Loading...
HomeMy WebLinkAbout54632_NC DOT_20100122❑CAMA / ❑ DREDGE & FILL f GENERAL PERMIT [-]New ❑Modification ❑Complete Reissue El Partial Reissue As authorized by the State of North Carolina, Department of Environment and Natural R(sources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC_ Applicant Name Address "-' V ' City y " ` State ` y i ZIP ` Phone # (i .)f Fax # ( ) Authorized Agent`i Affected ❑ CW DEW OPTA (DES ❑ PTS AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A ❑ PWS: ❑FC: ORW: yes / no PNA yes / no Crit.Hab. yes / no Previous permit # Date previous permit issued Project Location: County. Street Address/ State Road/ Lot #(s) Subdivision [11 Rules attached. J - " iJ City t ZIP Phone # ( ) River Basin Adj. Wtr. Body ~ ' '� F (nat /man /unkn) Closest Maj. Wtr. Body Type of Project/ Activity Pier (dock) length Platform(s) _ Finger pier(s) i -.. —i-- --- ---� r r (Scale: ; i ) �- Groin length number Bulkhead/ Riprap length avg distance offshore - - max distance offshore Basin, channel cubic yards Boat ramp Boathouse/ Boatlift Beach Bulldozing Other _ 1 { { I Gi E C u r. A - o I IC ifrr ,. i Shoreline Length SAV: not sure yes no Sandbags: not sure yes Moratorium: n/a no Photos: (Se.> no Waiver Attached: yes �o�'t A building permit may be required by: Notes/ Special Conditions !` "' t ° ' ' y i i � ©'--See note on back regarding River Basin rules. Agent or Applicant'Printed Name Signature "Please read compliance statement on back of permit" Application Fee(s) Check # Permit Officer's Signature Issuing Date Expiration Date i� Local PlanningJurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certifythatthis project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar- Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax: 919-733-1495 Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888ARCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax: 252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 DOM Mr-1 RECEIVED APPLICATION for JAN 2 2 2010 Major Development Permit Morehead City DCM (last revised 12127/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) North Carolina Department Of Transportation P-28 SR 1317, Orchard Creek Road Pamlico County WBS Element 213.206911 Applicant 1: First Name MI Last Name Jay B. Johnson Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State 1587 Greenville NC ZIP Country Phone No. FAX No. 27835 1587 us 252 - 830 - 3490 ext. 248 252 - 830 - 3341 Street Address (if different from above) City State ZIP Email jbjohnson@ncdot.gov 2. Agent/Contractor Information Business Name Agent/ Contractor 1: First Name MI Last Name Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State ZIP Phone No. 1 - - ext. Phone No. 2 - - ext. FAX No. Contractor # Street Address (►f different from above) City State ZIP Email <Form continues on back> Form DCM MP-1 (Page 2 of 5) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Pamlico JAN 2 2 2010 SR 1317, Orchard Creek Road Subdivision Name City Morehead City DCM T tate Zip Phone No. Lot No.(s) (if many, attach additional page with list) - - ext. I , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Neuse Tar Creek c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Neuse River e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ❑Yes ®No work falls within. None 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 70' (35' North and 35' South) N/A c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) (If many lot sizes, please attach additional page with a list) 3.2' ❑NHW or ®NWL e. Vegetation on tract Maintained Roadside Grasses f. Man-made features and uses now on tract Road g. Identify and describe the existing land uses adjacent to the proposed project site. Residential Property