Loading...
HomeMy WebLinkAbout52271_NC DOT_20080924❑ CAMA / []DREDGE & FILL _ A a 12 GENERAL PERMIT ,� Previous permit# ❑New ❑Modification ❑Complete Reissue []Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC r ." i ❑ Rules attached. Applicant Name Address City State ZIP Phone # O Fax # O Authorized Agent Affected ❑ CW ❑ EW ❑ PTA ❑ ES ❑ PTS AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A ❑ PWS: ❑FC: ORW: yes / no PNA yes / no Crit.Hab. yes / no Project Location: County Street Address/ State Road/ Lot #(s) Subdivision City ZIP Phone # ( ) River Basin Adj. Wtr. Body (nat /man /unkn) Closest Maj. Wtr. Body Type of Project/ Activity (Scale: ) Pier (dock) length Platform(s) Finger pier(s) Groin length number Bulkhead/ Riprap length avg distance offshore max distance offshore Basin, channel cubic yards Boat ramp Boathouse/ Boatlift Beach Bulldozing Other c r — r — I Shoreline Length SAV: not sure yes no i i I Sandbags: not sure yes no —17 Moratorium: n/a yes no Photos: yes no Waiver Attached: yes no A building permit may be required by: ❑ See note on back regarding River Basin rules. Notes/ Special Conditions or Applicant Printed Name "Please read compliance statement on back of permit" Permit Officer's Signature Issuing Date Expiration Date Fee(s) Check# Local Planning jurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that I) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certifythatthis project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Morehead City Headquarters Mailing Address: 400 Commerce Ave 1638 Mail Service Center Morehead City, NC 28557 Raleigh, NC 27699-1638 252-808-2808/ 1-888-4RCOAST Location: Fax: 252-247-3330 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax: 9 19-733-1495 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax: 252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax:910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY LYNDO TIPPETT GOVERNOR SECRETARY July 29, 2008 Jim Hoadley Division of Coastal Management 1367 U.S. 17 South Elizabeth City, N.C. 27909 Subject: Request for a general permit .2000 for the installation of a wave attenuator at the old ferry dock ramp facility in Oregon Inlet Marina. The North Carolina Department of Transportation is requesting a GP .2000 for the placement of a temporary wave attenuator. This will provide protection from waves that often occur during strong south winds. This temporary floating structure totals 40 feet in length by 8 feet wide and is comprised of 10 ft. floating concrete sections. This will be held in place by attaching it to two existing dolphin clusters as showri in the provided illustration. There will be no new pilings placed for the attachment. Once the repair work is finished on the Bonner Bridge the wave attenuator will be removed. NCDOT has requested a modification to the NPS Special Use permit for the installation of this device. A copy of the authorization from the NPS is included with this letter along with an illustration, MP-1 and MP-5 forms, and location map. If you have any questions or need additional information, please call Clay Willis at 252-482-7977. Sincerely, Jerry Jennings, Division Enp-in Clay Willis '�'�� Environmental upervisor 113 Airport Dr., Suite M, Edenton, NC 27932 — Phone: (252) 482-7977 Fax: (252) 482-8722 13 I DEC (n ;G v� \j � t 'I Al „ Project Location -,tfw-a { e: Oregon Inlet Fishing Center -75.5488857 35.796639 vPcf a - Hacring $Hc�l r� 14and 1. + �.. 9.t at, rim, I . j r A 4 � J' swtr. > -It V '' a •(, ?k11 nw 0 1 2 4 Miles arriicanox for Major Development Perm (last revised 12127/06) 1. Primary Applicant Landowner Information Business Name Ncdot Project Name (if applicable) Wave Attenuator Applicant 1: First Name Clay MI Last Name Willis Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address 113 Airport Drive Suite 100 PO Box 1 1 City Edenton State N.C. ZIP 27932 Country us Phone No. 252 - 482 - 7977 ext. 221 FAX No. 252 - 482 - 8722 Street Address (if different from above) City State ZIP FtcEail willis@ncdot.gov 2. AgentContractor Information Business Name Agent/ Contractor 1: First Name MI Last Name Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State ZIP Phone No. 1 - - ext. Phone No. 2 - ext. FAX No. Contractor # Street Address (if different from above) City State ZIP Email <Form continues on back> 2 s2-808-2808 — 1-888-4R OAST -, � WIN.31cc0�4st r anasger-lent. net Form DCM MP-1 (Page 2 of 5) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Dare Outer Banks Fishing Center Subdivision Name City State Zip NC - Phone No. Lot No.(s) (if many, attach additional page with list) - - ext. a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Pasquotank Oregon Inlet c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ❑Natural ®Manmade ❑Unknown Atlantic Ocean e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ❑Yes ®No work falls within. 