Loading...
HomeMy WebLinkAbout54622_NC DOT_20090915O CAMA / G'UREDDSJ#& FI GEN€SAL PERMIT Previous permit # - L INew ❑Modification -Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North C0114wa, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC ❑ Rules attached. Applicant Name----- _ Project Location: County Address _- Street Address/ State Road/ Lot #(s) --/' City - - - State_ _ ZIP Phone # ( ) : Authorized Agent _ Ell CW EAW El PTA IJS ElPTS Affected AEC(s): ElOEA ElHHF ❑ IH [IUBA ElN/A CI PWS: ❑FC: ORW: yes / no PNA yes / no Crit.Hab. yes / no IType of Project/ Activity Fax # ( ) Subdivision City --�_�:•� L e Ve ' ZIP Phone # ( ) River Basin Adj. Wtr. Body E i ' IV c U, L' / (nat %man,,/unkn) Closest Maj. Wtr. Body (Scale: // ) Platform(s) Finger pier(s) Groin length number Bulkhead/ Riprap length - avg distance offshore max distance offshore - Basin, channel — `— cubic yards Boat ramp Boathouse/ Boatlift I Beach Bulldozing Other I Shoreline Length SAV: not sure yes no Sandbags: not sure yes no Moratorium; n/a yes no Photos: yes no Waiver Attached: yes no - — t - _ V -if V -- I " - _- t' L A building permit may be required by: Notes/ Special Conditions Agent or Applicant Printed Name ❑ See note on back regarding River Basin rules. Permit Officer's Signature Signature ** Please read compliance statement on back of permit Issuing Date Expiration Date Application Fee(s) Check # Local Planningf urisdiction Rover File Name i ,Ida Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on howto complywith these buffer rules. Division of Coastal Management Offices Raleigh Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888ARCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax:910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 L1 CAMA / C76REE GE & FILL I � f;' 5 4 B 2 `3 GENERAL PERMIT Previous permit# y blew -:Modification ❑Complete Reissue El Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC % l j7 n � �J ules attached. Applicant Name !" �� Project Location: Countyf'�z' Address X S�7 JX' 13 -YTI Street Address/ State Road/ Lot #(s) � City &1-4cn.rrll State IVCZ1P�- 0,-37,,,,rIrr• wej-r ;'_rA/3'73 Phone # (� SP30-3`t'OFax # (_) T47 J1,Af' Authorized Agent R16W R€W SifTA Tr S ❑ PTS Affected AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A ❑ PWS: ❑ FC: ORW: yes /(no) PNA yes / ,& Crit.Hab. yes / no Subdivision city --�.�A L..eye I , /�l ZIP If Phone # () River Basin Adj. Wtr. Body UT4� '� (nat m—ani/unkn) Closest Maj. Wtr. Body' Type of Project/ Activity � y� � r c''= t -i-�j , 3 0" X `{ O ' f"vX C.Y j,,'l-x, (Scale: NIA ) Pier (dock) length Platform(s) Finger Basin Boat Boat Othe Shor SAV: Sand Mor Waiveryes O 1 A building permit may be required by: El r �y / ❑/See note on back regarding River Basin rules. Notes/ Special Conditions r.'Lr b1Jt- Ui/ l.z%;tl -s'{t� �j j,� "t141 Z�C J;AA!'! v`�) l � )A Lf` W. -41 © C:ajj✓u'� J'n��"rf f► ��/ ft'%' Z+I %Jf 1oi✓ fo ,r zf'fr r�.t%�.t CC e .^.Ca>7 c�? ✓/fi' 1V( S': Groin Bulklength— Beac Ll Photos: pier(s) n length I � �- -�� Agent or Applicant Printed Name Signature ** Please read compliance statement on back of permit ,44Lf00.o0 WB-r�+` �C, 01601 Application Fee(s) Check # PermitOfficer s Signature Issuing Date Expiration Date Local Planningf urisdiction Rover File Name NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue Goierrnor James H. Gregson, Director Dee Freeman, Secretary September 15, 2009 Jay Johnson, NC DOT Division of Environmental Officer Division 3 PO Box 1587 Greenville, NC 27835 Dear Mr. Johnson: Attached is General Permit 954622 C to construct two 30"x40' culverts to replace two 18"00' culverts at SR 1385, 0.37 miles west of SR 1373 in Sea Level, NC. In order to validate this permit, please sign the permit as indicated. Retain the white copy for your files and return the signed yellow and pink copies to us in the enclosed, self-addressed envelope. If the signed permit