HomeMy WebLinkAbout52271_NC DOT_20080924❑ CAMA / []DREDGE & FILL _ A a 12
GENERAL PERMIT ,� Previous permit#
❑New ❑Modification ❑Complete Reissue []Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC r
." i ❑ Rules attached.
Applicant Name
Address
City
State ZIP
Phone # O
Fax # O
Authorized Agent
Affected ❑ CW
❑ EW ❑ PTA ❑ ES ❑ PTS
AEC(s): ❑ OEA
❑ HHF ❑ IH ❑ UBA ❑ N/A
❑ PWS:
❑FC:
ORW: yes / no
PNA yes / no Crit.Hab. yes / no
Project Location: County
Street Address/ State Road/ Lot #(s)
Subdivision
City ZIP
Phone # ( ) River Basin
Adj. Wtr. Body (nat /man /unkn)
Closest Maj. Wtr. Body
Type of Project/ Activity
(Scale: )
Pier (dock) length
Platform(s)
Finger pier(s)
Groin length
number
Bulkhead/ Riprap length
avg distance offshore
max distance offshore
Basin, channel
cubic yards
Boat ramp
Boathouse/ Boatlift
Beach Bulldozing
Other
c
r
—
r
—
I
Shoreline Length
SAV: not sure yes no
i i I
Sandbags: not sure yes no —17
Moratorium: n/a yes no
Photos: yes no
Waiver Attached: yes no
A building permit may be required by: ❑ See note on back regarding River Basin rules.
Notes/ Special Conditions
or Applicant Printed Name
"Please read compliance statement on back of permit"
Permit Officer's Signature
Issuing Date Expiration Date
Fee(s)
Check# Local Planning jurisdiction
Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certifythatthis project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office Morehead City Headquarters
Mailing Address: 400 Commerce Ave
1638 Mail Service Center Morehead City, NC 28557
Raleigh, NC 27699-1638 252-808-2808/ 1-888-4RCOAST
Location: Fax: 252-247-3330
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax: 9 19-733-1495
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax:910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 08/09/06
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY LYNDO TIPPETT
GOVERNOR SECRETARY
July 29, 2008
Jim Hoadley
Division of Coastal Management
1367 U.S. 17 South
Elizabeth City, N.C. 27909
Subject: Request for a general permit .2000 for the installation of a wave attenuator
at the old ferry dock ramp facility in Oregon Inlet Marina.
The North Carolina Department of Transportation is requesting a GP .2000 for the
placement of a temporary wave attenuator. This will provide protection from waves that
often occur during strong south winds. This temporary floating structure totals 40 feet in
length by 8 feet wide and is comprised of 10 ft. floating concrete sections. This will be
held in place by attaching it to two existing dolphin clusters as showri in the provided
illustration. There will be no new pilings placed for the attachment. Once the repair work
is finished on the Bonner Bridge the wave attenuator will be removed. NCDOT has
requested a modification to the NPS Special Use permit for the installation of this device.
A copy of the authorization from the NPS is included with this letter along with an
illustration, MP-1 and MP-5 forms, and location map. If you have any questions or need
additional information, please call Clay Willis at 252-482-7977.
Sincerely,
Jerry Jennings,
Division Enp-in
Clay Willis '�'��
Environmental upervisor
113 Airport Dr., Suite M, Edenton, NC 27932 — Phone: (252) 482-7977 Fax: (252) 482-8722
13
I
DEC
(n
;G
v�
\j
� t
'I Al „
Project Location
-,tfw-a { e: Oregon Inlet Fishing Center
-75.5488857
35.796639
vPcf a
- Hacring $Hc�l r�
14and 1.
+
�.. 9.t at, rim, I .
j r
A
4 �
J' swtr. > -It
V
'' a •(, ?k11 nw
0 1 2 4 Miles
arriicanox for
Major Development Perm
(last revised 12127/06)
1. Primary Applicant Landowner Information
Business Name
Ncdot
Project Name (if applicable)
Wave Attenuator
Applicant 1: First Name
Clay
MI
Last Name
Willis
Applicant 2: First Name
MI
Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
113 Airport Drive Suite 100
PO Box
1 1
City
Edenton
State
N.C.
ZIP
27932
Country
us
Phone No.
252 - 482 - 7977 ext. 221
FAX No.
