Loading...
HomeMy WebLinkAbout52670_PIERCE, TOM_20081209I CAMA / 11 DREDGE & FILL 12 -10 &/15 le GENERAL, PERMIT Previous permit # EINew EModification ElComplete Reissue [-]Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC F1 Rules attached. Applicant Name i Project Location: County_ AddressStreet Address/ State Road/ Lot #(s)__ City--- State ZIP Phonefl Fax # O Subdivision Authorized Agent City ZIP Affected L Cw El EW L] PTA Ll ES El PTS Phone# River Basin 0 OEA 0 HHF 1-1 1H 0 UBA El N/A AEC(s): Adj. Wtr. Body gnat Imarv. /unkn 0 PWS: [I FC: ORW: yes / no PNA yes / no Crit.Halb. yes no Closest Maj. Wtr. Body Type of Project/ Activity (Scale: i Pier (dock) length_ Platform(s) Finger pier(s) Groin length number Bulkhead/ Riprap length avg distance offshore max distance offshore Basin, channel cubic yards Boat ramp Boathouse/ Boatlift T4- F. A; i T Z F I T- --K iT-1 -Z Beach Bulldozing Other 44+--1 4J Shoreline Length SAV: not sure yes no Sandbags: not sure yes no Moratorium: n/a yes no Photos: yes no Waiver Attached: yes no A building permit may be required by: Notes/ Special Conditions rules. See note on back regarding River Basin Agent or Applicant Printed Name Signature "Please read compliance statement on back of permit" Application Fee(s) Check # PermitOfficer's Signature Z/ Issuing Date E iration Date Local PlanningJuriscliction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Morehead City Headquarters Mailing Address: 400 Commerce Ave 1638 Mail Service Center Morehead City, NC 28557 Raleigh, NC 27699-1638 252-808-2808/ 1-888ARCOAST Location: Fax: 252-247-3330 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax:910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 bwA AG,�. NCDENR y North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor James H. Gregson, Director William G. Ross Jr., Secretary Date d--��- Applicant Name, Mailing Address 6 I certify that I have authorized (agent) - to act on my behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to install or construct (activity) at (location) This certii Signature is valid thru (date) 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX: 252-247-33301 Intemet: www.nccoastaimanagement.net An Equal Opportunity 1 Affirmative Action Employer— 50% Recycled 110% Post Consumer Paper Sep.16. 2008 4:10PM CENTURY 21 ZAYTOUN—RAINES No.1220 P. 1 ADJACENT *ARLA-N PROPERTY OWNER OATEMENT I hereby certify that I own property adjacent to UI 1A P—j i� Corn I�'2�,�'s (Name of Property Owner) property located at c2� D if_ I L) Ut N __L1 P,��� (Lot, Block, Road, etc.) on �~ �T�C� QtJ Q���I��IFI?m N.C. (Waterbody) (Town an or County) Applicant's phone #: 253 ` a� - �� Mailing Address: a� DJDeN � 12 Q � He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. ------------------------------------------------------------ 7--------------------------------------------- DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT: (To be filled in by property owner proposing development) (Information for Property Owner Applying for Permit) e Mailing Address City/State/Zip 6� C'�g - � � Telephone Number Signature Dale. (Riparian Property wner ormation) 4s,ature Print or Type Mme 90? -69 � - 7 7 6 3 Telephone Number Date No.7220 P. 8 Sep.16. 2008 4:10PM CENTURY 21 ZAYTOUN—RAINES ADJACENT 19ARIAN PROPER AATT'E' INTENT oI herebycertify that I own property adjacent ts ,(Name of Property Owner) property located at 2� 1 `��'�"' (�c (Lot, Block, Road, etc.) on , in , N.C. (Waterbody) (Town and/or County) Applicant's phone #: Mailing Address: He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. iING OF PROPOSED DEVELOPMENT: -ty owner proposing development) -------------------------------------------------------------------------------------------------------------- (Information for Property Owner Applying (Riparian Property Owner information) for Permit) Maunng aaaress City/State/Zip Telephone Number Signature Print or Type Name Telephone Number Signature Date Date VI L Y-1*7"-1:0CK AAO ie Jt-,4 X r �lLc -Ali O6A- l 6--r /rV t.i� C—e&—r a. 7 mwe-%L �017" 0 i ® Pf l J<cwr- t2lOF es. r (/rC'k'rovG Ljo �oT �� c.4z-c— �_ EFA ) � 06 �-1- It f i1,0160 AA&&-)o,' W A-U— Uc BOBBY CAHOON MARINE CONSTRUCTION AND LAND DEVELOPMENT DBA BOBBY CAHOON CONSTRUCTION, INC. 6003 NEUSE RD. GRANTSBORO, NC 28529 PH (252) 249-1617 PAY TO THE ORDER OF _ WACHOVIA BANK, NA BAYBORO, NC 28515 66-21 /530 DOLLARS � li 110006 1091I■ I:0 5 3000 2 191: 20000 17 68l-,8 281I' 4_1Q Michael F. Easley, Governor Q William