copies are not returned to this office before the initiation of development, you will. be working without authorization and will be subject to a Notice of Violation and subsequent civil penalties. We appreciate your early attention to this matter. Sincerely, Stephen Lane Coastal Management Representative Isb Enclosures 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX: 252-247-33301Internet: www.nccoastalmanagement, net An Equal Opportunity 1 Affirmative Action Employer— 50% Recycled 110% Post Consumer Paper ICE NP4 APPLICATION for p 1 Z009 Major Development Perm! 6rehead GRY DOWi past revised 1 s/z7ros1, North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name North Carolina Department Of Transportation Project Name (if applicable) SR 1385, Shell Hill Road Carteret County Applicant 1: First Name Jay MI B. Last Name Johnson Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box 1587 City Greenville State NC ZIP 278351587 Country us Phone No. 252 - 830 - 3490 ext. 248 FAX No. 252 - 830 - 3341 Street Address (rf different from above) City State ZIP Email jbjohnson@ncdot.gov 2. Agent/Contractor Information Business Name Agent/ Contractor 1: First Name MI Last Name Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State ZIP Phone No. 1 - - ext. Phone No. 2 - - ext. FAX No. Contractor # Street Address (if different from above) City State ZIP Email <Form continues on back> Form DCM MP=1 (Page 2 of 5) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Carteret SR 1385, Shell Hill Road Subdivision Name City State Zip Phone No. Lot No.(s) (if many, attach additional page with list) - - ext. , , , , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak Nelson Bay c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. NNatural []Manmade ❑Unknown Core Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ❑No work falls within. Sea Level 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 32' (16' North and 16' South) N/A c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) (if many lot sizes, please attach additional page with a list) 1.4' ❑NHW or NNWL e. Vegetation on tract Maintained Roadside Grasses f. Man-made features and uses now on tract Road g. Identify and describe the existing land uses adiacent to the proposed project site. Residential Property h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? N/A (Attach zoning compliance certificate, if applicable) ❑Yes ❑No NNA j. Is the proposed activity part of an urban waterfront redevelopment proposal? Yes NNo k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes []No NNA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes NNo ❑NA National Register listed or eligible property? <Fonn continues on next page> m. (i) Are there wetlands on the site? ®Yes ❑No (ii) Are then: coastal wetlands on the site? ®Yes [:]No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ®Yes ❑No (Attach documentation, if available) Form DCM MP'1 (Page 3 of 5) APPLICATION for Major Development Permit n. Describe existing wastewater treatment facilities. N/A o. Describe existing drinking water supply source. N/A p. Describe existing storm water management or treatment systems. N/A 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ®Public/Government ❑Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The Existing 2@18" x 30' CMP Will Be Replaced By Proposed 2@ 30"x 40' CMP. The Proposed Pipe Will Keep The Roadway From Collapsing, Thus Preventing Possible Injury and Death. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. The Existing Pipe Will Be Removed and the Proposed Pipe Will Be Installed. Typical Roadway Construction Equipment Will Be Used, Including,But Not Limited To Tracked Excavators,Dump Trucks, Flat -Bed Trucks, Back- Hoes,And Boom Trucks. d. List all development activities you propose. Pipe Replacement and Asphalt Patching e. Are the proposed activities maintenance of an existing project, new work, or both? Both f. What is the approximate total disturbed land area resulting from the proposed project? 