252 - 482 - 8722
Street Address (if different from above)
City
State
ZIP
FtcEail
willis@ncdot.gov
2. AgentContractor Information
Business Name
Agent/ Contractor 1: First Name
MI
Last Name
Agent/ Contractor 2: First Name
MI
Last Name
Mailing Address
PO Box
City
State
ZIP
Phone No. 1
-
- ext.
Phone
No. 2
- ext.
FAX No.
Contractor #
Street Address (if different from above)
City
State
ZIP
Email
<Form continues on back>
2 s2-808-2808 — 1-888-4R OAST -, � WIN.31cc0�4st r anasger-lent. net
Form DCM MP-1 (Page 2 of 5)
APPLICATION for
Major Development Permit
3. Project Location
County (can be multiple)
Street Address
State Rd. #
Dare
Outer Banks Fishing Center
Subdivision Name
City
State
Zip
NC
-
Phone No.
Lot No.(s) (if many, attach additional page with list)
- - ext.
a. In which NC river basin is the project located?
b. Name of body of water nearest to proposed project
Pasquotank
Oregon Inlet
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
❑Natural ®Manmade ❑Unknown
Atlantic Ocean
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city limit the proposed
❑Yes ®No
work falls within.
4. Site Description
a. Total length of shoreline on the tract (ft.)
b. Size of entire tract (sq.ft.)
50 ft
20000 sq. ft.
c. Size of individual lot(s)
d. Approximate elevation of tract above NHW (normal high water) or
NWL (normal water level)
(If many lot sizes, please attach additional page with a list)
5 feet ®NHW or ❑NWL
e. vegetation on tract
maintained lawn area primarily containing bermuda grass
f. Man-made features and uses now on tract
parking lot, boat ramp, docks, ferry terminal and loading ramp, marina
g. Identify and describe the existing land uses ad_ a� cent to the proposed project site.
commercial property for recreational fishing including boat ramps, parking lot, marina. Also adjacent property includes Coast
Guard Service Station
h. How does local government zone the tract?
i. Is the proposed project consistent with the applicable zoning?
n/a
(Attach zoning compliance certificate, if applicable)
❑Yes ❑No ®NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No
k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes []No ®NA
If yes, by whom?
I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ❑No ®NA
National Register listed or eligible property?
<Form continues on next page>
m. (i) Are there wetlands on the site? ®Yes No
(ii) Are there coastal wetlands on the site? ®Yes ❑No
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes ®No
(Attach documentation, if available)
2 5 2 - 8 08-'2 8 0 8 , 1- - A T �rava.nc� + tat a a ers: �a � et
Form DCM MP-1 (Page 3 of 5)
APPLICATION for
Major Development Permit
n. Describe existing wastewater treatment facilities,
Marina has public restrooms
o. Describe existing drinking water supply source.
County water
p. Describe existing storm water management or treatment systems.
stormwater drains from adjacent parking area into grassed lawn areas
5. Activities and Impacts
a. Will the project be for commercial, public, or private use? ❑Commercial Public/Government
❑Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
The wave attenuator is being temporarily placed to provide protection from strong southerly winds for the inspection boat.
The attenuator will only be in place for the time frame the Bonner Bridge Repair is taking place.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
The wave attenuator is a concrete floating dock that will be towed into place through the water. It will be attached to two
existing dolphin clusters by a metal bracket which will be bolted to the dolphin. The bracket will hold the floating dock in place
and also allow it to rise and fall with the tide change.
d. List all development activities you propose.
Placement of a floating dock to act as a wave attenuator.
e. Are the proposed activities maintenance of an existing project, new work, or both? new
f. What is the approximate total disturbed land area resulting from the proposed project? None ❑Sq.Ft or []Acres
g. Will the proposed project encroach on any public easement, public accessway or other area []Yes ®No ❑NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
None
i. Will wastewater or stormwater be discharged into a wetland? ❑Y
s ®No ❑NA
If yes, will this discharged water be of the same salinity as the receiving water? []YES
[]No ❑NA
j. Is there any mitigation proposed? ❑Y
s SNo ❑NA
If yes, attach a mitigation proposal.