h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? N/A (Attach zoning compliance certificate, if applicable) []Yes ❑No ®NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes ❑No ®NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> m. (i) Are there wetlands on the site? ®Yes ❑No (ii) Are there coastal wetlands on the site? ®Yes ❑No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ®Yes ❑No (Attach documentation, if available) Form DCM MP-1 (Page 3 of 5) APPLICATION for Major Development Permit n. Describe existing wastewater treatment facilities. N/A o. Describe existing drinking water supply source. N/A storm water management or treatment systems. N/A 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ®Public/Govemment ❑Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The Existing 3@ 66" x 60' CMP Will Be Replaced By Proposed 2@ 103"x 71"x 60' CAAPA. The Proposed Pipes Will Keep The Roadway From Collapsing, Thus Preventing Possible Injury and Death. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. The Existing Pipes Will Be Removed and the Proposed Pipe Will Be Installed. Typical Roadway Construction Equipment Will Be Used, Including,But Not Limited To Tracked Excavators,Dump Trucks, Flat -Bed Trucks, Back-Hoes,And Boom Trucks. d. List all development activities you propose. Pipe Replacement and Asphalt Patching e. Are the proposed activities maintenance of an existing project, new work, or both? Both f. What is the approximate total disturbed land area resulting from the proposed project? 2120 ®Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ❑No ®NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. N/A i. Will wastewater or stonnwater be discharged into a wetland? MYes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA j. Is there any mitigation proposed? Yes ®No EINA If yes, attach a mitigation proposal. <Form continues on back> 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Form DCM MP-1 (Page 4 of 5) APPLICATION for Major Development Permit d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return ipts as pr�gf —th_at such owners have received a copy of the application and plats by certified mail. Such landowners must be advised they hav WW which to submit comments on the proposed project to the Division of Coastal Management. �A Name W. Grant Biesedker JAN 2 2 20to Phone No. tJ 'Wo►eheod Cffy DCIN Address 3330 Claude Brewer Road Loganville GA 30249 Parcel K081-87/1 Name River Dunes Corporation Phone No. Address P.O. Box 1505 New Bern, NC 28563 Parcel L10-3 Name Fred August Englert.11 Phone No. Address 2312 Merymount Drive Suwanee, GA 30024 Parcel K081-83-1 g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. None h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property ownet) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7, Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date December 3, 2009 Revised January 21, 2010 Print Name _Jay B. Johnson Signature Qxlc� U 0 Please indicate application attachments pertaining to your p oposed project. ®DCM MP-2 Excavation and Fill Information ®DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development ❑DCM MP-4 Structures Information Form DCM MP-2 RECEIVE® EXCAVATION and FILL CAN 2 2 2010 (Except for bridges and culverts) Morehead City pCIN Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization Length Width Avg. Existing NA NA Depth Final Project NA NA Depth 1. EXCAVATION ®This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. c. (i) Does the area to be excavated include coastal wetlands/marsh d. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None (ii) Describe the purpose of the excavation in these areas: High -ground excavation in cubic yards. 2. DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable a. Location of disposal area. b. Dimensions of disposal area. c. (i) Do you claim title to disposal area? ❑Yes ❑No [_]NA (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of disposal in these areas: d. (i) Will a disposal area be available for future maintenance? ❑Yes ❑No ❑NA (ii) If yes, where? f. (i) Does the disposal include any area in the water? ❑Yes ❑No ❑NA (ii) If yes, how much water area is affected? jinn a-1.4 Fite., Page 2 of 2 9 ) 3. SHORELINE STABILIZATION ❑This section not applicable (If development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: ❑Bulkhead ®Riprap ❑Breakwater/Sill ❑Other: c. Average distance waterward of NHW or NWL: e. Type of stabilization material: Class B Marl g. Number of square feet of fill to be placed below water level. Bulkhead backfill Riprap 35' North 35' South Breakwater/Sill Other i. Source of fill material. b. Length: 70' (35' North And 35' South) Width: 5' d. Maximum distance waterward of NHW or NWACEIVED JAN2�96nJ— f. (i) Has there been shoreline erosion d��}[eceding 12 months? "`'"''���CC11tltl Gjy pCU ❑Yes ®No ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. Class B Marl 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? LJYes LJNo LJNA b. (i) Will fill material be placed in coastal wetlands/marsh ((;W), If yes, submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the (ii) Amount of material to be placed in the water number of square feet affected. (iii) Dimensions of fill area ❑CW ❑SAV ❑SB (iv) Purpose of fill OWL ❑None (ii) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b controlled? Silt Fences and Rip Rap c. (i) Will navigational aids be required as a result of the project? d ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. What type of construction equipment will be used (e.g., dragline, backhoe, or hydraulic dredge)? Typical Road Construction Equipment (i) Will wetlands be crossed in transporting equipment to project site? ❑Yes ®No ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. December 3, 2009 Revised January 21, 2010 Jay B. Johnson Date Applicant �%' P-28 SR 1317,Orchard Creek Road,Pipe Replacement WBS Element Number 213.206911 Applicant Sig a re Project Name I RECENE� ; Form IN MP-5 UAN 2 2 2010 BRIDGES and CULVERTS 'Wo.®heodCOY DQ, Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. BRIDGES ®This section not applicable a. Is the proposed bridge: ❑Commercial ❑Public/Government ❑Private/Community C. Type of bridge (construction material): b. Water body to be crossed by bridge: d. Water depth at the proposed crossing at NLW or NWL: e. (i) Will proposed bridge replace an existing bridge? ❑Yes ❑No f. (i) Will proposed bridge replace an existing culvert? ❑Yes ❑No If yes, If yes, (ii) Length of existing bridge: (ii) Length of existing culvert: (iii) Width of existing bridge: (iii) Width of existing culvert: (iv) Navigation clearance underneath existing bridge: (iv) Height of the top of the existing culvert above the NHW or (v) Will all, or a part of, the existing bridge be removed? NWL: (Explain) (v) Will all, or a part of, the existing culvert be removed? (Explain) g. Length of proposed bridge: h. Width of proposed bridge: i. Will the proposed bridge affect existing water flow? ❑Yes ❑No j. Will the proposed bridge affect navigation by reducing or If yes, explain: increasing the existing navigable opening? ❑Yes ❑No If yes, explain: k Navigation clearance underneath proposed bridge: I. Have you contacted the U.S. Coast Guard concerning their approval? ❑Yes ❑No If yes, explain: m. Will the proposed bridge cross wetlands containing no navigable n. Height of proposed bridge above wetlands: waters? ❑Yes []No If yes, explain: t. CULVERTS El This section not applicable a. Number of culverts proposed: 2 