768 ®Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ❑No ®NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. N/A i. Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA j. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. <Form continues on back> 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (f) are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Form DCM MP-1 (Page 4 of 5) APPLICATION for Major Development Permit d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name David and Marschi Valentovich Phone No. Address 207 Acorn Drive Middletown, DE 19709 Name Thomas H. Gaskill,Heirs Phone No. Address 1807 Evans Street Morehead city, NC 28557 Name Gina Christine Hall Phone No. 247 Shell Hill Road Sea Level, NC 28577 Address Eleanor M. Gasldll 257 Shell Hill Road Sea Level, NC 28577 g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. None h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary_ j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7, Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and folkwv-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date August 12, 2009 Print Fume _Jay B. Johpson Signature Please indicate application attachments pertaining to your prop project. ®DCM MP-2 Excavation and Fill Information ®DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development ❑DCM MP-4 Structures Information Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization Length Width Avg. Existing Depth NA NA Final Project Depth NA NA 1. EXCAVATION ®This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. c. (i) Does the area to be excavated include coastal wetlandstmarsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of the excavation in these areas: d. High -ground excavation in cubic yards. 2. DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable a. Location of disposal area. b. Dimensions of disposal area. c. (i) Do you claim title to disposal area? ❑Yes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner. d. (i) Will a disposal area be available for future maintenance? ❑Yes []No ❑NA (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh f. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of disposal in these areas: (i) Does the disposal include any area in the water? ❑Yes ❑No ❑NA (ii) If yes, how much water area is affected? 3. SHORELINE STABILIZATION [I This section not applicable (If development is a wood groin, use MP-4 — Strictures) rerm ON MP-5 BRIDGES eRtlCULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. BRIDGES ®This section not applicable a. Is the proposed bridge: ❑Commercial ❑Public/Government ❑Private/Community C. Type of bridge (construction material): e. (i) Will proposed bridge replace an existing bridge? ❑Yes ❑No If yes, (ii) Length of existing bridge: (iii) Width of existing bridge: (iv) Navigation clearance underneath existing bridge: (v) Will all, or a part of, the existing bridge be removed? (Explain) g Length of proposed bridge: b. Water body to be crossed by bridge: d. Water depth at the proposed crossing at NLW or NWL: f. (i) Will proposed bridge replace an existing culvert? ❑Yes [-]No If yes, (ii) Length of existing culvert: (iii) Width of existing culvert: (iv) Height of the top of the existing culvert above the NHW or NWL: (v) Will all, or a part of, the existing culvert be removed? (Explain) h Width of proposed bridge: i. Will the proposed bridge affect existing water flow? ❑Yes ❑No j. Will the proposed bridge affect navigation by reducing or If yes, explain: increasing the existing navigable opening? ❑Yes ❑No If yes, explain: k. Navigation clearance underneath proposed bridge: I. Have you contacted the U.S. Coast Guard concerning their approval? ❑Yes ❑No If yes, explain: m. Will the proposed bridge cross wetlands containing no navigable n. Height