<Form continues on back>
6. Additional Information
In addition to this completed application form, (MP-1) the following items below, if applicable, must be si
ibmitted in order for the application
package to be complete. Items (a) — (t) are always applicable to any major development application. P
ease consult the application
instruction booklet on how to property prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please
give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate oM
maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
252- 00-2 .. I- aS-4PC ST ..
Form DCM MP-1 (Page 4 of 5)
APPLICATION for
Major Development Permit
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name Cape Hatteras National Seahshore - National Park Service
Phone No.
Address 1401 National Park Drive, Manteo, N.C. 27954
Name
Phone No.
Address
Name
Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
National Park Service Special Use Permit
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
l further certify that the information provided in this application is truthful to the best of my knowledge.
Date _ 1�Z:%� Print Name -lT ��l�S
Signature r'
Please indicate application attachments pertaining to your proposed project.
❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts
❑DCM MP-3 Upland Development
®DCM MP-4 Structures Information
2 5 2 - 8 0 8 -23t33 1-833-4R A T .. .siccoostai are a --e t.net
Form DCM MP-4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. DOCKING FACILITY/MARINA CHARACTERISTICS ® This section not applicable
a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public?
❑Commercial ❑Public/Government ❑Private/Community ❑Yes ❑No
c. (i) Dock(s) and/or pier(s)
d. (i) Are Finger Piers included? ❑Yes []NO
(ii) Number
If yes:
(iii) Length
(ii) Number
(iv) Width
(iii) Length
(v) Floating ❑Yes ❑No
(iv) Width
(v) Floating ❑Yes ❑No
e. (i) Are Platforms included? ❑Yes ❑No
f. (i) Are Boatlifts included? []Yes ❑No
If yes:
If yes:
(ii) Number
(ii) Number
(iii) La ngth
(iii) Lan gth
(iv) Width
(iv) Width
(v) Floating []Yes ❑No
Note: Roofed areas are calculated from dripline dimensions.
g. (i) Number of slips proposed
h. Check all the types of services to be provided.
❑ Full service, including travel lift and/or rail, repair or
(ii) Number of slips existing
maintenance service
❑ Dockage, fuel, and marine supplies
❑ Dockage ("wet slips") only, number of slips:
❑ Dry storage; number of boats:
❑ Boat ramp(s); number of boat ramps:
❑ Other, please describe:
i. Check the proposed type of siting:
❑ Land cut and access channel
[]Open water; dredging for basin and/or channel
❑Open water; no dredging required
❑Other; please describe:
k. Typical boat length:
m. (i) Will the facility have tie pilings?
❑Yes ❑No
(ii) If yes number of tie pilings?
j. Describe the typical boats to be served (e.g., open runabout,
charter boats, sail boats, mixed types).
I. (i) Will the facility be open to the general public?
❑Yes []No
2. DOCKING FACILITY/MARINA OPERATIONS ® This section not applicable
252-8 8-2808 ;a -1-6;58-4 :-r,0AaT :u vraaav-,#,nccoas1a1 manage ent.net
revjsadf 1212V'106
a. Check each of the following sanitary facilities that will be included in the proposed project.
❑ Office Toilets
❑ Toilets for patrons; Number: ; Location:
❑ Showers
❑ Boatholding tank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater.
c. Describe the disposal of solid waste, fish offal and trash.
d. How will overboard discharge of sewage from boats be controlled?
e. (i) Give the location and number of "No Sewage Discharge" signs proposed.
(ii) Give the location and number of "Pumpout Available" signs proposed.
f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
g. Where will residue from vessel maintenance be disposed of?
h• Give the number of channel markers and "No Wake" signs proposed.
I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality.
j. What will be the marina policy on overnight and live -aboard dockage?
k. Describe design measures that promote boat basin flushing?
I. If this project is an expansion of an existing marina, what types of services are currently provided?
m. Is the marina/docking facility proposed within a primary or secondary nursery area?
❑Yes ❑No
n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
❑Yes ❑No
o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aq
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
j]CW ❑SAV ❑SB
❑WL ❑None
vegeranon t�:)Hv),
252- 08-2808 :: 1-838-4RC43AST ., uvwvv.ncca�as�a7sr����s����r�i.�e�
rye raked; 12/27,�06
T r j DCM Pm ( tTuctures, Page 3 of 4)
p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? []Yes []No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
3. BOATHOUSE (including covered lifts) ® This section not applicable
a. (1) Is the boathouse structure(s):
❑Commercial ❑Public/Government ❑Private/Comm unity
(ii) Number
(iii) Length
(iv) Width
Note: Roofed areas are calculated from dripline dimensions.