b. Water body in which the culvert is to be placed: Tar Creek < Form continues on back> Form DCM MP-5 (Bridges and Culverts, Page 2 of 4) RECSVEC; c. Type of culvert (construction material): r "Crehe" %;Ify JAN 2 2 2010 CAAPA 4 fi DCM d. (i) Will proposed culvert replace an existing bridge? ❑Yes ®No If yes, (ii) Length of existing bridge: (iii) Width of existing bridge: (iv) Navigation clearance underneath existing bridge: _ (v) Will all, or a part of, the existing bridge be removed? (Explain) f• Length of proposed culvert: 60' h. Height of the top of the proposed culvert above the NHW or NWL. 1.6' j. Will the proposed culvert affect navigation by reducing or increasing the existing navigable opening? ❑Yes ®No If yes, explain: e. (i) Will proposed culvert replace an existing culvert? ®Yes []No If yes, (ii) Length of existing culvert(s): 60' l'- i-; 5-" ,., (iii) Width of existing culvert(s):.W' 61. (iv) Height of the top of the existing culvert above the NHW or NWL: 1.0' (v) Will all, or a part of, the existing culvert be removed? (Explain) All of the Existing Culverts Will be Replaced 9• Width of proposed culvert: 103" i. Depth of culvert to be buried below existing bottom contour. 1' k. Will the proposed culvert affect existing water flow? If yes, explain: ❑Yes ®No 3. EXCAVATION and FILL ❑This section not applicable a. (i) Will the placement of the proposed bridge or culvert require any excavation below the NHW or NWL? ®Yes [-]No If yes, (ii) Avg. length of area to be excavated: North 10' South10' (iii) Avg. width of area to be excavated: 2.5' North South 2.5' (iv) Avg. depth of area to be excavated: 4_5' (v) Amount of material to be excavated in cubic yards: 17 Cubic Yards c. (i) Will the placement of the proposed bridge or culvert require any high -ground excavation? ®Yes [:]No If yes, (ii) Avg. length of area to be excavated: 60' (iii) Avg. width of area to be excavated: 40' (iv) Avg. depth of area to be excavated: 2_3' (v) Amount of material to be excavated in cubic yards: 204 Cubic Yards b. (i) Will the placement of the proposed bridge or culvert require any excavation within coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ®CW 180 So.Ft. ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of the excavation in these areas: Pipe Bedding arm DCM MP-5 (Bridges and Culverts, Page 3 of 4) d. If the placement of the bridge or culvert involves any excavation, please complete the following: zrt (i) Location of the spoil disposal area: Temporary Spoil Area is in the Existing Road 'Y , , 2® 4to1Z e E (ii) Dimensions of the spoil disposal area: 100' x 200' '" clf _ (iii) Do you claim title to the disposal area? ®Yes [:]No (If no, attach a letter granting permission from the owner.) C1W (iv) Will the disposal area be available for future maintenance? ®Yes ❑No (v) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAVs), other wetlands (WL), or shell bottom (SB)? ❑CW ❑SAV OWL ❑SB ®None If any boxes are checked, give dimensions if different from (ii) above. (vi) Does the disposal area include any area below the NHW or NWL? ? ❑Yes NNo If yes, give dimensions if different from (ii) above. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed below NHW or NWL? ®Yes ❑No If yes, (ii) Avg. length of area to be filled: North 35' South 35' (iii) Avg. width of area to be filled: 5' North and 5' South (iv) Purpose of fill: Pipe Bedding (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed on high -ground? ❑Yes NNo If yes, (ii) Avg. length of area to be filled: (iii) Avg. width of area to be filled: (iv) Purpose of fill: (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed within coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. NCW 180 Sq. Ft. ❑SAV ❑SB ❑WL ❑None (ii) Describe the purpose of the