certifythat this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office Morehead City Headquarters
Mailing Address: 400 Commerce Ave
1638 Mail Service Center Morehead City, NC 28557
Raleigh, NC 27699-1638 252-808-2808/ I-888-4RCOAST
Location: Fax: 252-247-3330
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax:919-733-1495
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax:252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax:910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 08/09/06
... .X ,r r �; Aim ' �;'��_ (i, j f.r a• s, . ' : �,, ,,; •� ,
T.
.7
\ ct
Nease
/ v �
Ol
r
a� --� tcllin
oep--S-. 3 3 3
Qj
5 �
1*7
i
-v
317(-��d
l "
Cnvisjon of Coastal Mgt. Habitat IrrPact Computer Sheet
Applicant Andy Purifoy
Date: May 3, 2010
General Permit #: 55343C
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
TOTAL Sq. Ft.
FINAL Sq. Ft.
TOTAL Feet
FINAL Feet
(Applied for.
(Anticipated final
(Applied for.
(Anticipated final
DISTURB TYPE
Disturbance total
disturbance.
Disturbance
disturbance.
Habitat Name
Choose One
includes any
Excludes any
total includes
Excludes any
anticipated
restoration
any anticipated
restoration and/or
restoration or
and/or temp
restoration or
temp impact
temp impacts)
impact amount)
temp impacts)
amount
Sg
Dredge ❑ Fill ❑ Both ElOther O
100
100
HG
Dredge ElFill ElBoth ElOther IF]
100
100
SB
Dredge ❑ Fill ElBoth ElOther El
240
240
H G
Dredge ElFill O Both ElOther ❑
480
480
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
252A80 -2 0 :. 1-888-4RCOAST ;. .nce0asta s s s _e # revised:02/03110
CAROLINA STONE LLC 8804
PH. 252-524-4702 6s-112/531
5591 NC HIGHWAY 118
GRIFTON, NC 28530-8835
DATE 5
TO THE
PAY
ORDER OF
Q C� DOLLARS o„
9ackls
i i ♦ BRANCH
1.epywBANCBB WT.CanNG AND TRUST MPANY
FOR
II.0000880 41I' l:0 5 3 L0 L L 2 0:000 5 L 9 5 6 2 5 5 401I■
k;-
NCDLNR
�iorth Carolina DeGar:rrnent of Environment and i\lat'ural i{ 5ti l�cS
Division of Coastal Management
Beverly Eaves Perdue James H. Gregson Dee reernan
Governor Director secretary
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico &
Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0233 & .0259.
The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of
Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies
with the aforementioned regulations, and made a "no practical alternatives" determination per those
regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer
Authorization as long as the project is constructed in a manner that continues to meet all of the conditions
listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party
(contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per
violation.
1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM.
The alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of
pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules
to the maximum extent practicable.
s. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way.
This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the conditions listed above and
verify that all information provided is complete and accurate.
Rl \0
lr�qte e.
Agent WAISplica
/ LAMA GENERAL PERMIT #: 3�
36
Washington Office
943 Washington Square Mall
Washington, NC 27889
Phone 252-946-6481
Morehead City Office
400 Commerce Avenue
Morehead City, NC 28557
Phone 252-808-2808
A�J_ rom�j
Pe mit Officer's Signature
_5e-to
Issue Date
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper
Version 5, 09/2009