4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ® This section not applicable
a. (i) Number
(ii) Length
(iii) Width
5. BREAKWATER (e.g., wood, sheetpile, etc.) ❑ This section not applicable
a. Length 40 feet b. Average distance from NHW, NWL, or wetlands
50 ft.
c. Maximum distance beyond NHW, NWL or wetlands
60 ft.
6. MOORING PILINGS and BUOYS ®This section not applicable
a. Is the structure(s): b• Number
❑Commercial ❑Pub)WGovernment ❑Private/Comm unity
c. Distance to be placed beyond shoreline d. Description of buoy (color,i inscription, size, anchor, etc.)
Note: This should be measured from marsh edge, if present.
e. Arc of the swing
7. GENERAL
a. Proximity of structure(s) to adjacent riparian property lines
Within the NPS property boundaries
b. Proximity of structure(s)
within the old ferry do
public boat ramps at
Note: For buoy or mooring piling, use arc of swing including length
of vessel.
c. Width of water body d. Water depth at
350 feet 6-8 ft.
e. (i) Will navigational aids be required as a result of the project?
❑Yes ®No ❑NA
(ii) If yes, explain what type and how they will be implemented.
adjacent docking facilities.
structure , which is adjacent to the
saon Inlet
I end of structure at NLW or NWL
8. OTHER ❑ This section not applicable
52-808-203 :; 11-8a8-4RC+C AST :: revisal: 92i2710;
Form -CPA PAP-4 PAP-tStructueas, R*ge 4 of 4)
a. Give complete description:
The wave attenuator is 40 feet by 8 feet in length and comprised of a floating concrete material. This will be towed in place and
attached to two existing dolphin clusters as shown in the photograph illustration and drawing. This is will provide protection for
the inspectors boat during strong south winds. Once the Bonner Bridge repair is complete this wave attenuator will be
removed. There will be no new piles or shoreline work associated with this temporary structure.
VIM .
Date
Project Name
Annlirant dame
Applicant Signature
s
U
�PAI
2 r'2-80 -2808 ;: 'I-838-t$ x. OAST :; aru�ror�_rac�cs��ta�u�a������er�t.rs�� revised., 12127/06
70
This section
will he towed
to the Cherry
Breach Ferry
a
I
Yn
m
k r�.
�•
sty `L')S-
� C F ✓� '�'
� '� �
�
qJ
�. F
82 ft wide by 10.0 ft long sections joined
together by double 4"x12" timber bands.
f � tf
a1,01 —i ��
+ 1 1 1 1 r I 1
.}..,_ - �-- <- "f-- ! f- Y _:- �. �•^ �^- ���1-!=! Sti1�0�� ice_ I ( I--+ I _ 1 T y -
I r - ! _I�—' I 16i { ►.i 1-1 1 �'�i-�
_ + � , f f ,� %��%-�-Nr�1/7 � ,o �l�Yi>'1>�•!C-)fL `y y_ '_ _ —i ., _,� ( _ '
-44
6-7
tt
�- � - - -- i - +- I' _. •��-�-��t�'1 �n �..� '�'J � - A ! - ff I -- ---r-- � b _ ' _ ' t 7
T } ) 1 1
1 � I
' I
' - -•. .- - N k t _ I - i _�_ t i - � _ 1 _j .� �- f-- - � --•- fir- , - � -•- • -
G Zd 1-7 R --7
----
t I
I
I
. < � - �— •��i� --•- f r - -i - ...-_.— - � J , Eft S-it •.-�L-v � -
• - - - - ' '*-• - Egli �►1 Gt __ - ;-- ,
i
�- j ----- � — --- t r � _ _� -C � 9 ' a,na•-�F�L f Eye• - —,
r-
r ,
' t
+ I
67
C p��tL�1 C Z70G
Form 10-114 U.S. DEPARTMENT OF THE INTERIOR
Rev. DEC. 99 National Park Service
Special Use Permit
Name Govt and Utilities - Staging Permit Review Date:
of Use, of Equipment Permit Expires:
Long Term ❑
Short Term F,1�
Page 1 of 2
Dee. 31, 2009
Permit No.: GOV07 CAHA - 5700 461
Name of Area: Cape Hatteras National Seashore
Clay Willis & North Carolina Department of of
Transportation
Name of Permittee
Edenton, NC (252) 482-7977
Address Phone
is hereby authorized during the period of 8:00:00 AM on 09 24, 2008 and expiring at Dec. 31, 2009, to use
the following described land or facilities in the above named area:
on and below the Bonner Bridge as situated in Oregon Inlet, Cape Hatteras National
Seashore
For the purpose(s) of: amending permit GOV07-CAHA-5700-461 to allow the installation of a
waterline, electrical power takeoff and a wave attenuator as
represented and documented by the Permittee to the Park. All other
terms and conditions of the permit remain the same.