excavation in these areas: Pipe Bedding a. Will the proposed project require the relocation of any existing b. Will the proposed project require the construction of any temporary utility lines? ❑Yes NNo detour structures? ❑Yes NNo If yes, explain: If yes, explain: If this portion of the proposed project has already received approval from local authorities, please attach a copy of the approval or certification. < Form continues on back> MP-5 (Bridges and Culverts, Page 4 of 4) C. Will the proposed project require any work channels? ❑Yes ®No If yes, complete Form DCM-MP-2. e. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? Typical Bridge Construction Equipment g. Will the placement of the proposed bridge or culvert require any shoreline stabilization? ®Yes ❑No If yes, complete form MP-2, Section 3 for Shoreline Stabilization only. December 3,2009 Revised January 21, 2010 Date P-28 SR 1317, Orchard Creek Road, Pipe Replacement, Pamlico County WBS Element Number 2B.206911 Project Name Jay B.Johnson Applicant Names Applicant Signature How will excavated or fill material be kept o site ang rosioncFOV controlled? Turbidity Curtains and Silt Fences will be �t% b sediment on -site gbh to®� ? ,® ®C.t Will wetlands be crossed in transporting equipment to project site? ❑Yes ®No If yes, explain steps that will be taken to avoid or minimize environmental impacts. i SUMMARY OF AFFECTED PROPERTY OWNERS TRACT 11tUMBER PROPERTY OU tER !BAN 2 2 2010 `�D S mi City oc K081-8717 W. Grant Biesecker 3330 Claude Brewer Road Loganville, GA 30249 L10 3 River Dunes Corporation P.O. BOX 1505 416—A Pollock Street New Bern NC 28563 K081-83 I Fred August Englert, II 2312 Merrymount Drive Suwanee, GA 30024 RECEIVED UAN 2 2 2010 P-28 Pipe Replacement, SR 1317, Orchard Creek Ro fthepdco,0, g� Pamlico County Replace Existing 3 @ 46$"x 60' CMP With Proposed 2@ 10399x 71"x 60' CAAPA N 35A-04'-34" W 76A-37'-21" Erosion Control Schedule • Install erosion/sediment control measures according to plans. • Grading of slopes; 1.5: 1= stabilize with Class B riprap • Seed all disturbed areas as soon as final grading is completed. • Clean out and/or rework all temporary sediment control measures after significant rainfall event (or as otherwise needed). These measures should be maintained until a permanent vegetative cover is established and project is complete Pipe Installation Schedule • Install erosion/sediment control devices per plans. • Remove material while limiting, as much as possible, material and sediment from entering the stream and/or escaping from the project. • Prepare pipe foundation while taking care to limit material and sediment from entering the stream and/or escaping from the project. Where possible new grade should be below the existing streambed. Bedding material will be washed stone. • Place new pipe and compact fill. • Install slope protection on outlet and inlet ends of pipe (Class B Granite riprap) • Establish permanent vegetation as soon as possible • Remove sediment control devices after project has stabilized and permanent vegetative cover is established. PIPE REPLACEMENT OFP-28 l �J%� 2 2010 SR 1317, ORCHARD CREEK ROAD OVER TAR CREEK IWOrehead City ACM EXISTING 3@ 60 "x 60' CMP PROPOSED 2@ 103"x 71 "x 60' CAAPAA BROAD CREEK USGS QUAD MAP WBS ELEMENT NUMBER: 2B.206911 SHEET NUMBER 9 OF THE SOIL SUR VEY OF PAMLICO COUNTY FIRM PANEL 7408 J MAPNUMBER 3720740800 J NOVEMBER 24, 2009 Qe� 0 a �Cf a 61 Pami C) n � F �a�rL Fa PIPE REPLACEMENT Y= 491111.1555 X= 2 711224.913 7 N 35^-04'--34" W 76A-37'--21 " N 35.076017 DEGREES W 76.622583 DEGREES S v da�dCr 0 700 1,400 2,800 4,200 5,600 "' eel Rd Feet co RECEIVED PIPE REPLACEMENT OF P-28 �Q SR 1317, ORCHARD CREEK�(�f4D OVER TAR CREEK "oreheQcf City ®C EXISTING 3@ 14 "x 60' CMP