HomeMy WebLinkAbout53213_NC DOT_200902274 ❑CAl,1IIA / ElDREDGE & FILL
GENERAL PERMIT
❑New ❑Modification ❑Complete Reissue ❑Partial Reissue
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
Previous permit #
Date previous permit issued,
A plicant Name Project Location: County
p
Address
.
City
State_ j` ZIP
Phone # ( )
Fax # (_ )
Authorized Agent
❑ CW
❑ EW ❑ PTA ❑ ES ❑ PTS
Affected
❑OEA
❑HHF ❑IH ❑UBA ❑N/A
AEC(s):
❑ PWS:
❑FC:
ORW: yes / no
PNA yes / no Crit.Hab. yes / no
Street Address/ State Road/ Lot #(s)
D Rules
Subdivision
City -__ ZIP
Phone # ( ) River Basin
Adj. Wtr. Body (nat /man /unknl
Closest Maj. Wtr. Body
Type of Project/ Activity
(Scale: )
Pier (dock) length
Platfo
Finger pier(s)
Groin
Boat
Othe
SAV:
Mor
Phot
Waiver Attached. yes
no
A building permit may be required
by:
See note on back regarding River Basin rules.
Notes/ Special Conditions
oc en
rms
I
length
i I
number
Agent or Applicant Printed
Signature ** Please read compliance statement on back of permit
Application Fee(s) Check #
Permit Officer's Signature
' Issuing Date Exp' tion Date
Local PlanningJurisdidion Rover File Name
f 1 j
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistentwith the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office Morehead City Headquarters
Mailing Address: 400 Commerce Ave
1638 Mail Service Center Morehead City, NC 28557
Raleigh, NC 27699-1638 252-808-2808/ 1-888ARCOAST
Location: Fax: 252-247-3330
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax:919-733-1495
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax:910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 08/09/06
US HIGHWA Y 264
DARE COUNTY
PIPE REPLA CEMENT
PROPOSED RIP RAP
WOODS AT END OF PIPE
FIYISHED EARTH SLOPE AS REQUDZED
PROPOSED RIP RAP FOR SHOULDER STABLMMON
1 a
w�
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
COUNTY* DARE COUNTY
QUAD: LONG SHOAL POINT
BASIN : TAR PAAIUCO
PROJECT : PIPE REPLACEMENT
DATE j ��3�� SCALE P'= --
30' JI
DETAIL SECTION CROSS SECTION
US HIGHWAY 264
PROPOSED RIP RAP
PROPOSED RIP RAP EXISTING GUARD RAIL j AT END OF PIPE
AT END OF PIPE CL ROAD ELEV. 100.81 i
WATER ELEV. 97.0 - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - � - - -
IXISTING BTREM BED
-
MSTl8.B
EXISTING PIPE 1(936"X50'CMP PROPOSED1C 4W X50' CAA
NOTE: CLASS B STONE TO BE PLACED AROUND END OF PIPES
NOTE: BOTTOM OF NEW PIPE TO BE PLACED
8" TO 1' BELOW SILT LINE
US HIGHWAY 264 - _ CL ROAD ELEV.-
EXISTING PIPE
O PROPOSED PIPE
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
SHOULDER ELEV98.7 TOP OF BANK _ C �+ COUNTY
E PROPOSED RIP RAP COUNTY l�Li DACOUl]�r+ i
WATER ELEV. 97 0 _ _ \ AT END OF PIPE
E (V�96 9 REM BED QUAD o LONG SHOAL POINT
EXISTING PIPE 103FX50'CMP TO BE REMOVED BASIN TAR PAMLICO
PROPOSEDI Q 48" X50' CAA EXISTING PIPE INVERT ELEV. 96.0
PROJECT.PIPE REPLACEME111'T
SCALE. F' = 10'
DETAIL SECTION END VIEW DATE �a/3��� 7