Loading...
HomeMy WebLinkAbout53213_NC DOT_200902274 ❑CAl,1IIA / ElDREDGE & FILL GENERAL PERMIT ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC Previous permit # Date previous permit issued, A plicant Name Project Location: County p Address . City State_ j` ZIP Phone # ( ) Fax # (_ ) Authorized Agent ❑ CW ❑ EW ❑ PTA ❑ ES ❑ PTS Affected ❑OEA ❑HHF ❑IH ❑UBA ❑N/A AEC(s): ❑ PWS: ❑FC: ORW: yes / no PNA yes / no Crit.Hab. yes / no Street Address/ State Road/ Lot #(s) D Rules Subdivision City -__ ZIP Phone # ( ) River Basin Adj. Wtr. Body (nat /man /unknl Closest Maj. Wtr. Body Type of Project/ Activity (Scale: ) Pier (dock) length Platfo Finger pier(s) Groin Boat Othe SAV: Mor Phot Waiver Attached. yes no A building permit may be required by: See note on back regarding River Basin rules. Notes/ Special Conditions oc en rms I length i I number Agent or Applicant Printed Signature ** Please read compliance statement on back of permit Application Fee(s) Check # Permit Officer's Signature ' Issuing Date Exp' tion Date Local PlanningJurisdidion Rover File Name f 1 j Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistentwith the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Morehead City Headquarters Mailing Address: 400 Commerce Ave 1638 Mail Service Center Morehead City, NC 28557 Raleigh, NC 27699-1638 252-808-2808/ 1-888ARCOAST Location: Fax: 252-247-3330 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax: 252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax:910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 US HIGHWA Y 264 DARE COUNTY PIPE REPLA CEMENT PROPOSED RIP RAP WOODS AT END OF PIPE FIYISHED EARTH SLOPE AS REQUDZED PROPOSED RIP RAP FOR SHOULDER STABLMMON 1 a w� NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS COUNTY* DARE COUNTY QUAD: LONG SHOAL POINT BASIN : TAR PAAIUCO PROJECT : PIPE REPLACEMENT DATE j ��3�� SCALE P'= -- 30' JI DETAIL SECTION CROSS SECTION US HIGHWAY 264 PROPOSED RIP RAP PROPOSED RIP RAP EXISTING GUARD RAIL j AT END OF PIPE AT END OF PIPE CL ROAD ELEV. 100.81 i WATER ELEV. 97.0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - � - - - IXISTING BTREM BED - MSTl8.B EXISTING PIPE 1(936"X50'CMP PROPOSED1C 4W X50' CAA NOTE: CLASS B STONE TO BE PLACED AROUND END OF PIPES NOTE: BOTTOM OF NEW PIPE TO BE PLACED 8" TO 1' BELOW SILT LINE US HIGHWAY 264 - _ CL ROAD ELEV.- EXISTING PIPE O PROPOSED PIPE NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS SHOULDER ELEV98.7 TOP OF BANK _ C �+ COUNTY E PROPOSED RIP RAP COUNTY l�Li DACOUl]�r+ i WATER ELEV. 97 0 _ _ \ AT END OF PIPE E (V�96 9 REM BED QUAD o LONG SHOAL POINT EXISTING PIPE 103FX50'CMP TO BE REMOVED BASIN TAR PAMLICO PROPOSEDI Q 48" X50' CAA EXISTING PIPE INVERT ELEV. 96.0 PROJECT.PIPE REPLACEME111'T SCALE. F' = 10' DETAIL SECTION END VIEW DATE �a/3��� 7