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 50 ft 20000 sq. ft. c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) (If many lot sizes, please attach additional page with a list) 5 feet ®NHW or ❑NWL e. vegetation on tract maintained lawn area primarily containing bermuda grass f. Man-made features and uses now on tract parking lot, boat ramp, docks, ferry terminal and loading ramp, marina g. Identify and describe the existing land uses ad_ a� cent to the proposed project site. commercial property for recreational fishing including boat ramps, parking lot, marina. Also adjacent property includes Coast Guard Service Station h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? n/a (Attach zoning compliance certificate, if applicable) ❑Yes ❑No ®NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes []No ®NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ❑No ®NA National Register listed or eligible property? <Form continues on next page> m. (i) Are there wetlands on the site? ®Yes No (ii) Are there coastal wetlands on the site? ®Yes ❑No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes ®No (Attach documentation, if available) 2 5 2 - 8 08-'2 8 0 8 , 1- - A T �rava.nc� + tat a a ers: �a � et Form DCM MP-1 (Page 3 of 5) APPLICATION for Major Development Permit n. Describe existing wastewater treatment facilities, Marina has public restrooms o. Describe existing drinking water supply source. County water p. Describe existing storm water management or treatment systems. stormwater drains from adjacent parking area into grassed lawn areas 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial Public/Government ❑Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The wave attenuator is being temporarily placed to provide protection from strong southerly winds for the inspection boat. The attenuator will only be in place for the time frame the Bonner Bridge Repair is taking place. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. The wave attenuator is a concrete floating dock that will be towed into place through the water. It will be attached to two existing dolphin clusters by a metal bracket which will be bolted to the dolphin. The bracket will hold the floating dock in place and also allow it to rise and fall with the tide change. d. List all development activities you propose. Placement of a floating dock to act as a wave attenuator. e. Are the proposed activities maintenance of an existing project, new work, or both? new f. What is the approximate total disturbed land area resulting from the proposed project? None ❑Sq.Ft or []Acres g. Will the proposed project encroach on any public easement, public accessway or other area []Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. None i. Will wastewater or stormwater be discharged into a wetland? ❑Y s ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? []YES []No ❑NA j. Is there any mitigation proposed? ❑Y s SNo ❑NA If yes, attach a mitigation proposal. <Form continues on back> 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be si ibmitted in order for the application package to be complete. Items (a) — (t) are always applicable to any major development application. P ease consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate oM maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. 252- 00-2 .. I- aS-4PC ST .. Form DCM MP-1 (Page 4 of 5) APPLICATION for Major Development Permit d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Cape Hatteras National Seahshore - National Park Service Phone No. Address 1401 National Park Drive, Manteo, N.C. 27954 Name Phone No. Address Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. National Park Service Special Use Permit h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. l further certify that the information provided in this application is truthful to the best of my knowledge. Date _ 1�Z:%� Print Name -lT ��l�S Signature r' Please indicate application attachments pertaining to your proposed project. ❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development ®DCM MP-4 Structures Information 2 5 2 - 8 0 8 -23t33 1-833-4R A T .. .siccoostai are a --e t.net Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS ® This section not applicable a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public? ❑Commercial ❑Public/Government ❑Private/Community ❑Yes ❑No c. (i) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? ❑Yes []NO (ii) Number If yes: (iii) Length (ii) Number (iv) Width (iii) Length (v) Floating ❑Yes ❑No (iv) Width (v) Floating ❑Yes ❑No e. (i) Are Platforms included? ❑Yes ❑No f. (i) Are Boatlifts included? []Yes ❑No If yes: If yes: (ii) Number (ii) Number (iii) La ngth (iii) Lan gth (iv) Width (iv) Width (v) Floating []Yes ❑No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or (ii) Number of slips existing maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage ("wet slips") only, number of slips: ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: i. Check the proposed type of siting: ❑ Land cut and access channel []Open water; dredging for basin and/or channel ❑Open water; no dredging required ❑Other; please describe: k. Typical boat length: m. (i) Will the facility have tie pilings? ❑Yes ❑No (ii) If yes number of tie pilings? j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). I. (i) Will the facility be open to the general public? ❑Yes []No 2. DOCKING FACILITY/MARINA OPERATIONS ® This section not applicable 252-8 8-2808 ;a -1-6;58-4 :-r,0AaT :u vraaav-,#,nccoas1a1 manage ent.net revjsadf 1212V'106 a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: ; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h• Give the number of channel markers and "No Wake" signs proposed. I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes ❑No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aq (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. j]CW ❑SAV ❑SB ❑WL ❑None vegeranon t�:)Hv), 252- 08-2808 :: 1-838-4RC43AST ., uvwvv.ncca�as�a7sr����s����r�i.�e� rye raked; 12/27,�06 T r j DCM Pm ( tTuctures, Page 3 of 4) p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? []Yes []No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ® This section not applicable a. (1) Is the boathouse structure(s): ❑Commercial ❑Public/Government ❑Private/Comm unity (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ® This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ❑ This section not applicable a. Length 40 feet b. Average distance from NHW, NWL, or wetlands 50 ft. c. Maximum distance beyond NHW, NWL or wetlands 60 ft. 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): b• Number ❑Commercial ❑Pub)WGovernment ❑Private/Comm unity c. Distance to be placed beyond shoreline d. Description of buoy (color,i inscription, size, anchor, etc.) Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines Within the NPS property boundaries b. Proximity of structure(s) within the old ferry do public boat ramps at Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body d. Water depth at 350 feet 6-8 ft. e. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. adjacent docking facilities. structure , which is adjacent to the saon Inlet I end of structure at NLW or NWL 8. OTHER ❑ This section not applicable 52-808-203 :; 11-8a8-4RC+C AST :: revisal: 92i2710; Form -CPA PAP-4 PAP-tStructueas, R*ge 4 of 4) a. Give complete description: The wave attenuator is 40 feet by 8 feet in length and comprised of a floating concrete material. This will be towed in place and attached to two existing dolphin clusters as shown in the photograph illustration and drawing. This is will provide protection for the inspectors boat during strong south winds. Once the Bonner Bridge repair is complete this wave attenuator will be removed. There will be no new piles or shoreline work associated with this temporary structure. VIM . Date Project Name Annlirant dame Applicant Signature s U �PAI 2 r'2-80 -2808 ;: 'I-838-t$ x. OAST :; aru�ror�_rac�cs��ta�u�a������er�t.rs�� revised., 12127/06 70 This section will he towed to the Cherry Breach Ferry a I Yn m k r�. �• sty `L')S- � C F ✓� '�' � '� � � qJ �. F 82 ft wide by 10.0 ft long sections joined together by double 4"x12" timber bands. f � tf a1,01 —i �� + 1 1 1 1 r I 1 .}..,_ - �-- <- "f-- ! f- Y _:- �. �•^ �^- ���1-!=! Sti1�0�� ice_ I ( I--+ I _ 1 T y - I r - ! _I�—' I 16i { ►.i 1-1 1 �'�i-� _ + � , f f ,� %��%-�-Nr�1/7 � ,o �l�Yi>'1>�•!C-)fL `y y_ '_ _ —i ., _,� ( _ ' -44 6-7 tt �- � - - -- i - +- I' _. •��-�-��t�'1 �n �..� '�'J � - A ! - ff I -- ---r-- � b _ ' _ ' t 7 T } ) 1 1 1 � I ' I ' - -•. .- - N k t _ I - i _�_ t i - � _ 1 _j .� �- f-- - � --•- fir- , - � -•- • - G Zd 1-7 R --7 ---- t I I I . < � - �— •��i� --•- f r - -i - ...-_.— - � J , Eft S-it •.-�L-v � - • - - - - ' '*-• - Egli �►1 Gt __ - ;-- , i �- j ----- � — --- t r � _ _� -C � 9 ' a,na•-�F�L f Eye• - —, r- r , ' t + I 67 C p��tL�1 C Z70G Form 10-114 U.S. DEPARTMENT OF THE INTERIOR Rev. DEC. 99 National Park Service Special Use Permit Name Govt and Utilities - Staging Permit Review Date: of Use, of Equipment Permit Expires: Long Term ❑ Short Term F,1� Page 1 of 2 Dee. 31, 2009 Permit No.: GOV07 CAHA - 5700 461 Name of Area: Cape Hatteras National Seashore Clay Willis & North Carolina Department of of Transportation Name of Permittee Edenton, NC (252) 482-7977 Address Phone is hereby authorized during the period of 8:00:00 AM on 09 24, 2008 and expiring at Dec. 31, 2009, to use the following described land or facilities in the above named area: on and below the Bonner Bridge as situated in Oregon