PROPOSED 2@ 103 " x 71 " x 60' CAAPAA BROAD CREEK USGS QUAD MAP WBS ELEMENT NUMBER: 2B.206911 SHEET NUMBER 9 OF THE SOIL SURVEYOFPAMLICO COUNTY FIRM PANEL 7408 J MAP NUMBER 3720740800 J NOVEMBER 24, 2009 cP m A N 1p m N � � W E N� a N ,p C D p � L O � oa o Po or e z Pam `co 707 S� w Ke a Ra cP,p per Dr PIPE REPLACEMENT Y= 491111.1555 X= 2711224.9137 N 35^-04'--34" W 76A-37'--21 " N 35.076017 DEGREES W 76.622583 DEGREES 0 2,9505,900 11,800 17,700 23,600 Feet PIPE REPLACEMENT OF P-28 f 'JAN 2 2 WON . SR 1317, ORCHARD CREF�KRO� OVER TAR CREEK , EXISTING 3@ 48"x 60' CHP Morehead City 4C PROPOSED 2@ 103 " x 71 " x 60' CAAPAA BROAD CREEK USGS QUAD MAP WBS ELEMENT NUMBER: 2B.206911 SHEET NUMBER 9 OF THE SOIL SURVEY OF PAMLICO COUNTY FIRM PANEL 7408 J MAPNUMBER 3720740800 J NOVEMBER 24, 2009 :y �I W J. S� — O� 1,. . is :.�,.,, a '� -, ; . lie }lt s _3 _—Fork Pt Pai 5 '3 tc; 1 V ,, y brace n; is ('4 m ` , � + o h.ma cats ( C re s k i � stiate Pd rt a .' .' r Granf'eyard ..:r f, -,try �'�� — .�) F% F � V•J _ i !' � � t __ •z. At I / `fit PIPE REPLACEMENT �--� Y= 491111.1555 X= 2 711224.913 7 N35^-04'--34" W 76^-37'--21 " N 35.076017 DEGREES W 76.622583 DEGREES O rj) . Gurs+j Thicket ��tfix.t� 0 7001,400 2,800 4,200 5,600 Feet I� TAR CREEK MARSH SA;HOW;NSW �i NEUSE RIVER BASIN RIPARIAN BUFFER K081-8711 PROPOSED RULES APPLY LIO-3 `� W. GRANT BIESECKER LOWER NEUSE TURBIDITY CUR AINHUC RIVER DUNES CORPORATION GP�� 3330 CLAUDE BREWER ROAD CODE 03020204 P.O. BOX 1505 LOGANVILLE, GA 30249 Bl �x x—� 416-A POLLOCK STREET DB 167, PG 330 140 Sq. Ft. CAMA IMPACTS k NEW BERN, NC 28563 30 Sq. Ft. BZI IMPA TCTC S \ 35' DBK. 419, Pg. 398 PCA 132-5 EXISTING RiW MARSH + B2 EXISTING R/W CAMA FLAGS 8' l35 Sq. Ft. OPEN I I I I WATER IMPACTS I I I I 40 Sq. Ft. BZl IMPACTS CAMA LINE I I EXISTING EP I 1 EXISTING 3@ - 8q x 60, CUP ! 1 EXISTING EP 0.96 MILES TO JCT. SR 1320 PROPOSED 2@ l03" x 7/" x60' CAAPA ^� PAMLICO ROAD I I 2.1 MILES TO JCT SR 1375 I I I I N 35°-04`-34" PENINSULA DRIVE 1 1 I I W 76°-37'-2/" SR /3/7 EXISTING EP CAMA LINE ! I I I Y= 491111.1555 ORCHARD CREEK ROAD EXISTING EP ! X = 2711224.9157 B4 I I l0 Sq. Ft. BZI IMPACTS 1 I ! CAMA FLAGS B3 40 Sq. Ft. CAMA IMPACTS ! 225 Sq. Ft. OPEN J' 7 —WATER IMPACTS /0 EXISTING R/W / \ 35 5 Sq. Ft. BZI IMPACTS EXISTING R/W ✓ �i k S k�- PROPOSED LIO -3 K08/ -83 -1 MARSH _X x X TURBIDITY CURTAIN RIVER DUNES CORPORATION FRED AUGUST ENGLERT, Il DECEMBER 3, 2009 P.O. BOX /505 2312 MERRYMOUNT DRIVE CAMA GP APPLICATION 416-A POLLOCK STREET SUWANEE, GA 30024 SR 1317, ORCHARD CREEK R A_ OVER TAR CREEK �/ �i NEW BEfW, NC 28563 OB 497, PG 171 EXISTING 3@ �' 60rCMP u`� DBK.#19, ft. 398 MB.6, Pg. 84 `� N PROPOSED 2@ 103"x 71" x 60' CAAPA Pf 4 /to FIRM PANEL 7408 J BROAD CREEK USGS QUAD MAP \1 SCALE: P'=20'gR MAP NUMBER 37200740800 J SHEET NUMBER 9 OF THE SOIL SURVEY REVISED: JANAURY 2/, 20/0 8 WBS ELEMENT NUMBER : 2B.2 � 6911 OF PAMLICO COUNTY NEUSE RIVER BASIN COD NEUSE RIPARIAN BUFFER RULES APPLY PROJECT NO. 2Be206911 CROSS SECTION OF DATE NOVEMBER 25, 2009 PIPE REPLA CEME11tT REcavEr, ROAD SR 1317 ROAD NAME ORCHARD SR 1317 ORCHARD CREEK 102010 CREEK ROAD PAMLICO COUNTY I"Of8hGod city IDcA, COUNTY PQLICO REVISED JANUARY 21,2010 ROAD EXISTING 3 o 669 x 60' CMP SR 1317 4 0' 2.3' NWL C dd' z 64 405' 0' 1.fP ' dd' z 60' Or1P dd' z 60' CMP NOT TO SCALE PROPOSED 2@ 1OT x 7r x 60' CAAPA 301 SR 1317 SH 1317 2.8' NORMAL WATER LEVEL AREA TO BE EXCAVATED AND BACKFiLLED 4.5' .103'.71iW C"A 4/ .103'z7 *A6W C"A �YMII%Y ee:anAc � H � W W EXISTING STREAMBED w w w W O UNDERCUT AND BACTffILL PROPOSED RIP RAP Q END I o TOP VIEW a OF PIPE o z o o F N U uj X 35' w 0W �w W _ P P/ srp CREEK CREEK EXCAVATION ABOVE NWL: 40'w X 60'L x 2.3'd = 204 CUBIC YARDS FINISHE❑ EARTH SLOPE AS REQUIRED EXCAVATION BELOW NWL: \ PROPOSED RIP RAP o END 5'w x 20'L x 4.5'd = I7 CUBIC YARDS I OF PIPE I I r RLT WIN TY►E `S' LEGEND SHEET DIFFUSE FLOW THROUGH WETLA DS VEGETATED UPLANDS BEFORE ENTERING WET AD \ w TYPICAL EACH C T�L LEGEND. w TEMPORARY ROCK SILT CHECK 1. 