of proposed bridge above wetlands: waters? ❑Yes [-]No If yes, explain: 2. CULVERTS [I This section not applicable a. Number of culverts proposed: 2 b. Water body in which the culvert is to be placed: UT to Nelson Bay < Form continues on back> "ACM MP-5 (Bridges and Culverts, Page 2 of 4) C. Type of culvert (construction material): CMP d. (i) Will proposed culvert replace an existing bridge? ❑Yes ®No If yes, (ii) Length of existing bridge: (iii) Width of existing bridge: (iv) Navigation clearance underneath existing bridge: _ (v) Will all, or a part of, the existing bridge be removed? (Explain) f. Length of proposed culvert: 40' h. Height of the top of the proposed culvert above the NHW or NWL. 0.3 j. Will the proposed culvert affect navigation by reducing or increasing the existing navigable opening? [-]Yes ®No If yes, explain: e. (i) Will proposed culvert replace an existing culvert? ®Yes ❑No If yes, (ii) Length of existing culvert(s): 30' (iii) Width of existing culvert(s): 18" (iv) Height of the top of the existing culvert above the NHW or NWL: 0.3' (v) Will all, or a part of, the existing culvert be removed? (Explain) All of the Existing Culverts Will be Replaced g Width of proposed culvert: 36" i. Depth of culvert to be buried below existing bottom contour. 1' k. Will the proposed culvert affect existing water flow? If yes, explain: ❑Yes ®No 3. EXCAVATION and FILL El This section not applicable a. (i) Will the placement of the proposed bridge or culvert require any excavation below the NHW or NWL? ®Yes ❑No If yes, (ii) Avg. length of area to be excavated: North 24' South 24' (iii) Avg. width of area to be excavated: 11' North 11' South (iv) Avg. depth of area to be excavated: 1_2' (v) Amount of material to be excavated in cubic yards: 24 Cubic Yards C. (i) Will the placement of the proposed bridge or culvert require any high -ground excavation? ®Yes ❑No If yes, (ii) Avg. length of area to be excavated: 30' (iii) Avg. width of area to be excavated: 9' (iv) Avg. depth of area to be excavated: 1_6' (v) Amount of material to be excavated in cubic yards: 16 Cubic Yards b. (i) Will the placement of the proposed bridge or culvert require any excavation within coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. OCW 44 Sg.Ft. ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of the excavation in these areas: Pipe Bedding Form DCM MP-5 (Bridges and Culverts, Page 3 of 4) d. If the placement of the bridge or culvert involves any excavation, please complete the following: (i) Location of the spoil disposal area: Temporary Spoil Area is in the Existing Road (ii) Dimensions of the spoil disposal area: 100' x 200' (iii) Do you claim title to the disposal area? ®Yes ❑No (If no, attach a letter granting permission from the owner.) (iv) Will the disposal area be available for future maintenance? ®Yes ❑No (v) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAVs), other wetlands (WL), or shell bottom (SB)? ❑CW ❑SAV OWL ❑SB ®None If any boxes are checked, give dimensions if different from (ii) above. (vi) Does the disposal area include any area below the NHW or NWL? ? ❑Yes ®No If yes, give dimensions if different from (ii) above. e. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed below NHW or NWL? ®Yes [-]No If yes, (ii) Avg. length of area to be filled: North 4' South 4' (iii) Avg. width of area to be filled: 16' (iv) Purpose of fill: Pipe Bedding f. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed within coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of the excavation in these areas: g. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed on high -ground? ❑Yes ®No If yes, (ii) Avg. length of area to be filled: (iii) Avg. width of area to be filled: (iv) Purpose of fill: a. Will the proposed project require the relocation of any existing b. Will the proposed project require the construction of any temporary utility lines? ❑Yes ®No detour structures? ❑Yes ®No If yes, explain: If yes, explain: If this portion of the proposed project has already received approval from local authorities, please attach a copy of the approval or certification. < Form continues on back> c. Will the proposed project require any work channels? d. How will excavated or fill material be kept on site and erosion ❑Yes ®No controlled? If yes, complete Form DCM MP-2. Turbidity Curtains and Silt Fences will be used to retain sediment on -site e. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? Typical Bridge Construction Equipment g. Will the placement of the proposed bridge or culvert require any shoreline stabilization? ®Yes ❑No If yes, complete form MP-2, Section 3 for Shoreline Stabilization only. August 12,2009 Date SR 1385, Shell Hill Road, Pipe Replacement, Carteret County WBS Element Number 2C.016014 Project Name Jay B. Johnson Applicant Nance 1 Applicant Sigh re Will wetlands be crossed in transporting equipment to project site? ❑Yes ®No If yes, explain steps that will be taken to avoid or minimize environmental impacts. Pipe Replacementg SR 13859 S ell` 'lftAna, +dart PROJECT Y= 417822.5608 X= 2781754.8669 N34"-52' 11 " W 76n-23' 36" N 34 86983 7 DEGREES W 76.393357 DEGREES Creek Rd Dr; f 0 700 1,400 2,800 4,200 5,600 3 Feet . ............... PROTECT Y-- 417822e5608 X 2781754.86651 W 76 ^-23'-36 ►r h i o j 1 q X �+' Mr M 1 'S • _ f� 1 IYYL'o1 } -- 0 700 1,400 2,800 4,200 5,600 Feet 3 . _ PIP E REPLACEMENT NOT FOR�CONSTRUCTJOiV SR 'I 385o SHELL HILL 'RD CARTERET COUN-/7) y AREA 4 32 Sq.Ft COASTAL6499 ELEANOR M. GASKILL 8602 AREA 3 WETLAND IMPACTS 257 SHELL HILL RD GINA CHRISTINE HALL 40 Sq. Ff. SEA LEVEL, NC 28577 247 SHELL HILL RD 32 sq.Ff COASTAL OPEN WATER IMPACTS DBK894, P G. 796 SEA LEVEL, NC 28577 WETLAND IMPACTS DBK 869, P.G. 207 40 Sq. Ft. TOTAL l28 Sa Ft COASTAL WETLAND IMPACTS OPEN WATER IMPACTS TOTAL:160 Sq. Ft.OPEN WATER IMPACTS ` EXISTING 2cl8lx 3YRcP ':. Ia5' 1.5` v xax iu —� NOT TO SCALE... PROPOSED 2o3Oa x 40' CMP ROAD' SR 134Z . ...:.. . 1,6 .'�' ► w . 5 - - PROPOSED 2030' x 401 OMP rt,sexp+tw e�mcac \ io 2 � EDGE OF PAVEMENT EDGE OF PAVEMENT r (� EXISTING SHOULDER — I -� - PROPOSED RIP RAP- 0 END .' TOP VIEW SHOULDER OF PIPE UNDIEWCWT ( antxLw _ NOT _ TO SCALE.... ......... DITCH'' Kim EXCAVATION ABOVE NWL° FINISHED EARTH SLOPE AS REWIRED 9'v/ x 6'L x i:6'd = 86 CUBIC FEET 3 CUBIC YARDS EXCAVATION BELOW NWLa ul PROPOSED RIP RAP Q END rq Or PIPE !l'w x 48'L x L2'd = 634 CUBIC FEET 24 CUBIC YARDS Form DCM MP-1 (Page 5 of 5) APPLICATION for Major Development Permit M®rehGad Citye I° I COMPLETE THIS DELIVERY ;.ENDER: COMPLETE THIS SECTION A. Sig ature ■ Complete items 1, 2, and 3. Also complete Agent item 4 if Restricted Delivery is desired. X .�� ❑ Addressee ■ Print your name and address on the reverse C. Date of Delivery so that we can return the card to you. B. Received by ( nted Name) C 2,2 ■ Attach this card to the back of the mailpiece, or on the front if space permits. D. Is delivery address different from item 1? Yes 1. Article Addressed to: If YES, enter delivery address below: ❑ No 9 C- )4&)) 7-4-1 3. Se ceType / Certified Mail ❑ Express Mail 5� �(� L I lv C— ❑ Registered ❑ Return Receipt for Merchandise 2 Q 5-7-7 ❑ Insured Mail ❑ C.O.D. G� 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number 7008 114 0 0 0 0 2 0397 3779 (Transfer from service labeq PS Form 3$11, February 2004 Domestic Return Receipt 102595 o2-M-tsao ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse A. Sign X ❑Age nt ❑ Addressee B. Rebaved by ( Printed m) ate of Delivery , so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. D. Is delivery add 'Rem 1. Yes If YES, enter deli s l, No 1. Article Addressed to: t�} a 12>b7 Ev4r'3 3. ServeeType VCertified Mail ❑ Express Mall 1_ r4G Zp cJ 5 D ❑ Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number (ransfer from service label) 7008 1140 0002 0397 3755 PS