Inlet, Cape Hatteras National Seashore For the purpose(s) of: amending permit GOV07-CAHA-5700-461 to allow the installation of a waterline, electrical power takeoff and a wave attenuator as represented and documented by the Permittee to the Park. All other terms and conditions of the permit remain the same. Authorizing legislation or other authority (RE-DO-53): 36 CFR: Chapter 1, Part 2.50. NEPA Compliance: [*-/] Categorically Excluded ❑ EA/FONSI ❑ EIS ❑ Other Approved Plans Performance Bond: ❑ Required V Not Required Amount $0.00 Liability Insurance: ❑ Required W Not Required Amount $0.00 ISSUANCE of this permit is subject to the conditions on the reverse hereof and appended pages and when appropriate to the payment to the U.S. Department of the Interior, National Park Service, of the sum of $0.00. The undersigned hereby accepts this permit subject to the terms, covenants, obligations, anc reservations, expressed or implied herein. PERMITTEE Signature Authorizing Official, Darrell L. Echols Signature Deputy Superintendent Additional Authorizing Official (If Required) Signature PERMITTEE Title D e 9/24/2008 Date Date ADDENDUM Cape Hatteras National Seashore Special Use Permit #GOV07-CAHA-5700-461 1. The permittee shall exercise this privilege subject to the supervision of the Superintendent, and shall comply with all applicable laws and regulations of the area. 2. Damages - The permittee shall pay the United States for any damage resulting from this use which would not reasonably be inherent in the use which the permittee is authorized to make of the land described in this permit. 3. Benefit - Neither Members of, nor Delegates to Congress, or Resident Commissioners shall be admitted to any share or part of this permit or derive, either directly or indirectly, any pecuniary benefits to arise therefrom: Provided, however, that nothing herein contained shall be construed to extend to any incorporated company, if the permit be for the benefit of such corporation. 4. Assignment - This permit may not be transferred or assigned without the consent of the Superintendent, in writing. 5. Revocation - This permit may be terminated upon breach of any of the conditions herein or at the discretion of the Superintendent. 6. The permittee is prohibited from giving false information; to do so will be considered a breach of conditions and be grounds for revocation [Re: 36 CFR 2.32(a) (4)]. 7. Permittee will comply with applicable public health and sanitation standards and codes. 8. The permittee and all participants authorized herein must comply with all conditions of this permit including all exhibits, amendments and/or written directions of the Park Superintendent. 9. The permittee and all participants authorized herein must co ply with all conditions of this permit including all exhibits, amendments and/or wri en directions of the Park Superintendent. 10. This permit is applicable only for the use of the area(s) indic ted under the terms detailed on Special Use Permit (Form 10-114) and the additi nal provisions listed below. 11. Special Park Uses Coordinator is the Service's representativ regarding permit preparation and can be reached at (252) 473-2111, ext. 121. North District Ranger at (252) 441-7425 or his designee will serve as the Service's r resentative during the Project. The permittee must immediately notify the District Ranger in the event of any accidents or emergencies. 12. This permit authorizes the rebuilding/replacement of sectio s of the bridge structure all in accordance with the documents and maps filed with t e National Park Service in support of the Application for this Permit, also referred to a the "Plans for the Project". 13. This permit does not authorize exclusive use of any public ands. The permittee shall insure to the fullest practicable extent that the rights of the eneral public visiting Cape Hatteras National Seashore will not be infringed upo by this activity. 14. The authorized activities shall be suspended immediately s ould any unidentified archeological or other cultural resources be encountered wi in the permitted area. The Service's Resource Chief Thayer Broili, 473-2111, ext, 137 or Historian/Cultural Resources Manager Doug Stover, 473-2111, ext. 153 must be notified immediately. 15. The permittee will exercise particular care to avoid disturbing or destroying wildlife and vegetation. Night work will be suspended when Park Staff determine such activity could adversely impact wildlife nesting and breeding activities in the Park. Night work may be resumed when Park Staff determine no impact to wildlife is likely. 16. Permittee will use best efforts to minimize its vehicle and equipment interference with routine visitor traffic or use of park resources. Equipment utilized during the Project shall be strategically placed and operated as to avoid damage to ocean side dunes and/or marsh habitat. 