1 > TYPE -A UPLANDS / w d a SLT BASIN TYPE 8 W U- TEMPORARY ROCK SILT CHECK TYPE -A .. TEMPORARY ROCK SlT CHECK TYPE-8 aQ o ^.��•.*--.+-- TEMPORARY 917 FENCE SILT BASIN iYPE-B o w GRABS BREAK a W I DIRECTION OF FLOW W I III' - WOODSLINE t�~ DIFFUSE FLOW DETAIL DIFFUSE FLOW TE%PORRTTY R v":( GILT CHECK TYPE '3' DI�iCII tllE �`..�®SE OF FAYEEENT ITAUMUL STME r< ' IEOE mic VIEW pit or DIYW 1, lam. KMATUMML WOM it. it. WIN CROSS SECTION SILT CKYMIMENT TRAPEZOIDAL DITCH ELEVATION V191 NTS ------- 404 WETLANDS FILL AREA 20' ]0 -- NEUSE RIVER RIPARIAN BUFFER t tlfp —------- 404 WETLANDS * -- COASTAL WETLANDS GL � GL � '--- CRASS LINED CHANNEL ----OPEN WATER IMPACTS IEOTIOX !•! T • tt• Yp.� tt� YU, Fl wn SECTION A•A TEMPORARY ROCK SILT CHECK TYPE —A PROPOSED SILT FENCE WETLAND VAR.O'-G' EDGE OF EXIST. ROAD EXISTING FILL UTILITIES LEGEND, TYPICAL EACH SHEET POWER POLE AG TELEPHONE PEDESTAL © CABLE TV PEDESTAL (D SEWER CLEAN OUT ® WATER VALVE FIRE HYDRANT 0 WATER METER EIP0 EXISTING IRON PIPE + PROPERTY CORNER IL— PROPERTY LINE GRASS -LINED CHANNEL TRAPEZOIDAL DITCH SECTION z- X-SECTION AREA (A)= e0 IZD TOP WIDTH IT) - B F 2DZ AREA TO BE 6 FILLED OR �— UNDISTURBED AREA DISTURBED .1 FABRIC BURIED BELOW EXISTING GRA SILT FENCE DETAIL a � NTS = PROPOSEI!;kw F�E Fl ry VAR.O'-6' I WETLAND EDGE OF EXIST. ROAD VAI DIM LEGEND SHEET SPECIAL SEDIMENT CONTROL FENCE 3 FT. CONTROL STONE 4IN. I/ SEDIMENT CONTRO I FT, MIN. WATER FLOW \�ittL rU�/ - z ri.uttr W00D POST - 3 FT. DEEP GENERAL NOTES: USE NO.3 OR N0.57 STONE FOR SEDIMENT CONTROL AND PAY FOR AT THE CONTRACT UNIT PRICE PER TON SEDIMENT CONTROL STONE USE HARDWARE CLOTH 24 GAUGE WIRE MESH WITH %4 INCH MESH OPENINGS INSTALL 5 FT. SELF FASTENER ANGLE STEEL POST 2 FT. DEEP MINIMUM INSTALL 6 FT. LONG, 3 IN. DIA. WOOD POSTS 3 FT. DEEP MINIMUM SPACE POSTS A MAXIMUM OF 5 FT. TURBIDITY CURTAIN PUMP SILT BAG RECEIVEC CERTIFIED MAIL RETURN RECEIPT REQUESTED December 3, 2009 River Dunes Corporation P.O. Box 1505 416-A Pollock Street New Bern, NC 28563 To Whom It May Concern: �'Aorehoad City pCM 1-11 L , 0) More ead City DGM This correspondence is to notify you as an adjacent riparian landowner that the North Carolina Department of Transportation plans to replace pipes on -site of his/her property, Parcel L10-3, located on SR 1317, Orchard Creek Road in Pamlico County The sketch attached accurately depicts the proposed construction. Should you have objections to the Oroposed construction, please check the appropriate statement below, sign, date, and return as soon as possible to: Mr. Stephen Lane, Field Representative N.C. Dept. of Environment and Natural Resources Division of Coastal Management Morehead City District 400 Commerce Avenue Morehead City, N.C. 28557 Written comments must be received by the Division of Coastal Management within 10 days of receipt of this notice. NO RESPONSE WITHIN 10 DAYS of receipt of the correspondence will be INTERPRETED AS NO OBJECTION. Sincerely, on I have no objection to the proposed project as described in this correspondence. objection to the / Z// 7/a 9 (Date) as presently proposed and have enclosed comments. fi RECE1 ,r: 'JAN 2 2 2010 CERTIFIED MAIL RETURN RECEIPT REQUESTED December 3, 2009 Fred August Englert,II 2312 Merrymount Drive Suwanee, GA 30024 To Whom It May Concern Morehead City DCM Morehead ity DOM This correspondence is to notify you as an adjacent riparian landowner that the North Carolina Department of Transportation plans to replace pipes on -site of his/her property, Parcel K081-83-1 located on SR 