Authorizing legislation or other authority (RE-DO-53): 36 CFR: Chapter 1, Part 2.50.
NEPA Compliance: [*-/] Categorically Excluded ❑ EA/FONSI ❑ EIS ❑ Other Approved Plans
Performance Bond: ❑ Required V Not Required Amount $0.00
Liability Insurance: ❑ Required W Not Required Amount $0.00
ISSUANCE of this permit is subject to the conditions on the reverse hereof and appended pages and when
appropriate to the payment to the U.S. Department of the Interior, National Park Service, of the sum of
$0.00.
The undersigned hereby accepts this permit subject to the terms, covenants, obligations, anc
reservations, expressed or implied herein.
PERMITTEE
Signature
Authorizing Official, Darrell L. Echols
Signature Deputy Superintendent
Additional Authorizing Official
(If Required) Signature
PERMITTEE
Title
D e
9/24/2008
Date
Date
ADDENDUM
Cape Hatteras National Seashore
Special Use Permit #GOV07-CAHA-5700-461
1. The permittee shall exercise this privilege subject to the supervision of the
Superintendent, and shall comply with all applicable laws and regulations of the area.
2. Damages - The permittee shall pay the United States for any damage resulting from
this use which would not reasonably be inherent in the use which the permittee is
authorized to make of the land described in this permit.
3. Benefit - Neither Members of, nor Delegates to Congress, or Resident Commissioners
shall be admitted to any share or part of this permit or derive, either directly or
indirectly, any pecuniary benefits to arise therefrom: Provided, however, that nothing
herein contained shall be construed to extend to any incorporated company, if the
permit be for the benefit of such corporation.
4. Assignment - This permit may not be transferred or assigned without the consent of
the Superintendent, in writing.
5. Revocation - This permit may be terminated upon breach of any of the conditions
herein or at the discretion of the Superintendent.
6. The permittee is prohibited from giving false information; to do so will be considered
a breach of conditions and be grounds for revocation [Re: 36 CFR 2.32(a) (4)].
7. Permittee will comply with applicable public health and sanitation standards and
codes.
8. The permittee and all participants authorized herein must comply with all conditions
of this permit including all exhibits, amendments and/or written directions of the Park
Superintendent.
9. The permittee and all participants authorized herein must co ply with all conditions
of this permit including all exhibits, amendments and/or wri en directions of the Park
Superintendent.
10. This permit is applicable only for the use of the area(s) indic ted under the terms
detailed on Special Use Permit (Form 10-114) and the additi nal provisions listed
below.
11. Special Park Uses Coordinator is the Service's representativ regarding permit
preparation and can be reached at (252) 473-2111, ext. 121. North District Ranger at
(252) 441-7425 or his designee will serve as the Service's r resentative during the
Project. The permittee must immediately notify the District Ranger in the event of
any accidents or emergencies.
12. This permit authorizes the rebuilding/replacement of sectio s of the bridge structure
all in accordance with the documents and maps filed with t e National Park Service in
support of the Application for this Permit, also referred to a the "Plans for the
Project".
13. This permit does not authorize exclusive use of any public ands. The permittee shall
insure to the fullest practicable extent that the rights of the eneral public visiting
Cape Hatteras National Seashore will not be infringed upo by this activity.
14. The authorized activities shall be suspended immediately s ould any unidentified
archeological or other cultural resources be encountered wi in the permitted area.