17. The Permittee shall be responsible for providing traffic control at the sight and during the period from Memorial day to Labor Day will minimize week -end work at the sight so as to provide maximum traffic flow. 18. No staging of materials is permitted on Park property other than sites approved by the District Ranger. 19. The permittee must properly dispose of all refuse generated by the permitted activity. Clean up to the satisfaction of the Service is the responsibility of the permittee. The permittee shall be liable for any damages to any government property resulting from these activities. . 20. The Superintendent shall be notified in writing no less than fifteen (15) days prior to the start of initial construction on Park lands. The Permittee construc- tion/maintenance supervisor will contact the District Ranger on the morning of the first and last day of work, advising the location and extent of work crews and equipment in the Park. 21. No permanent buildings will be constructed at the staging areas and no workers or visitors will be housed or allowed to camp at the site; however, temporary trailer will be permitted if necessary for personnel and equipment and to accommodate night- watchmen for the contractor. 22. The Permittee and any of its Contractors or Sub -contractors shall comply with all State of North Carolina, Department of Environmental Quality and National Park Service rules and regulations during construction including, but not limited to, the handling and storage of fuel, oil and other liquids. 23. All construction vehicles will be pressure cleaned with water prior to arriving at and departing from the construction site to minimize the potential for introducing exotic plant species. North Carolina Highway 12 will be keep clean and free from debris. 24. Contractors/subcontractors will be informed about the special sensitivity of park values, regulations, and appropriate grounds maintenance during construction periods. 25. Safety fences and signs will exclude park visitors from construction and access areas. The Permittee will maintain fences and signs in good repair during project activities and promptly remove them following completion of construction. 26. To the extent that work undertaken under this permit is performed by other than the Permittee's employees, it shall require such person or corporation to: • Procure public and employee liability insurance from a responsible company or companies with a minimum limitation of One Million Dollars ($1,000,000) per person for any one claim, and an aggregated limitation of One Million Dollars ($1,000,000) for any number of claims arising from any one incident. The policies shall name the United States as an additional insured, shall specify that the insured shall have no right of subrogation against the United States for payments of any premiums or deductibles due thereunder, and shall specify that the insurance shall be assumed by, be for the account of, and be at the insured's sole risk. Prior to beginning the project authorized herein, COE shall provide the NPS written confirmation of such insurance coverage. Pay the United States the full value for all damages to the lands or other property of the United States caused by the said person or organization, its representatives, or employees. Indemnify, save and hold harmless, and defend the United States against all fines, claims, damages, losses, judgments, and expenses arising out of, or from, any omission or activity of the said person or organization, its representatives, or employees. 32. Mining the removal of natural substances such as sand and gravel is prohibited. 33. The permittee shall abide by and insure that all personnel at the site abide by the rules and regulations of the National Park Service now existing or subsequently promulgated and pertaining to the Cape Hatteras National Seashore. 34. The Permittee agrees to do everything reasonably within its power, both independently and on request of the Superintendent, to preve rit and suppress fires resulting from the Permittee's activities on and adjacent to the site. 3 5. This permit is issued subject to the permittee obtaining all re uired permits from local, state, and federal agencies. Copies of permit must be available at the request of the Superintendent. 36. The State of North Carolina will indemnify, save, and hold harmless and defend the United States against all fines, claims, damages, losses, judgments, and expenses arising out of or from any omission or activity of the Permittee, or its employees to the extent allowable under North Carolina law. This permit may be revoked at any time at the discretion of the Superintendent without compensation to the permittee or liability to the United States.