1317, Orchard Creek Road in Pamlico County. The sketch attached accurately depicts the proposed construction. Should you have objections to the proposed construction, please check the appropriate statement below, sign, date, and return as soon as possible to. - Mr. Stephen Lane, Field Representative N.C. Dept. of Environment and Natural Resources Division of Coastal Management Morehead City District 400 Commerce Avenue Morehead City, N.C. 28557 Written comments must be received by the Division of Coastal Management within 10 days of receipt of this notice. NO RESPONSE WITHIN 10 DAYS of receipt of the correspondence will be INTERPRETED AS NO OBJECTION. Sincerely, d� I have no objection to the proposed project as described in this correspondence. I -obi n t© the project as presently proposed and have enclosed comments (Signature) tovij (Date) UN -NAMED TRIBUTARY 2288 OF WHITEHURST CREEK ' THE BAUGUS FAMILY, I IC P.O. BOX 517 MOREHEAD CITY, NC 28557 TIDAL D8K.1293, Pg. 482 I AREA I N COASTAL WETLAND IMPACTS = 40 Sq. Ft. OPLEN WATER IMPACTS = 40 Sq.Ft. EXISTING R/W 0.38 MILES TO SR 1341 STRAITS POINT ROAD EXISTmo ING EP EXISTING EP SR 1332 HARKER'S ISLAND ROAD N 32'-0l'-55' E EXISTING 60' x 59 CMP PROPOSED 73' x 55' x 59 CAAP 8701 UNDSEY TURNER AND NANCY TURNER 165 TURNERS FARM LANE REIDSVILLE, NC 27320 DBK. 423, Pg. 258 AREA 2 COASTAL WETLAND IMPACTS = 40 Sq. Ft. OPCEN WATER IMPACTS = 40 Sq.Ft. OJ8 MILES TO SR 1334 STRAITS CUT-OFF ROAD saw - low N 34' -44'-06.842" W 76-33'-30.771' 5' EXISTING R/W 3275 I c'J JOHN V. MERRINER AND NANCY MERRINER AREA 3 P.O. BOX 223 COASTAL WETLAND BEAUFORT, NC 28516 AREA 4 IMPACTS = 40 Sq. Ft. DBK.666,Pg.436 COASTAL WETLAND I ' " OPCEN WATER CAMA GP APPLICATION IMPACTS = 40 Sq. Ft. IMPACTS = 40 Sq. Ft. OPEN WATER NI -46 PIPE REPLACEMENT IMPACTS = 40 Sq. Ft. \ SR /332, HARKER'S ISLAND ROAD OVER UN -NAMED TRIBUTARY OF W HI TT EHURST CREEK SCALE: l " =20' EXISTING I@ 60" x 50' CMP PROPOSED 73" x 55" x 50' CAAP W BS ELEMENT NUMBER 2B.20161I NOV EMBER l0, 2009 WHITE OAK RIVER BASIN HARKER'S ISLAND USGS QUAD 8701 LINDSEY TURNER AND NANCY TURNER 165 TURNER'S FARM LANE REIDSVILLE, NC 27520 OBK. 423, Pg. 258 MAP C ompleteitems 1, 2, and 3. Also complete Is desired. estricted Delivery name and address on the reverse can return the card to you.is card to the baeck t the mailpiece, front if space p 1. Article Addressed to: (kip ,41lQ A A. Signal , ,_ L) . - ❑ Agent �� Y C. Date of Delivery B R eived b( nnted acne) t 2 different from item 1? [3 Yes D. 1s delivery address ❑ No If YES, enter delivery address below: 3, Service Type q Mail Certified Mail [3ExP p Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑Yes 2. Article Number 7009 0080 0002 4028 8202 102595-0� (Transfer from service label) Domestic Return Receipt ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: 2. Article Number (Transfer from service label) PS Form 3811, February 2004 A. A— B. Received by (ArintedoName) C. Date of Deliver ri2f� ��.eCLGAU(j ;I/z-,/oe D. Is delivery address different from item 1? ❑ Yes If YES, enter delivery address below: ❑ No 3. Service Type *3�Certifled Mail ❑ Express Mail ❑ Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 7009 0080 0002 4028 8103 Domestic Return Receipt ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: e/AIW ap_- A. Signature 102595-02-M-1540 X ,7 i ❑ Agent Addressee B. Receiv y ( Anted W C. Date of Delivery D. Is delivery addresd different from item 17 ❑ Yes If YES, enter delivery address below: ❑ No 3. Service Type "rtifled Mail ❑ Express Mail ❑ Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number (Transfer from service label) 7009 0080 0 0 0 2 4028 8196 PS Form 3811, February 2004 Domestic Return Receipt 102595.0244-1540 SR 1.3/-7 RECEIVED 1222010 ead City DCM