The Service's Resource Chief Thayer Broili, 473-2111, ext, 137 or Historian/Cultural
Resources Manager Doug Stover, 473-2111, ext. 153 must be notified immediately.
15. The permittee will exercise particular care to avoid disturbing or destroying wildlife
and vegetation. Night work will be suspended when Park Staff determine such
activity could adversely impact wildlife nesting and breeding activities in the Park.
Night work may be resumed when Park Staff determine no impact to wildlife is
likely.
16. Permittee will use best efforts to minimize its vehicle and equipment interference
with routine visitor traffic or use of park resources. Equipment utilized during the
Project shall be strategically placed and operated as to avoid damage to ocean side
dunes and/or marsh habitat.
17. The Permittee shall be responsible for providing traffic control at the sight and during
the period from Memorial day to Labor Day will minimize week -end work at the sight
so as to provide maximum traffic flow.
18. No staging of materials is permitted on Park property other than sites approved by the
District Ranger.
19. The permittee must properly dispose of all refuse generated by the permitted activity.
Clean up to the satisfaction of the Service is the responsibility of the permittee. The
permittee shall be liable for any damages to any government property resulting from
these activities. .
20. The Superintendent shall be notified in writing no less than fifteen (15) days prior to
the start of initial construction on Park lands. The Permittee construc-
tion/maintenance supervisor will contact the District Ranger on the morning of the
first and last day of work, advising the location and extent of work crews and
equipment in the Park.
21. No permanent buildings will be constructed at the staging areas and no workers or
visitors will be housed or allowed to camp at the site; however, temporary trailer will
be permitted if necessary for personnel and equipment and to accommodate night-
watchmen for the contractor.
22. The Permittee and any of its Contractors or Sub -contractors shall comply with all
State of North Carolina, Department of Environmental Quality and National Park
Service rules and regulations during construction including, but not limited to, the
handling and storage of fuel, oil and other liquids.
23. All construction vehicles will be pressure cleaned with water prior to arriving at and
departing from the construction site to minimize the potential for introducing exotic
plant species. North Carolina Highway 12 will be keep clean and free from debris.
24. Contractors/subcontractors will be informed about the special sensitivity of park
values, regulations, and appropriate grounds maintenance during construction periods.
25. Safety fences and signs will exclude park visitors from construction and access areas.
The Permittee will maintain fences and signs in good repair during project activities
and promptly remove them following completion of construction.
26. To the extent that work undertaken under this permit is performed by other than the
Permittee's employees, it shall require such person or corporation to:
• Procure public and employee liability insurance from a responsible company or
companies with a minimum limitation of One Million Dollars ($1,000,000) per
person for any one claim, and an aggregated limitation of One Million Dollars
($1,000,000) for any number of claims arising from any one incident. The
policies shall name the United States as an additional insured, shall specify that
the insured shall have no right of subrogation against the United States for
payments of any premiums or deductibles due thereunder, and shall specify that
the insurance shall be assumed by, be for the account of, and be at the insured's
sole risk. Prior to beginning the project authorized herein, COE shall provide the
NPS written confirmation of such insurance coverage.
Pay the United States the full value for all damages to the lands or other property of
the United States caused by the said person or organization, its representatives, or
employees.
Indemnify, save and hold harmless, and defend the United States against all fines,
claims, damages, losses, judgments, and expenses arising out of, or from, any
omission or activity of the said person or organization, its representatives, or
employees.
32. Mining the removal of natural substances such as sand and gravel is prohibited.
33. The permittee shall abide by and insure that all personnel at the site abide by the rules
and regulations of the National Park Service now existing or subsequently promulgated
and pertaining to the Cape Hatteras National Seashore.
34. The Permittee agrees to do everything reasonably within its power, both
independently and on request of the Superintendent, to preve rit and suppress fires
resulting from the Permittee's activities on and adjacent to the site.
3 5. This permit is issued subject to the permittee obtaining all re uired permits from
local, state, and federal agencies. Copies of permit must be available at the request of
the Superintendent.
36. The State of North Carolina will indemnify, save, and hold harmless and defend the
United States against all fines, claims, damages, losses, judgments, and expenses arising
out of or from any omission or activity of the Permittee, or its employees to the extent
allowable under North Carolina law.
This permit may be revoked at any time at the discretion of the Superintendent without
compensation to the permittee or liability to the United States.