G. Ross Jr., Secretary (5 " r North Carolina Department of Environment and Natural Resources E Coleen H. Sullins, Director Chuck Wakild, Deputy Director BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Tar - Pamlico & Neuse River basins per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0233 & .0259. Activities covered by your Coastal Area Management Act (CAMA) permit are deemed to have a Buffer Authorization from the DWQ only if the project can meet ALL of the conditions listed below. If ALL the avoidance and minimization guidelines described below cannot be met, a separate buffer authorization request must be submitted using a Pre -Construction Notification (PCN) application to DWQ at the address below. A PCN application may be obtained on the DWQ web site http://h2o.enr.state.nc.us/wetlands.html. Questions regarding this process should be directed to wetland/buffer staff of the DWQ in the Washington Regional Office at 252-946-6481, or the 401 Oversight Unit in the Raleigh Central Office at 919-733-6893. A written authorization from DWQ MUST be received prior to any construction activities in the riparian buffer, including land clearing. Failure to secure a Buffer Authorization prior to construction &/or land clearing shall subject the property owner & the party (contractor) performing -the construction &/or land clearing to a civil penalty of up to $25,000 per day per violation. ❑ Minimize removal of woody vegetation in Zone 1 to what MUST be removed for the installation of the shoreline stabilization project. Zone 1 begins at the most landward of either the waters edge or the coastal wetland line and extends 30 feet landward. Unnecessary clearing is a violation of the riparian buffer rules and may result in a civil penalty assessment of up to $25,000 per day per violation. ❑ The property owner is responsible for site restoration of woody vegetation. Pre -project site conditions MUST be re-established. A site that was wooded prior to this shoreline stabilization project MUST be restored with native hardwood trees at a stem density of 320 trees per acre. Hardwood restoration must be completed by the first subsequent planting season (November 1 through March 30). ❑ Disturbance in Zone 2 of the riparian buffer, which begins at the landward edge of Zone 1 and extends 20 feet is restricted to uses listed under 15A NCAC 2B .0233(4)(b) & (6), and 15A NCAC 2B.0259(4)(b) & (6). Clearing and grading of Zone 2 is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused flow of storm water runoff through Zone 1. North Carolina Division of Water Quality Internet: www.ncwaterquality.org One 943 Washington Square Mall Phone: 252-946-6481 NorthCarof ina Washington, NC 27889 FAX 252-946-9215 ;Vaturail'ff An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper Page 2 ❑ For vertical shoreline stabilization projects (bulkhead) only; sites where wave overwash is expected to be severe, the first ten (10) feet landward from the structure may be maintained as a stable lawn in order to provide for structural stability. This certificate condition is intended to apply only to projects adjacent to larger water bodies where the conditions may routinely produce severe overwash. ❑ Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored, see the first condition of this authorization. ❑ When restoration is required Please submit a project map of your property indicating the area to be restored, and a restoration plan. The DWQ website (Helpful links), http://h2o.enr.state.nc.us/ncwetlands/RiparianBufferRules.htm may be helpful in the preparation of the restoration plan. This Buffer Authorization is not considered approved until the DWQ has received both this signed form AND the project map. Submit the requested information to: Division of Water Quality Attn: Surface Water/Buffer Program 943 Washington Square Mall Washington, NC 27889 By your signature below you agree to be held responsible for meeting ALL of the above listed conditions and verify that all information is complete and accurate. Only the property owner is responsible for the second condition. Please be aware, violations of the above -listed conditions are subject to civil penalty assessment of up to twenty-five thousand dollars ($25,000) per violation per day. Applicant/Agent's Signature CAMA General Permit Number: �5_1670 C North Carolina Division of Water Quality Internet: www ncwaterauaht -.org 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper Date Nne orthCarolina ,Xatur=ally