Form 3811, February 2004 Domestic Return Receipt 102595-02-M-1540 Unit Page North Carolina Deaartment of Transportation Page 1 of L ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: �AJi9 * �Q�Sc•N1 Vd��I�ibV1' PY) I DD I e_--I-Dw►.1 1 P6 ) 9-10� 2. Article Number (Transfer from service label) PS Form 3811, February 2004 MEr7.l�l A. Sign lure - ❑ Agent VV X ❑ Addressee B. Received by (Printed Name) eof livery �rl D. Is delivery address different from ite ❑ es If YES, enter delivery address below: ❑ No 3. Serv' e Type Certified Mail ❑ Express Mail ❑ Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 7008 1140 0002 0397 3748 Domestic Return Receipt ■ Complete items 1, 2, and 3. Also complete A. Sign1ature item 4 if Restricted Delivery is desired. X / j ■ Print your name and address on the reverse so that we can return the card to you. ed by (Pritite ■ Attach this card to the back of the mailpiece, or on the front if space permits. n s elivery add 1. Article Addressed to: z:15 7 Al L C y��J66 3. 6r.41 "'4 L r IN C- Z'8 577 if YES, enter 102595-02-M-1540 r C. Date from Item 1? U Yes iss below: ❑ No L'Certified Mail ❑ Express Mail ❑ Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. t f 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number 7008 1140 0002 0397 3762 (Transfer from service label) 102595-02-M-1540 PS Form 3811, February 2004 Domestic Retum Receipt 13b CERTIFIED MAIL RETURN RECEIPT REQUESTED August 12, 2009 Thomas H. Gaskill, Heirs 1807 Evans Street Morehead City, NC 28557 To Whom It May Concern: AUG 1 9 2009 Morehead City CCm This correspondence is to notify you as an adjacent riparian landowner that the North Carolina Department of Transportation plans to replace pipes on -site of his/her property, Parcel 6947, located on SR 1385, Shell Hill Road in Carteret County. The sketch attached accurately depicts the proposed construction. Should you have objections to the proposed construction, please check the appropriate statement below, sign, date, and return as soon as possible to: Mr. Stephen Lane, Field Representative N.C. Dept. of Environment and Natural Resources Division of Coastal Management Morehead City District 400 Commerce Avenue Morehead City, City N.C. 28557 Written comments must be received by the Division of Coastal Management within 10 days of receipt of this notice. NO RESPONSE WITHIN 10 DAYS of receipt of the correspondence will be INTERPRETED AS NO OBJECTION. Sincer , I have no objection to the proposed project as described in this correspondence. I have objection to the project as presently proposed and have enclosed comments. — �qjjjL� v ,U2. (Signature) o l % 09 (Date) CERTIFIED MAIL RETURN RECEIPT REQUESTED August 12, 2009 David Valentovich and Marschi Valentovich 207 Acorn Drive Middletown, DE 19709 To Whom It May Concern: a ' r K p 41 AUG 24 2009 �Aorehead City This correspondence is to notify you as an adjacent riparian landowner that the North Carolina Department of Transportation plans to replace pipes on -site of his/her property, Parcel 2791, located on SR 1385, Shell Hill Road in Carteret County. The sketch attached accurately depicts the proposed construction. Should you have objections to the proposed construction, please check the appropriate statement below, sign, date, and return as soon as possible to: Mr. Stephen Lane, Field Representative N.C. Dept. of Environment and Natural Resources Division of Coastal Management Morehead City District 400 Commerce Avenue Morehead City, City N.C. 28557 Written comments must be received by the Division of Coastal Management within 10 days of receipt of this notice. NO RESPONSE WITHIN 10 DAYS of receipt of the correspondence will be INTERPRETED AS NO OBJECTION. Sincerely, hVL-41�— >61 I have no objection to the proposed project as described in this correspondence. 1 have objection to the project as presently proposed and have enclosed comments. 2A I (Signature) (Date)